APPR. BY
REV DATE REVISION DESCRIPTION PRPD. BY CHKD. BY APPR. BY
CLIENT
CLIENT CONTRACTOR
FIELD GATHERING SYSTEM
TRUNKLINES DETAILED ENGINEERING
OMV (YEMEN BLOCK S2) BILL OF MATERIAL - CATHODIC PROTECTION GRIFFIN ENERGY LTD. /
ZEN CHEMTECH / RISK WRITERS
EXPLORATION GMBH
TABLE OF CONTENTS
1. INTRODUCTION .................................................................................................................................... 3
ABBREVIATIONS .................................................................................................................................. 4
3. REFERENCE DOCUMENTS.................................................................................................................. 6
1. INTRODUCTION
Griffin Energy Ltd. is pleased to support OMV (Yemen Block S2, Shabwah, Yemen)
Exploration GmbH (OMVY) to carry-out the Trunkline Detailed Engineering for two (2) 12”
Trunklines and one (1) 6” Trunkline buried between the existing Central Processing Facility
(CPF) and future three (3) Remote Manifold Stations (RMS) located at the existing EPF’s in
the field, covering an overall distance of approximately 22.443 km.
Approx.
SN Trunk Line No. From To
Length (Km)
1 TL-1 (6”) Planned RMS-1 Location CPF 3.550 km
2. SCOPE OF WORK
Corrosion protection of the external surface of the pipelines shall be provided with high
integrity coating systems, supplemented by cathodic protection.
This document defines bill of materials for temporary and permanent cathodic protection
associated with trunklines .
ABBREVIATIONS
Abbreviation Description
Abbreviation Description
3. REFERENCE DOCUMENTS
PROJECT DOCUMENTS
4. BILL OF MATERIALS
Internal circuit comprising Cu Bus bar, shunt, grid coil resistor, 6mm phenolic
panel, brass nut & bolts etc.,
Earthing provision 2 nos. ½" or m12 earthing bolts and security lock with SS316 l
material
FSBB c/w one copper bus bar to connect five (7)
3.1 individual circuits with 5A-50m V shunt. Incluisve of Ea 1
cable gland for access in the bottom
FSBB c/w one copper bus bar to connect five (3)
3.2 individual circuits with 5A-50m V shunt. Incluisve of Ea 5
cable gland for access in the bottom
CLIENT CONTRACTOR
FIELD GATHERING SYSTEM
TRUNKLINES DETAILED ENGINEERING
OMV (YEMEN BLOCK S2) BILL OF MATERIAL - CATHODIC PROTECTION GRIFFIN ENERGY LTD. /
ZEN CHEMTECH / RISK WRITERS
EXPLORATION GMBH