S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
2 Need to be clarified how it is initiated by ELICS? This function shall not be included in ELICS design. Hence removed from the document.
Page 12 of 113
3945_18-EL20613A-00167
3 Please clarify/confirm this function is included This function shall not be included in ELICS design. Hence removed from the document.
Page 12 of 113
3945_18-EL20613A-00167
5 Add VSR (Monitoring + control) Noted and Incorporated
Page 14 of 113
3945_18-EL20613A-00167
6 Add VFDG Noted and Incorporated as per comment 9 in row 20 of this CRS.
Page 15 of 113
3945_18-EL20613A-00167
7 Unclear if there is any control of HVAC in ELICS Noted and Incorporated
Page 15 of 113
3945_18-EL20613A-00167
9 Not clear what this. If GTG it is already covered. Noted and Incorporated. Equipment included with VDFG
Page 15 of 113
3945_18-EL20613A-00167
11 The interface shall be the RTU (RTU-6103) Noted and Incorporated
Page 17 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
12 Add the title Noted and Incorporated
Page 18 of 113
3945_18-EL20613A-00167 Please define where this interface will be. That is at SS-6502
13 Noted and Incorporated
Page 18 of 113 or at NMCB. Please state here
3945_18-EL20613A-00167
14 Add the title Noted and Incorporated
Page 19 of 113
3945_18-EL20613A-00167
16 What about software for cyber security server/ controller.
Page 20 of 113
3945_18-EL20613A-00167
17 If Windows 10 Enterprise LTSC, please mentioned it clearly. Noted and Incorporated
Page 20 of 113
3945_18-EL20613A-00167
19 Add the title Noted and Incorporated
Page 32 of 113
3945_18-EL20613A-00167
20 To be removed Noted and Incorporated
Page 34 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
Please add the same statement for the Gateways if both are
3945_18-EL20613A-00167
23 also active all the time. If not please explain the redundancy Both the gateways will be active all time to achieve redundancy.
Page 40 of 113
change-over.
3945_18-EL20613A-00167
26 General comment: add title to all the figures Noted and Incorporated
Page 43 of 113
What about the other substations listed in the table above The PMS network for the other substation will be communicating to the Master PMS controller by single
3945_18-EL20613A-00167
27 SS-6201, SS-6301, SS-7201, SS-7301, etc. ? how the PMS mode fiber optic communcation links. These links will be connected to the redundant aggregate switch
Page 46 of 113
network will be dispatched ? provided in substation SS-6501, 6502 and 7501.
3945_18-EL20613A-00167
28 WWR/WWT Noted and Incorporated
Page 47 of 113
3945_18-EL20613A-00167
29 WWT Noted and Incorporated
Page 49 of 113
3945_18-EL20613A-00167 The same data set and path used by both station gateways ?
30 Noted and Incorporated
Page 51 of 113 Shouldn't be DATSET2 and BRCB2 ?
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
Please add that the primary time source shall be NFE master
3945_18-EL20613A-00167 Noted and Incorporated
31 clock (provided by DCS) and the backup source shall be the
Page 51 of 113 Refer section - 6.8
GPS signal (provided by ELICS)
3945_18-EL20613A-00167
33 Received as a NTP signal? Yes, updated the section as per comment.
Page 52 of 113
3945_18-EL20613A-00167
34 Please mention antena provided by ELICS Noted and Incorporated
Page 52 of 113
3945_18-EL20613A-00167
36 To be added to the abbreviation list Noted and Incorporated
Page 53 of 113
3945_18-EL20613A-00167
39 No control based on outdoor temperature Noted and Incorporated
Page 53 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167 How the priorities are set between all generators and Explained in detail.
40
Page 53 of 113 Kahramaa ? Refer section 7
3945_18-EL20613A-00167 Including the power from generators taken out from the Explained in detail.
41
Page 53 of 113 PMS? Refer section 7
3945_18-EL20613A-00167
42 can also initiate Noted and Incorporated
Page 53 of 113
3945_18-EL20613A-00167
43 Frequency Noted and Incorporated
Page 53 of 113
3945_18-EL20613A-00167
45 Corresponding curves set in the PMS to be provided here.
Page 54 of 113
3945_18-EL20613A-00167
46 from which input data? Updated as per comment-39 in row-50. Refer Section-7.2
Page 54 of 113
3945_18-EL20613A-00167 So in base Load mode the machine is taken out from the
47 CTJV to provide control philosophy for Baseload mode.
Page 54 of 113 PMS?
3945_18-EL20613A-00167
48 To be detailed Noted and Incorporated
Page 54 of 113
3945_18-EL20613A-00167 This statement contradicts the first bullet point that states
50 Noted and updated the statement
Page 54 of 113 PMS will do that.
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
52 Synch. panel? PMS
Page 55 of 113
Please add that if the network is islanded from the grid and
3945_18-EL20613A-00167
55 only one generator is oneline, PMS will set that generator to Noted and Incorporated
Page 56 of 113
ISOCH mode. No PMS control will be active in that case.
3945_18-EL20613A-00167
56 occurs Occurs only if the turbine / generator is in auto mode
Page 56 of 113
What if only one GTG was online with the grid and was in
3945_18-EL20613A-00167
57 "Manual" or "MW" mode, then grid is opened. PMS should still PMS can only change the generator to ISOCH when the generator is in Remote and Auto.
Page 56 of 113
be able to change to ISOCH
3945_18-EL20613A-00167 Explained in detail.
58 Unclear
Page 56 of 113 Refer section 7.3.3
Not if operating as an island. To avoid confusion, split this
3945_18-EL20613A-00167 Noted and Incorportated.
59 section in different subsections each corresponding to a
Page 56 of 113 Refer section-7.3.4
network configuration
3945_18-EL20613A-00167 If generator is set to Remote, PMS will set the generator to
60 Noted and Incorporated
Page 56 of 113 ISOCH mode.
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167 If all generators set to remote and Auto, PMS will set the
63 Noted and Incorporated
Page 57 of 113 generators to DROOP mode.
3945_18-EL20613A-00167 refer to the section where the details of this control are
64 Part of same section - 7.3.3
Page 57 of 113 described.
3945_18-EL20613A-00167
65 in Remote and AUTO Noted and Incorporated
Page 57 of 113
3945_18-EL20613A-00167 refer to the section where the details of this control are
66 Part of same section - 7.3.3
Page 57 of 113 described.
For discussion: what about generators:
3945_18-EL20613A-00167
67 1) not in remote control Noted. To be discussed
Page 57 of 113
2) not set to Auto mode
This needs to include to check the generator is in remote +
3945_18-EL20613A-00167
68 Auto. Noted and Incorporated
Page 58 of 113
Please add these checks in the flow chart
3945_18-EL20613A-00167
69 please describe what is checked here. Is it ISOCH/DROOP? Noted and Incorporated
Page 58 of 113
3945_18-EL20613A-00167
70 Island + Noted and Incorporated
Page 58 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
71 selection Noted and Incorporated
Page 58 of 113
3945_18-EL20613A-00167
73 and Baseload mode CTJV to provide control philosophy for Baseload mode.
Page 58 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
83 Baseload mode is missing from above figure CTJV to provide control philosophy for Baseload mode.
Page 59 of 113
3945_18-EL20613A-00167 To also indicate what are the possible controls for reactive
84
Page 60 of 113 power (manual and / or automatic?)
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
this flow chart refers to start-up with one GTG only. Please
3945_18-EL20613A-00167
92 update the flowchart to reflect normal operation with multiple Noted and Incorporated
Page 63 of 113
generators, or add another.
3945_18-EL20613A-00167 here should include a step where the pulses are sent to the
93 Flowchart has been updated with clear details
Page 63 of 113 generators, correct?
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
97 please state which bus Noted and Incorporated
Page 64 of 113
Note: any power swing will first be compensated by the
3945_18-EL20613A-00167
98 generator governors. PMS shall then act as a secondary Noted and Incorporated
Page 64 of 113
regulator after steady condition is achieved.
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
Please include VFDG in the flow chart in details (e.g. all the
3945_18-EL20613A-00167
102 coditions from the VFDG should be part of the flowchart and
Page 65 of 113
description)
3945_18-EL20613A-00167
103 Automatically switch to voltage control?
Page 65 of 113
3945_18-EL20613A-00167
105 Describe also when pf target is achieved.
Page 65 of 113
3945_18-EL20613A-00167
107 Update Couplers Noted and Updated
Page 66 of 113
3945_18-EL20613A-00167
108 Please make the figure more legible.
Page 66 of 113
3945_18-EL20613A-00167
109 To be either described or removed.
Page 66 of 113
3945_18-EL20613A-00167
110 Indications difficult to read.
Page 66 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
111 Update Couplers Noted and Updated
Page 67 of 113
3945_18-EL20613A-00167
112 + CB ready to close Already mentioned - "Permissive to Close"
Page 67 of 113
3945_18-EL20613A-00167
113 ? Noted and Updated
Page 67 of 113
3945_18-EL20613A-00167
114 2 bus couplers available. Selection to be reflected. Noted and Incorporated
Page 67 of 113
3945_18-EL20613A-00167 To indicate link with ELICS / PMS console for remote synch.
115 Noted and Incorporated
Page 67 of 113 Request
3945_18-EL20613A-00167
119 shouldn't these be two input signals separately Currently considered as a single signals where state 0= Bus A and 1= Bus B
Page 68 of 113
3945_18-EL20613A-00167
120 both positions to be monitored or only one? Both posiiton can be monitored.
Page 69 of 113
3945_18-EL20613A-00167
121 110VAC or 4-20 mA? 110VAC
Page 70 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
122 Update Couplers Noted and Updated
Page 70 of 113
3945_18-EL20613A-00167
123 To be detailed Noted and Incorporated
Page 71 of 113
3945_18-EL20613A-00167
124 See comments 6.3.9.2. Noted and Incorporated
Page 71 of 113
3945_18-EL20613A-00167
125 Update Couplers Noted and Incorporated
Page 71 of 113
3945_18-EL20613A-00167
126 add titles to all Figures / Sketchs Noted and Incorporated
Page 71 of 113
3945_18-EL20613A-00167
127 Same comments as SS-6500 Noted and Incorporated
Page 72 of 113
3945_18-EL20613A-00167
128 Same comments as SS-6500 Noted and Incorporated
Page 76 of 113
3945_18-EL20613A-00167
130 at the synchronization panel Noted and Incorporated
Page 78 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
133 Generators controlled by each synch. panel to be listed
Page 78 of 113
3945_18-EL20613A-00167
135 at the synchronization panel Noted and Incorporated
Page 78 of 113
3945_18-EL20613A-00167
136 is this duplicate? Sentence has been rephrased
Page 78 of 113
3945_18-EL20613A-00167
137 Describe also synch. failure (as per section below). Noted and Incorporated
Page 79 of 113
3945_18-EL20613A-00167
138 always Noted and Incorporated
Page 79 of 113
This is valid for bus coupler only, if yes, please please state
that.
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
143 To be discussed Noted
Page 82 of 113
3945_18-EL20613A-00167
144 and/or Noted and Incorporated
Page 85 of 113
3945_18-EL20613A-00167
145 than what Noted and Incorporated
Page 85 of 113
3945_18-EL20613A-00167
148 NFE1-SEL-EL-SDR-00007
Page 86 of 113
3945_18-EL20613A-00167
149 Please define in details, i.e. from GCP's via analogue signals Noted and Incorporated
Page 86 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
157 To be developped Noted
Page 87 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
163 To be updated based on comments above.
Page 89 of 113
As discussed in the meeting, please include the flowchats
3945_18-EL20613A-00167
164 with full details as to how the LSS controller calculates or
Page 89 of 113
measures the values at each step
How is this determined.
3945_18-EL20613A-00167
165
Page 89 of 113 After this there should be two lines, if network is split and if
network is not split, please show complete.
3945_18-EL20613A-00167
166 Please define what is this set Limit
Page 89 of 113
This should be:
3945_18-EL20613A-00167
167 loads to be shed shall be the priority group corresponding to
Page 89 of 113
the Load to be shed or next priority.
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
Please include:
1. When load shedding is activated, the signal shall be kept
active to prevent restarting, until a LS RESET is given.
3945_18-EL20613A-00167
168 2. LS RESET can only be given by Supervisor level at the
Page 89 of 113
ELICS workstation.
3. Motors not running shall be inhibited to start until a LS
RESET is made.
3945_18-EL20613A-00167
169 Please define this special permission Noted and Incorporated
Page 90 of 113
3945_18-EL20613A-00167
170 shedding list? Yes, Noted and Updated
Page 90 of 113
3945_18-EL20613A-00167
172 what is the aim/benefit of this list? Noted and Incorporated
Page 91 of 113
3945_18-EL20613A-00167 It is not clear the difference between this list and the LS list
173 Updated the section with more details
Page 91 of 113 in the next page.
3945_18-EL20613A-00167
174 Please change to "LS Enabled" Noted and Incorporated
Page 91 of 113
3945_18-EL20613A-00167
175 Please change to "LS Disabled" Noted and Incorporated
Page 91 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
178 (post shedding operation) Noted and Incorporated
Page 91 of 113
3945_18-EL20613A-00167
179 Special permissions to be defined here Noted and Incorporated
Page 92 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
To simplify the essential load shedding, the principle has
3945_18-EL20613A-00167 been revised: the response to the loss of an EDG shall be the
185 Noted
Page 94 of 113 trip of 6.6/0.415kV transformer feeders (see list 10.3.1.2 of
the Operation and Control Philosophy)
3945_18-EL20613A-00167 A table with all the priorities / transformer and their priorities
186 Priority details of transformers to be provided
Page 94 of 113 to be included.
3945_18-EL20613A-00167 Safety margins shall be set based on unit data sheets, and
187 Noted and Incorporated
Page 94 of 113 not Supervisor.
3945_18-EL20613A-00167
188 update above Noted and Incorporated
Page 94 of 113
3945_18-EL20613A-00167 what are the difference between this setting and the
189
Page 95 of 113 maximum & minimum setting as described in PMS section
3945_18-EL20613A-00167 to ensure they are open (though they should already be open
192 Noted and Incorporated
Page 96 of 113 by undervoltage protection
3945_18-EL20613A-00167
193 send opening commands to Noted and Incorporated
Page 96 of 113
3945_18-EL20613A-00167
194 (see flow chart next section) Noted
Page 96 of 113
3945_18-EL20613A-00167
195 reconfiguration of the 33 kV network followed by the Noted and Incorporated
Page 96 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
This should be as per the design and transformer
3945_18-EL20613A-00167
197 energization study. Operator may be given option to change Noted
Page 96 of 113
if required.
3945_18-EL20613A-00167
198 Update control Noted and Incorporated
Page 96 of 113
3945_18-EL20613A-00167
199 once the EDGs start, Noted and Incorporated
Page 96 of 113
3945_18-EL20613A-00167
200 Update overloaded, (tentative), acceptable Noted and Incorporated
Page 96 of 113
3945_18-EL20613A-00167
202 To be defined by Energization study Noted
Page 96 of 113
closing of 11kv, 6.6kV & 415V to occur only after the EDG's
3945_18-EL20613A-00167
203 are online and dead paralleling is complete and voltage is Updated the flowchart according to Operation and Control Philosophy Rev1
Page 97 of 113
stable
3945_18-EL20613A-00167 To be updated according to rev. 1 of the Operation and
204 Noted and updated
Page 97 of 113 Control Philosophy.
3945_18-EL20613A-00167
205 This should be managed by EDGs - to be discussed Updated the flowchart according to Operation and Control Philosophy Rev1
Page 97 of 113
CRS
658480324.xlsx
Comments Response Sheet (CRS) Project No / Title LTC/C/NFE/3945/18 - NORTH FIELD EAST PROJECT Onshore LNG Facilities
Review Details
S/No Section/Para/Dwg. CPY Comments Vendor's Reply
3945_18-EL20613A-00167
208 after a total blackout Noted and Incorporated
Page 98 of 113
3945_18-EL20613A-00167
209 ELICS EPDCS Noted and Incorporated
Page 98 of 113
CRS