SUBMITTAL OF
COPIES REQUIRED
NOTE: BIDDER TO COMPLETE COLUMN 5 AND RETURN COMPLETED FORM WITH REQUIRED DRAWINGS,
HIS QUOTATION. MANUALS, ETC.
HARD COPIES
SOFT COPY
PRIORITY
NO. OF DUE
DESCRIPTION CALENDAR DATES
WEEKS
601. PRELIMINARY DRAWINGS AND DATA FOR REVIEW AND APPROVAL BY BUYER.
1. ALL DATA AS SPECIFIED IN API 560, PARAGRAPH 1.8.1. 1
2. COMPLETED NOISE DATA SHEET (SAUDI ARAMCO FORM NO. 7305). 1
3. COMPLETED API 560 DATA SHEETS. 1
4. FOUNDATION LOADING DIAGRAM IN ACCORDANCE WITH API 560, PARAGRAPH 1.8.2. 1
5. CATALOG DATA FOR AUXILIARY EQUIPMENT. 1
6. CALCULATIONS FOR PRESSURE PARTS. 1
7. MATERIAL LISTS FOR ALL PRESSURE AND NONPRESSURE PARTS. 1
8. COMPOSITE ENGINEERING/SUB-VENDOR MATERIAL/PROCUREMENT/FABRICATION/ 1
TESTING SCHEDULE.
NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA BIDDER'S SIGNATURE:
SUBMITTED.
(B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG
IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN.
(C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED,"
THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED,"
THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT
COMPANY:_______________________________________
CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS. BIDDER'S REF. NO.:__________________________________
(D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL
REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER.
DATE:_____________________________________________
(E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED.
Saudi Aramco 7900 (08/06) Page 2 of 3
1 2 3 4 5 6
SUBMITTAL OF
COPIES REQUIRED
NOTE: BIDDER TO COMPLETE COLUMN 5 AND RETURN COMPLETED FORM WITH REQUIRED DRAWINGS,
HIS QUOTATION. MANUALS, ETC.
HARD COPIES
SOFT COPY
PRIORITY
NO. OF DUE
DESCRIPTION CALENDAR DATES
WEEKS
NOTES: (A) PURCHASE ORDER NUMBER AND ITEM/TAG NUMBER MUST BE NOTED ON ALL DATA BIDDER'S SIGNATURE:
SUBMITTED.
(B) IDENTICAL ITEMS MAY BE REPRESENTED ON A COMMON DRAWING PROVIDED ITEM/TAG
IDENTIFICATION OF THOSE ITEMS ARE CLEARLY SHOWN.
(C) WHEN DRAWINGS ARE RETURNED "APPROVED" OR "APPROVED EXCEPT AS NOTED,"
THE VENDOR MAY START FABRICATION. WHEN DRAWINGS ARE RETURNED "DISAPPROVED,"
THE VENDOR SHOULD NOT START FABRICATION. THE VENDOR MUST RESUBMIT
COMPANY:_______________________________________
CORRECTED DRAWINGS FOR APPROVAL WITHIN TWO (2) WEEKS. BIDDER'S REF. NO.:__________________________________
(D) THE NOTES ON THE ATTACHMENT TO THIS SHEET ARE A PART OF NONMATERIAL
REQUIREMENTS AND CONSEQUENTLY OF THE PURCHASE ORDER.
DATE:_____________________________________________
(E) NORMALLY ONLY THREE HARD COPIES AND ONE SOFT COPY ARE REQUIRED.
Saudi Aramco 7900 (08/06) Page 3 of 3
NOTES
GENERAL: 1. The applicable nonmaterial requirement form reference number 601.1 (etc.) must be shown on each
documents.
2. All drawings and manuals (etc.) must be written in the English language. Unless stated otherwise in the
material description or specification of this Quotation Request/Purchase Order, it is preferred that all
dimensions and weights must be in the "Le System Internationale D'Unites" (S.I.) metric systems of units.
The pound, foot, and second system may be used as an alternative for equipment designed to a nonmetric
specification.
3. The drawings and literature (etc.) should not be bound in books or hard covers since they will be incorporated
in Plant Record Books.
601 PRELIMINARY DRAWINGS AND DATA FOR REVIEW AND APPROVAL BY BUYER
In the event that a purchase order is awarded, Buyer's approval of these drawings is required prior to fabrication
of the units covered by such order.
All drawings, documents, manuals, lists or other literature must be clearly marked with Buyer's Purchase Order
Number and item number, and manufacturer's serial numbers pertaining to the material or equipment being
furnished.
PRIORITY CODES
1. Required as soon as possible after receipt of purchase order.
2. Required as soon as possible after receipt of buyer's comments on preliminary drawings and specifications
(etc.) catalog information, detailed drawings of sub-vendors and parts data.
3. Required as soon as possible after receipt of all non-material requirements covered by item 602 and
after final inspection and testing.