Question no 1

Draw a fishbone diagram with 7M Analysis on any issue of your choice


FISHBONE DIAGRAM
Method

Machine Material

Instructions Screws were


were unclear worn Problem: 15% of
product fails
Tools are worn Instructions were Screws were the inspection for screw
Tools are not the not followed wrong size alignment
right size
Machines OEE Insert text here Selection of material
is very low was wrong

Required room Measuring tool


temperature for Employee is
was faulty
machine demotivated
The correct gauge
Exposed to Employee has
Poor was not used to
humidity not been trained
Supervision measure the parts

Scarce Employee’s The gauge was


resources fatigue not zeroed
tbefore
Mother Nature
Management measuring theMeasurement
part

Man