You are on page 1of 1

THE PLANS BELOW SHOW THE SITE OF AN AIRPORT NOW AND

HOW IT WILL LOOK AFTER REDEVELOPMENT NEXT YEAR


The plans show Southwest Airport now and show the redevelopment of an airport
that will take place next year. In general, the airport will have drastic changes such
as new gates, cafes, ATMs, car rental services and some new facilities that will
also be provided for both departure and arrival passengers.

First, the current structure of Southwest airport is now divided into three zones:
departures, arrivals and north. There is security, passport control, coffee shop and
check-in counter in the left part of the airport. The right part includes passport
control and customs. The eight gates are connected to a walkway on the north side
of the airport.

Furthermore, with the plan, ten more gates will be built in the northeast and
northwest, and all the gates will be connected to the aerial tram rather than the
footpath. The cafe will be moved to the lower left, and the check-in counter will be
replaced by a luggage room and moved to a final safe place. A new cafe and an
ATM will be built on the east side of the airport on the right side. Some space on
the right side of the airport will be expanded and used for car rental. There will be
two departure gates and two pick-up gates in the airport. Security, passport control
and customs will remain unchanged.

You might also like