Final project
Project Management
Presented by
Mohammad Mansour
Supervised by
Dr. Kassis
1|Page
July 26, 2021
Table of Contents
1. EXECUTIVE SUMMARY
A) INTRODUCTION
B) SCOPE
C) VISION AND MISSION
D) OBJECTIVES
2. DELIVERABLES
3. ORGANIZATION CHART
4. ROLES & RESPONSIBILITIES
5. RESOURCE TABLE (STAKEHOLDER’S)
6. SCHEDULE
7. BUDGET
8. RISK ASSESSMENT
9. WORK BREAKDOWN STRUCTURE
2|Page
Executive Summary
This report looks into four areas in project planning. The areas are project Charter, resource
scheduling, and project Schedule & Budget, and risk assessment. These four areas of an ATM
Software project for Maddox Bank will be discussed as planned by Sin Links Inc.
After going through each above-mentioned area, it is compared with the theoretical
frameworks of project management. By comparing, it was found out that although some of
the areas in the above-mentioned project were quite similar there were some areas that were
not. There were few differences in all four areas when they are in practice. The details can be
found in this document.
1-Introduction
The project selected is an ATM Software project taken by Sin Links Inc. to build the software
for Maddox Bank’s ATM service. Maddox Bank is a newly started bank which hopes to
expand their business nationwide. Sin Links Inc., a software solutions specialist firm, has
proposed them with a plan of action for carrying out the project. The following are the scope,
mission and vision, objectives and deliverables of the project.
a-Scope
Scope of the project is to build a fault proof software for managing the ATMs of MADDOX
bank and a user-friendly software for the ATMs which will be used by the customers of the
bank and to provide adequate training for the staff of the MADDOX Bank.
The vision of the Sin Links Inc. is to be the best software solutions provider in the nation.
The mission for the project is to provide the MADDOX Bank with a worsen fault proof
software that fulfills all the requirements expected by the Bank and to give proper training to
the staff.
3|Page
c-Objectives
d-Deliverables
4|Page
Organizational Chart:
MADDOX
Bank
(Contractor)
Top Management
Project Manager
Requirements &
Design
Implementation &
Maintenances
Validation &
Support
Training, Installation
and Documentation
5|Page
Roles & Responsibilities:
1. MADDOX Bank
2. Sin Links Inc. Top Management
3. Project Manager of Sin Links Inc.
4. Requirement & Design Team
5. Implementation & Maintenance Team
6. Validation & Support Team
7. Training, Installation & Documentation Team
Task 1 2 3 4 5 6 7
Initiation x x x
Allocating Resources x
Setting up Project Environment x
Create WBS x
Project Monitoring Plan x
Managing the Project x
Schedule Updating x x
Software Management x
Develop System Requirements x
Designing x
Verification & Validation x
Testing x x x
Documentation x
Training x
Implementing x x x
6|Page
Communication Management :
Cc= ((N) x (N-1)) /2
= ((14)x(14-1)) /2
=91 communications
Project Budgets
Software = $2,000,000
External fees (Risk) =$500,000
Total Project = $2,500,000
Total Project Budget includes all internal costs, fees and permits
7|Page
Risk Categorization:
8|Page
WORK BREAKDOWN Structure
The process of software development is divided into stages are as listed and illustrated
below:
Requirement analysis
Feasibility study
Design
Coding
Testing
Install/deploy
Maintenance
THANK YOU!
9|Page