APRIL
21 22 23 24 25 26 27
ITEM NO. DESCRIPTION
MON TUE WED THU FRI SAT SUN
WORK FORCE
1 FOREMAN 1 1 1 1 1
2 LEADMAN
3 TIME KEEPER
4 LABOR 5 5 5 5 5
5 ELECTRICIAN 0 0 0 0 0
6 CARPENTER 1 1 1 1 1
7 STEELMAN 1 1 1 1 1
TOTAL 8 8 8 8 8 0
APRIL
28 29 30
ITEM NO. DESCRIPTION
MON TUE WED
WORK FORCE
1 FOREMAN 1 1 1
2 LEADMAN
3 TIME KEEPER
5 LABOR 5 6 4
ELECTRICIAN 0 0
6 CARPENTER 1 1 3
7 STEELMAN 1 1 1
TOTAL 7 9 9
MAY
1 2 3 4
ITEM NO. DESCRIPTION
MON TUE WED THU FRI SAT SUN
WORK FORCE
1 FOREMAN 1 1 1
2 LEADMAN
3 TIME KEEPER
5 LABOR 4 4 4
ELECTRICIAN 0 0 0
6 CARPENTER 3 3 3
7 STEELMAN 1 1 1
TOTAL 9 9 9 0
MAY
JUNE
1
ITEM NO. DESCRIPTION
MON TUE WED THU FRI SAT SUN
WORK FORCE
1 FOREMAN
PLUMBER
2 LEADMAN
3 TIME KEEPER
5 LABOR 0
ELECTRICIAN
6 CARPENTER
7 STEELMAN
TOTAL 0
JUNE
2 3 4 5 6 7 8
ITEM NO. DESCRIPTION
MON TUE WED THU FRI SAT SUN
WORK FORCE
1 FOREMAN 1 1 1 1 1 1
PLUMBER 1 1 1 1 1 1
2 LEADMAN
3 TIME KEEPER
5 LABOR 4 4 4 11 15 4
ELECTRICIAN 1 1 1 1 1 1
6 CARPENTER 3 3 3 4 4 3
7 STEELMAN 1 1 1 1 1 1
TOTAL 11 11 11 19 23 11
JUNE
9 10 11 12 13 14 15
ITEM NO. DESCRIPTION
MON TUE WED THU FRI SAT SUN
WORK FORCE
1 FOREMAN 1 1 1 1 1 1
PLUMBER 1 1 1 1 1 1
2 LEADMAN
3 TIME KEEPER
5 LABOR 4 4 4 4 11 4 0
ELECTRICIAN 1 1 1 1 1 1
6 CARPENTER 3 3 3 3 3 3
7 STEELMAN 1 1 1 1 1 1
TOTAL 11 11 11 11 18 11 0
JUNE
JULY
1 FOREMAN 1 1 1 1 1
PLUMBER 1 1 1 1 1
2 LEADMAN
3 TIME KEEPER
5 LABOR 3 4 4 4 4
ELECTRICIAN 1 1 1 1 1
6 CARPENTER 2 2 3 3 3
7 STEELMAN 1 1 1 1 1
TOTAL 9 10 0 11 11 11
JULY
AUGUST
1a. SUB-STRUCTURE
Layout, Batterboards & Excavation
1.01.1 1.01.1 Staking & Layout
1.01.2 1.01.2 Excavation, Medium Hard
2500psi RC Wall Footings (SMC)
1.02.1 1.02.1 Base Trimming & Compaction
1.02.2 1.02.2 Gravel Bed Preparation
1.02.3 1.02.3 Rebar Works
1.02.4 1.02.4 Concrete Pouring
1.02.5 1.02.5 Concrete Finishing - Grade Member/ leveling
1.02.6 1.02.6 Backfilling
Wooden Zocalo Forms
1.03.1 1.03.1 Form Fabrication
2000 psi RC Zocalo Wall (SMC)
1.04.1 1.04.1 Rebar Works
1.04.2 1.04.2 Form Installation
1.04.3 1.04.3 Form Removal
1.04.4 1.04.4 Concrete Pouring
1.04.5 1.04.5 Concrete Finishing
Septic Vault,1000x2100x1400mm
1.05.1 1.05.1 Manual Excavation - Hard Medium
1.05.2 1.05.2 Gravel Bed Preparation
1.05.3 1.05.3 Rebar Works
1.05.4 1.05.4 Form Fabrication
1.05.5 1.05.5 Concrete Pouring
1.05.6 1.05.6 Concrete Finishing
1.05.7 1.05.7 CHB Laying
1.05.8 1.05.8 Wall Plastering
1b. SLAB-ON-FILL
2000 psi Slab-on-Fill, 1000mm
1.06.1 1.06.1 Rebar Works
1.06.2 1.06.2 Levelling & Compaction
1.06.3 1.06.3 Gravel Bed Preparation
1.06.4 1.06.4 Concrete Pouring
1.06.5 1.06.5 Concrete Finishing
PVC Pipes & Fittings
1.07.1 1.07.1 Plumbing Rough-In (2" to 4"?)
1.07.2 1.07.2 Plumbing Rough-In (1/2"-3/4"?)
Wires & Conduits
1.08.1 1.08.1 Electrical Rough-In (Conduits & Boxes)
GROUND FLOOR WALL
2.01.1 2.01.1 Preparation and Cleaning of Casting Area/Housekeeping
2.01.2 2.01.2 Form Setting and Distamantling
2.01.3 2.01.3 Rebar Works
2.01.4 2.01.4 Setting of Release Agent
2.01.5 2.01.5 Rebar Works - Channel Connectors
2.01.6 2.01.6 Electrical Rough-In (Conduits)
2.01.7 2.01.7 Plumbing Rough-In (1/2"-4"?)
2.01.8 2.01.8 Setting of Lifting Wire Ropes
2.01.9 2.01.9 Concrete Pouring
2.01.10 2.01.10 Concrete Finishing
2.01.11 2.01.11 Concrete Curing (Lona Covering)
2.01.12 2.01.12 Hauling
2.01.13 2.01.13 Tools and Equipment Cost
SECOND FLOOR SUSPENDED SLAB & BEAMS
2000psi PCP Suspended Slab
2.02.1 2.02.1 Preparation and Cleaning of Casting Area/Housekeeping
2.02.2 2.02.2 Form Setting and Distamantling
2.02.3 2.02.3 Rebar Works
2.02.4 2.02.4 Setting of Release Agent
2.02.5 2.02.5 Rebar Works - Channel Connectors
2.02.6 2.02.6 Electrical Rough-In (Conduits)
2.02.7 2.02.7 Plumbing Rough-In (1/2"-4"?)
2.02.8 2.02.8 Setting of Lifting Wire Ropes
2.02.9 2.02.9 Concrete Pouring - Grade Member
2.02.10 2.02.10 Concrete Finishing - Grade Member
2.02.11 2.02.11 Concrete Curing (Lona Covering)
2.02.12 2.02.12 Hauling
2.02.13 2.02.13 Tools and Equipment Cost
RC-Slab Wall Connection - CORBEL
2.03.1 2.03.1 Installation of Corbel
INSTALLATION WORKS - PC PANELS & SLABS
Structural Welding - PCP Joints (FULL WELD)
2.04.1 2.04.1 PCP Installation & Spot Welding
Drypacking - PCP Joints, 50mm
2.05.1 2.05.1 Drypacking
2.05.2 2.05.2 Skim Coat Application/Plastering
CAST IN PLACE SYSTEM
2000psi Reinforced Concrete Wall
2.06.1 2.06.1 Rebar Works
2.06.2 2.06.2 Form Fabrication
2.06.3 2.06.3 Form Installation
2.06.4 2.06.4 Concrete Pouring
2.06.5 2.06.5 Form Removal
2.06.6 2.06.6 Plumbing Rough-In (2" to 4"?)
2.06.7 2.06.7 Plumbing Rough-In (1/2"-3/4"?)
2.06.8 2.06.8 Electrical Rough-In (Conduits & Boxes)
2.06.9 2.06.9 Concrete Finishing
2.06.10
MASONRY FINISHES
Exterior Panel Doors & Jambs
5.01.1 5.01.1 Door & Jamb Installation
5.01.2 5.01.2 Lockset Installation
Masonry Wall & Concrete Ceiling Finishes
5.02.1 5.02.1 Skim Coat Application/Plastering
5.02.2 5.02.2 Masonry Wall Plastering
5.02.3 5.02.3 SandBlast Finish
5.02.4 5.02.4 Masonry Wall Plastering (mouldings)
5.02.5 5.02.5 Linear Plastering - Mouldings
5.02.6 5.02.6 Concrete Accent Mouldings
5.02.7
0.00
kg(s) 6.05 5.28 12.70% Decreased
cu.m. 555.88 480.00 13.65% Decreased
cu.m. 138.97 175.00 25.92% Increased
cu.m. 299.40 247.06 17.48% Decreased
sq.m. 36.00 35.00 2.78% Decreased
0.00
ln.m. 22.60 22.00 2.64% Decreased
ln.m. 11.30 13.00 15.00% Increased
0.00
ln.m. 22.60 22.00 2.64% Decreased
0.00
sq.m. 1.22 1.10 10.13% Decreased
ln.m. 3.42 2.90 15.20% Decreased
kg(s) 3.29 3.61 9.79% Increased
sq.m. 2.05 2.00 2.53% Decreased
pc(s) 1.64 2.10 27.74% Increased
ln.m. 1.34 1.31 2.53% Decreased
ln.m. 1.63 1.88 15.20% Increased
pc(s) 6.10 6.02 1.25% Decreased
cu.m. 147.50 132.35 10.27% Decreased
sq.m. 8.22 8.00 2.68% Decreased
sq.m. 0.31 0.30 3.85% Decreased
sq.m. 5.17 6.00 16.01% Increased
sq.m. 3.61 3.05 15.56% Decreased
0.00
sq.m. 1.22 1.10 10.13% Decreased
ln.m. 3.42 2.90 15.20% Decreased
kg(s) 3.29 3.61 9.79% Increased
sq.m. 2.05 2.00 2.53% Decreased
pc(s) 1.64 2.10 27.74% Increased
ln.m. 1.34 1.31 2.53% Decreased
ln.m. 1.63 1.88 15.20% Increased
pc(s) 6.10 6.02 1.25% Decreased
cu.m. 147.50 132.35 10.27% Decreased
sq.m. 8.22 8.00 2.68% Decreased
sq.m. 0.31 0.30 3.85% Decreased
sq.m. 5.17 6.00 16.01% Increased
sq.m. 3.61 3.05 15.56% Decreased
0.00
ln.m. 33.34 35.00 4.99% Increased
0.00
0.00
joints 15.43 15.00 2.80% Decreased
0.00
cu.m. 563.59 485.00 13.94% Decreased
sq.m. 28.80 100.00 247.22% Increased
0.00
0.00
kg(s) 10.14 3.11 69.33% Decreased
bd.ft. 5.00 17.35 246.72% Increased
sq.m. 57.61 107.77 87.08% Increased
cu.m. 663.83 90.58 86.35% Decreased
sq.m. 21.04 22.00 4.58% Increased
ln.m. 18.80 18.31 2.61% Decreased
ln.m. 9.40 10.81 15.00% Increased
ln.m. 18.80 18.31 2.61% Decreased
sq.m. 15.00 14.58 2.80% Decreased
0.00
0.00
0.00
kg(s) 10.14 6.79 33.04% Decreased
bd.ft. 5.00 23.09 361.43% Increased
sq.m. 86.41 107.77 24.72% Increased
cu.m. 663.83 347.22 47.69% Decreased
sq.m. 21.04 22.00 4.58% Increased
ln.m. 18.80 18.31 2.61% Decreased
ln.m. 9.40 10.81 15.00% Increased
ln.m. 18.80 18.31 2.61% Decreased
sq.m. 30.00 29.16 2.80% Decreased
0.00
0.00
0.00