You are on page 1of 2

James Chow

ENG 045
Graph 1:

Relationship between the Productivity of


Graduate Student and Time on Task
120

100
Productivity (%)

80

60

40

20

0
0 100 200 300 400 500
Time on Task (min)

I simply used the data from the data file to create this scatter plot graph. I added a title, x and y
axis plots, and modified the x-axis scale to 0 to 500.

Graph 2:

Relationship between the Productivity of


Graduate Student and Time on Task
120

100
Productivity (%)

80

60

40

20

0
0 1 2 3 4 5 6 7 8 9
Time on Task (hours)

I used the data from the previous graph and modified the x-axis to feature hours instead of
minutes.
Graph 3:

Relationship between Productivity of Graduate


Student and the Time on Task for 3 hours
16.3
y = 0.0008x2 + 0.157x + 15.703
16.2
R² = 1
Productivity (%)

16.1
16
Productivity of Graduate
15.9 Student
15.8 Poly. (Productivity of
Graduate Student)
15.7
15.6
0 0.5 1 1.5 2 2.5 3
Time on Task (hours)

I decreased the x-axis from 8 to 3 hours, added a trendline, and an R^2 value to the graph.

Graph 4:

Relationship between the Productivity of a


Graduate Student and Time
16.3
16.2
16.1
Productivity (%)

16
15.9
15.8
15.7
15.6
15.5
15.4

Time (hours)

I used the 2nd polynomial equation to calculate the productivity values and changed the graph
into a line plot.

You might also like