You are on page 1of 15

E=377818.

417
E=377677.241
N E I G H B O R N=2836861.451
N=2837003.117

N
20000
EXISTING B.WALL

270
300
+15.00 500

475
500

500
8720 1490

CPCTY =16246 GLN


SEPTIC TANK
GAS CYLINDER NET

Int.lck.lvl 7

D1

61500 LITR
500X615X250
W.C.

SH.
90

340
D2
D2
497

W.C.

SH.
90

D2

615
D2
D1
PUMP ROOM

1
handrail W.C. SH.

W.C.

SH.
90

D2

D2
250

290

18
17
16
15
14
13

12 11 10 9 8 7 6 5 4 3 2 1
W.C. SH.
AS BUILT

19 20 21 22 23 24
W.C.

SH.
90

D2
D2
KITCHEN KITCHEN
W.C. SH. ROOM

UNDER GROUND WATER TANK


W.C.

SH.
90
LAUNDRY ROOM

12 11 10 9 8 7 6 5 4 3 2 1
D2
D2

13 14 15 16 17 18 19 20 21 22 23 24
W.C. SH. 2510

W.C.

SH.
90
1800

D2
D2
900
LOADING AND UN LOADING BAY WASH 13

STEEL LADER
150
WASH

+150.00

D1

D1

D1

D1
D1

D1
500 3300 5380

170
MATERIAL STORAGE SHED

D1
L- - - - -O- - - - -B- - - - -B- - - - -Y

Fin.Flr.Lvl. HALL

1460
D1
D1

D1

D1
PROPOSED

2990
3 2 1

CAPACITY :- 80000-GAL
STORE
CLOSED SHED

D
EXISTING

2290
ROOM ROOM
ENT
ROOM ROOM
429 571
STORE
3730 1000 STORING MATERIALS 590 521

DEPTH
4METER
OPEN-1

W/C

W/C

W/C

W/C
3 2 1
12

D1
PACKING SYSTEM PACKING SYSTEM

260
(STORAGE AREA) (STORAGE AREA) 439
4615

+30 +30
Fin.Flr.Lvl. Fin.Flr.Lvl. STORE

S/AC
D1
3940

3900

3900

3900
2510 350 BATH

3610
OFFICE
ROOM OFFICE

D1
13 12 11 10 09 08 07 06 05 04 03 02 01
8 EXISTING WASH

11 PROPOSED SHED 220

100
S/AC
CARGO
LIFT ROOM
PRAYER ROOM

D1

D1
L- - - - -O- - - - -B- - - - -B- - - - -Y
TRUCK PARKING AREA

WATER TANK

WATER TANK

WATER COOLER

800
800
S/AC

1400
1740 ROOM ROOM

D1

D1
170

1990

D1

580

110
12

10
11

9
8
7
6
5
4
3
2
1
STEEL LADER
3 2 1

350
22
23
19

24

290

290
14

16

18

20
21
13

15

17
500 3300 5380

3051
EXISTING B.WALL

EXISTING B.WALL
195
+15.00 +15.00 1240 310

D
D

Int.lck.lvl Int.lck.lvl

1250
10000

10000
700

A
DEMOLITION
A

1400
1420

CLOSED SHED
AS BUILT

2400
160

O
O

27000 LITR
CPCTY=7132
300X300X300

SEPTIC TANK
500
W.C. W.C. W.C.

300
1
2 WORKSHOP STORE
3

R
800
R

ENTRANCE locker room


WASH
wall height 210cm
OFFICE OFFICE

9650 1820 2425


MD

650
D1

7210
D1
15 16 17 18 19
D2
STORE

420 EXISTING 14
13

RECEPTION HALL
1
2
190 1415 450
RECEPTION
D2 12 11 10 9 8 7 6 5 4 3 500

6210
BATH

PROPOSED
WASH D2

D3

OFFICE

CLOSE SHED
OPEN-1

BATH D2
L----------O----------B----------B----------Y

WASH

3
D1
2760

2760

2760
D1
D1

2255 STORAGE SHED 2 4 CLOSE SHED STORING MATERIALS


OFFICE

2 EXISTING
EXISTING 13 STORAGE SHED1
4685

OFFICE
D1

EXISTING
OFFICE
D1

3
2

420
1

1240 310
80
160

800
80

80
540
CPCTY= 9906 GLN

ELE.ROOM
SEPTIC TANK
37500 LITR
500X300X250

500

1080

2425
400

300
10 STORAGE SHED STORAGE SHED STORAGE SHED OFFICE OFFICE 2340
300 9
560

PUMP RM.
140

PUMP1 310
220

220
390

510

MD MD

5 AS BUILT

1360
12 830
400

D1

ROAD ROAD
D1
500

500
UNDER GROUND WATER TANK
GENERATOR CAPACITY 60000 GAL
150 TRANSFORMER ELECTRICAL ROOM
60 14
EXISTING 1800
570

DIESEL TANK

370
320

320
EXISTING
150

1840 830 15780


EXISTING B.WALL
1550 E=377747.583
20000 N=2836790.863
E=377606.408 N E I G H B O R
N=2836932.530

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113 N

99
D as
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED. o
a
d

at
lo
na
lG

4
10
R
PROPOSED SHED &PROPOSED OPEN SHED (STORING MATERIAL) N

2. DO NOT SCALE FROM THE DRAWING. x


RAK Fi03 EMPTY AREA

er
PROJECT TITLE : (AS BUILT) STORAGE SHED,LABOUR ACCO.PUMP ROOM,OFFICE BLOCK No. :

1 y b
11 tor Rub
94
97,98,102&1
3. ALL DIMENSIONS ARE TO BE VERIFIED.

R
BLOCK,KITCHEN BLK,GUARD ROOM

A
o

Fa tes
a

ira
d

c
E

Em
U
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND

8 ix
d

d r
al

ea Sta
11 y M
a

DRAWING TITLE : SITE LAYOUT PLAN JOB No. : 2629 te


o
er
s

0 g
Gulf Concre01
R

Ab Al
ev

11 kagin
du Ma
niv
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY

R
lla sa
U

c
M fri

Pa
95,96,100&1

aje
89
INTERLOCK AREA
Happy

d
A
Umbrella
oc
ks F
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. Bl 7
d

l
a

na
109
Pr

ai ,11
o
BUTROS ELYAS JANNOURA
im

5 io
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : 90
R
e

-- ub 16

12 at
Bu

8
A

2- rn
10
D 1
ild

12 Inte
er

MOBILE NO: 050 589 2006


89
s

R
In
-9

AK 93
te

MOBILE NO: 050 589 2006

n
r.

ia
0
T

ab
St
es

AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE

7
d

ig

10
ee

Ar
MECHANICAL
n

5
a

11
l
o
R

GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH


A
91

CONSULTANT.
6
ENGINEER :
10 PCC AREA
4
B

11
91

D on
om tr
C
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. op act 11
3 Al Rafadian
5

ELECTRICAL an ing
ly
10

121
Po

G
d

7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENG.RAGHESH SHEET No. : A101 ul
AK

r
0 nk
a

ly ta
f
o
AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.

12 Ta
S
R

ENGINEER : Awwad Trad.


R
*E-MAIL zein.design@gmail.com

Po
CONSULTANT'S KNOWLEDGE. 11
2
m
a
s RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR

Ai dus ,13
pe

In
FOUNTATION
Ju
F.F. / F.A. Pi

rc tr
Em

on y
ed

s
SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS ira FLAT NO:1403-1404-1405

1
tic

fle LL
m

8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY

28
9
te
Ah

as

x C.
11

s
Pl
ENGINEER : Fil
ic *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
T

st 4

5
ig
ra
d
11

THE CONTRACTOR. la &13


a

n
4

LL
f P 33
R

STRUCTURAL C
ul 7,1
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023 G 6,
12
12
ELEVATION -3

N
Z X
+15 +15 +15
+15 Int.Lck.Lvl.
Int.Lck.Lvl. Int.Lck.Lvl. Int.Lck.Lvl.
1490

W1 W1 W1 W1 W1 W1 W1

D1
D1 D1
handrail
RS

290
3580

handrail
1800

900
RAMP FOR LOADING UN LOADING BAY LOADING AND UN LOADING BAY
+150.00
Fin.Flr.Lvl.
W1 W1

1500
3300 5380

+15
Int.Lck.Lvl.
ELEVATION -4

600
W1
W1

PACKING SYSTEM PACKING SYSTEM


(STORAGE AREA) -
(STORAGE AREA)
+30 F1 C1 -
+15 +30

ELEVATION -2
Fin.Flr.Lvl. W1 C1
Fin.Flr.Lvl. F1
Int.Lck.Lvl. W1

3900

3900
D1 D1

3610
Y Y

CARGO
LIFT CARGO LIFT
W1 W1

W1 W1

3300 5380

MD D1 MD
W1 W1 W1 W1 W1 W1 W1

+15 +15 +15


Int.Lck.Lvl. Int.Lck.Lvl. Int.Lck.Lvl.

Z X

GROUND FLOOR PLAN


SCALE :1:125
ELEVATION -1
AREA: 3435.68 SQMT
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113 INTERIOR FINISHING
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
FLOOR WALL
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. : F1 EPOXY COATED ON CEMENT MORTAR W1 EMULSION PAINT
3. ALL DIMENSIONS ARE TO BE VERIFIED.
F2 CERAMIC ( 60x60 ) W2 CERAMIC TILES
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
DRAWING TITLE : GROUND FLOOR PLAN JOB No. : 2629 F3 CERAMIC ( 40x40 ) NON SLIP W3 CERAMIC GRANITE
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY F4 EPOXY PAINT ON POLYMERS W4 GRAPHIC PAINT ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. F5 GRADE W5 SINGLE PANEL ALU. SHEET BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- F6 CERAMIC MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL F7 DECKING SLAB WITH EPOXY
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER : SKERTING CEILING
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 S1 MARBLE AS PER SPECIFICATION C1 SANDWICH PANEL AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. S2 CERAMIC TILES C2 ALUMINUM TILES ( 60 x 60) RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
F.F. / F.A. NTS S3 TERAZO (30cm) C3 GYPSUM TILES ( 60 x 60 ) FLAT NO:1403-1404-1405
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENGINEER : ENG. RAGHESH SCALE : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
S4 GRANITE C4 GYPSUM BOARD
THE CONTRACTOR.
STRUCTURAL C5 FALSE CEILING
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023 C6 DECKING SLAB
ELEVATION -3

N
Z X

W1 W1 W1 W1

handrail

handrail
RAMP FOR LOADING UN LOADING BAY LOADING AND UN LOADING BAY

W1

3300
ELEVATION -4

W1

HAND RAIL

PACKING SYSTEM PACKING SYSTEM


(STORAGE AREA) -
(STORAGE AREA)
+360 F7 C1
+30

ELEVATION -2
Fin.Flr.Lvl. W1
Fin.Flr.Lvl.
3900

3900
W1

Y Y

CARGO
LIFT CARGO LIFT
W1

W1

3300

W1 W1 W1 W1

Z X

MEZZANINE FLOOR PLAN


SCALE :1:125
ELEVATION -1
AREA: 1308.00 SQMT
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113 INTERIOR FINISHING
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
FLOOR WALL
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. : F1 EPOXY COATED ON CEMENT MORTAR W1 EMULSION PAINT
3. ALL DIMENSIONS ARE TO BE VERIFIED.
F2 CERAMIC ( 60x60 ) W2 CERAMIC TILES
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
DRAWING TITLE : MEZZANINE FLOOR PLAN JOB No. : 2629 F3 CERAMIC ( 40x40 ) NON SLIP W3 CERAMIC GRANITE
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY F4 EPOXY PAINT ON POLYMERS W4 GRAPHIC PAINT ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. F5 GRADE W5 SINGLE PANEL ALU. SHEET BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- F6 CERAMIC MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL F7 DECKING SLAB WITH EPOXY
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER : SKERTING CEILING
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 S1 MARBLE AS PER SPECIFICATION C1 SANDWICH PANEL AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. S2 CERAMIC TILES C2 ALUMINUM TILES ( 60 x 60) RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
F.F. / F.A. NTS S3 TERAZO (30cm) C3 GYPSUM TILES ( 60 x 60 ) FLAT NO:1403-1404-1405
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENGINEER : ENG. RAGHESH SCALE : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
S4 GRANITE C4 GYPSUM BOARD
THE CONTRACTOR.
STRUCTURAL C5 FALSE CEILING
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023 C6 DECKING SLAB
ELEVATION -3

N
Z X

100 100 100 100 100 100 100 100 100 100 100
SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN
SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT
300

300

300

300

300

300

300

300

300

300

300
ELEVATION -4

100 100 100 100 100 100 100 100 100 100 100
SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN
SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT
300

300

300

300

300

300

300

300

300

300

300
+1230

+1230

+1230

+1230

+1230
T.O.R

T.O.R

T.O.R

T.O.R

T.O.R

ELEVATION -2
Y Y
SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN
SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT
300

300

300

300

300

300

300

300

300

300

300
100 100 100 100 100 100 100 100 100 100 100
SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN
SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT

SKYLIGHT
300

300

300

300

300

300

300

300

300

300

300
100 100 100 100 100 100 100 100 100 100 100

Z X

ROOF PLAN
SCALE :1:125
ELEVATION -1
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. :
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ROOF PLAN JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
+1230.0 Fire Rated sandwich + 1230.00
Top Of Ridge
panel TOP OF RIDGE

100
100
+ 1130.00
EAVE LEVEL

500
500
+ 630.00

1215
MEZZ. FL. LVL

350
600
+ 280.00
TOP OF BLOCK WALL

250
+ 30 F.F.L

15
+ 15 INT.LVL

ELEVATION- 4
SCALE :1:125

Fire Rated sandwich


panel
+1230.0
Top Of Ridge + 1230.00
TOP OF RIDGE
10

100
100
1
SLOPE + 1130.00
EAVE LEVEL

500
500
+360 +360 + 630.00

1215
F.F.L F.F.L MEZZ. FL. LVL

350
600
+ 280.00
TOP OF BLOCK WALL

250
Fire Rated sandwich panel
+30.0 +30.0
Floor finishing lvl Floor finishing lvl

15
+ 15 INT.LVL

SECTION-Z-Z
SCALE :1:125

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. :
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ROOF PLAN JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
ELEVATION -3

2470

MATERIAL STORAGE SHED


+30
Fin.Flr.Lvl.

ELEVATION -2
-
ELEVATION -4

2250
F1 C6
Y Y
W1

200 360
330
200

13 12 11 10 09 08 07 06 05 04 03 02 01

+15
Int.Lck.Lvl.
GROUND FLOOR PLAN
X SCALE :1:125
ELEVATION -1 AREA: 574.79 SQMT
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113 INTERIOR FINISHING
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
FLOOR WALL
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. : F1 EPOXY COATED ON CEMENT MORTAR W1 EMULSION PAINT
3. ALL DIMENSIONS ARE TO BE VERIFIED.
F2 CERAMIC ( 60x60 ) W2 CERAMIC TILES
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
DRAWING TITLE : GROUND FLOOR PLAN JOB No. : 2629 F3 CERAMIC ( 40x40 ) NON SLIP W3 CERAMIC GRANITE
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY F4 EPOXY PAINT ON POLYMERS W4 GRAPHIC PAINT ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. F5 GRADE W5 SINGLE PANEL ALU. SHEET BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- F6 CERAMIC MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL F7 DECKING SLAB WITH EPOXY
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER : SKERTING CEILING
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 S1 MARBLE AS PER SPECIFICATION C1 SANDWICH PANEL AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. S2 CERAMIC TILES C2 ALUMINUM TILES ( 60 x 60) RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
F.F. / F.A. NTS S3 TERAZO (30cm) C3 GYPSUM TILES ( 60 x 60 ) FLAT NO:1403-1404-1405
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENGINEER : ENG. RAGHESH SCALE : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
S4 GRANITE C4 GYPSUM BOARD
THE CONTRACTOR.
STRUCTURAL C5 FALSE CEILING
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023 C6 DECKING SLAB
ELEVATION -3

2470

ELEVATION -2
MATERIAL STORAGE SHED
ELEVATION -4

2250
+430
Y Fin.Flr.Lvl. Y
-
F1 C6
W5

200 360
25
24
23
22
21
20
330

19
18
17
16
15
14

32 31 30 29 28 27 26
200

FIRST FLOOR PLAN


X SCALE :1:125
ELEVATION -1 AREA: 574.79 SQMT
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113 INTERIOR FINISHING
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
FLOOR WALL
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. : F1 EPOXY COATED ON CEMENT MORTAR W1 EMULSION PAINT
3. ALL DIMENSIONS ARE TO BE VERIFIED.
F2 CERAMIC ( 60x60 ) W2 CERAMIC TILES
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
DRAWING TITLE : FIRST FLOOR PLAN JOB No. : 2629 F3 CERAMIC ( 40x40 ) NON SLIP W3 CERAMIC GRANITE
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY F4 EPOXY PAINT ON POLYMERS W4 GRAPHIC PAINT ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. F5 GRADE W5 SINGLE PANEL ALU. SHEET BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- F6 CERAMIC MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL F7 DECKING SLAB WITH EPOXY
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER : SKERTING CEILING
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 S1 MARBLE AS PER SPECIFICATION C1 SANDWICH PANEL AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. S2 CERAMIC TILES C2 ALUMINUM TILES ( 60 x 60) RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
F.F. / F.A. NTS S3 TERAZO (30cm) C3 GYPSUM TILES ( 60 x 60 ) FLAT NO:1403-1404-1405
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENGINEER : ENG. RAGHESH SCALE : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
S4 GRANITE C4 GYPSUM BOARD
THE CONTRACTOR.
STRUCTURAL C5 FALSE CEILING
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023 C6 DECKING SLAB
ELEVATION -3

2470

ELEVATION -2
MATERIAL STORAGE SHED
ELEVATION -4

2250

Y +830 Y
Fin.Flr.Lvl.
-
F1 C1
W5
200 360
50
49
48
47
46
45
330

44
43
42
41
40
39

38 37 36 35 34 33 32 31 30 29 28 27 26
200

SECOND FLOOR PLAN


X SCALE :1:125
ELEVATION -1 AREA: 574.79 SQMT
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113 INTERIOR FINISHING
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
FLOOR WALL
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : BLOCK No. :
PROPOSED PACKING SYSTEM STORAGE SHED F1 EPOXY COATED ON CEMENT MORTAR W1 EMULSION PAINT
3. ALL DIMENSIONS ARE TO BE VERIFIED.
F2 CERAMIC ( 60x60 ) W2 CERAMIC TILES
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
DRAWING TITLE : SECOND FLOOR PLAN JOB No. : 2629 F3 CERAMIC ( 40x40 ) NON SLIP W3 CERAMIC GRANITE
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY F4 EPOXY PAINT ON POLYMERS W4 GRAPHIC PAINT ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. F5 GRADE W5 SINGLE PANEL ALU. SHEET BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- F6 CERAMIC MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL F7 DECKING SLAB WITH EPOXY
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER : SKERTING CEILING
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 S1 MARBLE AS PER SPECIFICATION C1 SANDWICH PANEL AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. S2 CERAMIC TILES C2 ALUMINUM TILES ( 60 x 60) RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
F.F. / F.A. NTS S3 TERAZO (30cm) C3 GYPSUM TILES ( 60 x 60 ) FLAT NO:1403-1404-1405
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENGINEER : ENG. RAGHESH SCALE : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
S4 GRANITE C4 GYPSUM BOARD
THE CONTRACTOR.
STRUCTURAL C5 FALSE CEILING
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023 C6 DECKING SLAB
ELEVATION -3

100 100 100

SLOPE DOWN

SLOPE DOWN
SKYLIGHT

SKYLIGHT

SKYLIGHT
300

300

300
+1230

+1230
T.O.R

T.O.R

ELEVATION -2
ELEVATION -4

Y Y

SLOPE DOWN

SLOPE DOWN
SKYLIGHT

SKYLIGHT

SKYLIGHT
300

300

300
100 100 100

ROOF PLAN
SCALE :1:125
X
ELEVATION -1
GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. :
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ROOF PLAN JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A102 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
+1230.0 Fire Rated sandwich + 1230.00
Top Of Ridge
panel TOP OF RIDGE

100
+ 1130.00
EAVE LEVEL

400
300
+ 830.00
F.FL.F.LVL

1215
400
400
+ 430.00
G.FL.F.LVL

150
+ 280.00
TOP OF BLOCK WALL

400
250
+ 30 F.F.L

15
15
+ 15 INT.LVL

ELEVATION-2
SCALE :1:125

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. :
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ELEVATION-2 JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS ENGINEER :
DRAWING TYPE :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
Fire Rated sandwich
panel
+1230.0
Top Of Ridge + 1230.00
TOP OF RIDGE
10

100
1
SLOPE + 1130.00
EAVE LEVEL
SHED
22.50 X 24.70 M

400
300
+830 +830 + 830.00
F.F.L F.F.L F.FL.F.LVL

1215
400
400
+430 +430 + 430.00
F.F.L F.F.L G.FL.F.LVL

150
+ 280.00
TOP OF BLOCK WALL

400
250
Fire Rated sandwich panel
+30.0 +30.0 + 30 F.F.L
Floor finishing lvl Floor finishing lvl

15
15
+ 15 INT.LVL

SECTION-XX
SCALE :1:125

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : PROPOSED PACKING SYSTEM STORAGE SHED BLOCK No. :
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : SECTION X-X JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS ENGINEER :
DRAWING TYPE :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
X
W1 W1 W1 W1 W1

D3 D1 D1
W.C. W.C. W.C.
4

300
D2
D1 WORKSHOP STORE D2
D2 D2 D2
D2 D2
D1
D1
D1 D1
D1
locker room WASH
wall height 210cm D2

9650 1820 2425

MD

PROPOSED
CLOSE SHED
3
2760

2760

2760
STORAGE SHED 2 4 CLOSE SHED
1 STORING MATERIALS
EXISTING
EXISTING
Y MD
Y
ELE.ROOM

D1

2425
A1 A3 A2 D1
D1
D1
300

STORAGE SHED STORAGE SHED STORAGE SHED OFFICE D1


OFFICE
D1
W1 W2
2

X
GROUND FLOOR PLAN

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : BLOCK No. :
STORING MATERIAL (OPEN SHED)
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : GROUND FLOOR PLAN JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A113 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
X

4 +605 LVL

SLOPE DOWN

SLOPE DOWN
SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN
+700 TOP +700 TOP +700 TOP
3
AS BUILT

SLOPE DOWN

SLOPE DOWN
SLOPE DOWN

SLOPE DOWN

SLOPE DOWN

SLOPE DOWN
Y Y

ROOF PLAN

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : BLOCK No. :
STORING MATERIAL (OPEN SHED)
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ROOF PLAN JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENGINEER : ENG.RAGHESH SHEET No. : A114 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
*E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
EXTERNAL FINISHING
1 SANDWICH PANEL

+1215 TOP +1215 TOP

100

100
+1115 FFL +1115 FFL

1215

1215
1100

1100
2

+15 FFL 1 +15 FFL

15

15
ELEVATION-1 ELEVATION-3

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : BLOCK No. :
STORING MATERIAL (OPEN SHED)
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ELEVATIONS JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENG.RAGHESH SHEET No. : A115 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
ENGINEER : *E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023
EXTERNAL FINISHING
1 SANDWICH PANEL

+1215 TOP

100
+1115 FFL

1215
1100
2

330
1 1 +15 FFL

15
ELEVATION-2

+1215 TOP

100
+1115 FFL

1215
1100
2

+15 FFL

15
ELEVATION-4
+1215 TOP
100

+1115 FFL
1215
1100

+15 FFL
15

+700
+700 TOP T.O.P
100

+600 FFL

PROPOSED
CLOSE SHED CLOSE SHED
245

STORING MATERIALS E X I S T I N G
700
585

300

+15 FFL
15

SECTION Y-Y

SECTION Y-Y

GENERAL NOTES: CLIENT : MANCHESTER PAPER BAGS (DOMO PAN) PLOT No. : 106&113
1. ALL DIMENSIONS ARE IN CENTIMETERS (CM) AND LEVELS ARE IN METERS (M) UNLESS OTHERWISE SPECIFIED.
2. DO NOT SCALE FROM THE DRAWING. PROJECT TITLE : BLOCK No. :
STORING MATERIAL (OPEN SHED)
3. ALL DIMENSIONS ARE TO BE VERIFIED.
4. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL, M.E.P. DETAILS AND
SPECIFICATIONS. CONTRACTOR SHALL COORDINATE THESE DRAWINGS AND REPORT IF THERE ARE ANY
DRAWING TITLE : ELEVATIONS&SECTION Y-Y JOB No. : 2629
ARCHITECT
DISCREPANCIES FOR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. BUTROS ELYAS JANNOURA
5. ALL LEVELS IN THE SETTING OUT PLAN ARE TENTATIVELY SHOWN. ACTUAL LEVELS HAVE TO BE DECIDED SITE LOCATION : JAZEERA AL HAMRA REVISION No. : -- MOBILE NO: 050 589 2006
MOBILE NO: 050 589 2006
AT THE PROJECT SITE BY THE CONTRACTOR AND SHALL BE BROUGHT TO THE ATTENTION OF THE MECHANICAL
CONSULTANT. GEN. MANAGER: ENG. BUTROS DRAWING TYPE : ARCH
ENGINEER :
6. SHOP DRAWINGS ARE TO BE SUBMITTED BEFORE EXECUTION OF WORK ON SITE. ELECTRICAL
7. THE CONTRACTOR IS THE ONLY PARTY RESPONSIBLE FOR ANY WORK CARRIED OUT ON SITE WITHOUT THE ARCHITECT : ENG. SALMA ENG.RAGHESH SHEET No. : A116 AL-ZEIN DESIGN ENG.& CONSULTANTS L.L.C.
ENGINEER : *E-MAIL zein.design@gmail.com
CONSULTANT'S KNOWLEDGE. F.F. / F.A.
RAS-AL KHAIMAH -JULPHAR OFFICE TOWER . 14 FLOOR
8. DRAINAGE SYSTEM AND WATER SUPPLY SYSTEM HAVE TO BE EXECUTED AS PER THE SITE CONDITION BY SITE ENGINEER : ENG. ANOOP ENG. RAGHESH SCALE : NTS FLAT NO:1403-1404-1405
ENGINEER : *TEL:07-22 74 74 5 *FAX:07-22 74 74 3 *P.O.BOX:29 749
THE CONTRACTOR.
STRUCTURAL
ENGINEER :
ENG. AYHAM DRAWN BY : JESEEM DATE : 03-01-2023