F-Final: 870310-S-1247064-CST-H03-0002 Quality Control Plan Endorsement For Painting & Coating 04 A. Accepted
F-Final: 870310-S-1247064-CST-H03-0002 Quality Control Plan Endorsement For Painting & Coating 04 A. Accepted
DOCUMENT NUMBER DOCUMENT TITLE REV. CODE ISSUE STATUS DOCUMENT STATUS
870310-S-1247064-CST-H03-0002 Quality Control Plan Endorsement For Painting & Coating 04 F- FINAL A. ACCEPTED
NO COMMENTS ORIGINATOR SUPPLIER RESPONSE REASONS NAME &TITLE SECTION AFFECTED COMMENT STATUS
TABLE OF CONTENTS
1 INTRODUCTION ........................................................................................ 4
7 ATTACHMENTS ...................................................................................... 12
Revision History
Amendment Revision
Amender Name Amendment
Date Number
31/JAN/2019 01 Yodhi Submit for Review
29/APR/2019 02 Yodhi Submit for Review
11/JUL/2019 03 Mangojaktua F-Final
19/SEP/2019 04 Yuniarto F-Final
Related Documents
Document
Document name Description of Content
number
1 INTRODUCTION
1.1 Project Overview
BP Berau Ltd., hereafter known as COMPANY, is the operator of Tangguh LNG, a two train
natural gas (NG) liquefaction facility in Bintuni Bay, Papua, Indonesia. The facility includes
associated onshore infrastructure, two offshore platforms, pipelines and twelve wells. These
facilities are the Trains 1 and 2 development at Tangguh.
COMPANY has initiated the Tangguh Expansion Project to commercialize the incremental
resource into high margin gas markets based on a single LNG (liquefied natural gas) train
expansion (Train 3).
Tangguh Expansion Project will consist of new offshore facilities, including wellhead platforms
and pipelines, and onshore development on the existing Tangguh brownfield site. The new
onshore facilities will include one additional natural gas liquefaction train of a similar design and
capacity to the existing trains, an onshore receiving facility (ORF), new LNG and condensate
loading berth, additional boil off gas (BOG) recovery, condensate storage tank, utilities, flares
and the infrastructure to support logistics and the associated increase in the temporary and
permanent workforce.
The Tangguh Expansion Project comprises of the following new facilities:
• [New] Onshore Receiving Facility (ORF).
• [New] LNG Train 3.
• [New] Condensate Stabilization Train 3.
• [New/Interconnection] Plant Utility Facilities.
• [New] LNG Loading System.
• [New] Condensate Storage and Loading System.
• [Expansion] Integrated Control and Safety System (ICSS).
• [Expansion] Telecommunication System.
• [New] Trestle Jetty Structure.
• [Expansion] Onshore Infrastructure.
• Hazardous and Non-hazardous Waste Management System.
outputs. These outputs then serve as inputs for the next stage
until a known goal or end result is reached.
Any other terms related to quality and not listed above conform to section 3 “Terms and
Definitions” of ISO 9000:2005 “Quality Management System – Fundamentals and vocabulary”.
2 REFERENCE DOCUMENTATION
2.1 CODES and Standards
For the last edition applicable for this documents please refers to the Applicable Codes
SSPC Painting Manual SSPC Painting Manual Volume 1, Good Painting Practice.
3 APPLICABLE REVISION
Unless otherwise specified in the contract documents, the applicable revision or edition of applicable
specifications and standards is the last valid at the time when the contract or agreement are made to
enter into effective date.
4 TECHNICAL REQUIREMENTS
Technical requirements are indicated in applicable drawings, specifications and Standards referenced in
the contract
5 LOCAL REGULATIONS
Inspections and tests required by local regulations are out from the scope of this specification. However,
they shall be strictly adhered to and documented by SUBCONTRACTOR. Copy of such records shall be
submitted to CONTRACTOR.
The order of precedence of the codes and standards quoted in the specifications shall be:
1. International and local statutory regulations.
SUBCONTRACTOR shall negotiate the matter with the Authorities concerned and keep
CONTRACTOR informed of any resulting deviation from design requirements.There shall be no
deviation to Project specification requirements without prior written CONTRACTOR’s approval.
First and second columns contain the split of the ITP ID number as identified in the ITP Title box,
third column contains the progressive number of the inspection phase which includes also the
suffix for the connection with the relevant works phase as to:
Request for inspection (RFI) : The notification of inspection is a formal written request to
be issued by CONTRACTOR in order to allow all parties
involved to participate to the inspection and test as they are
planned in the applicable ITP(s). The Subcontractor QC
shall notify COMPANY through QC of CONTRACTOR to
perform an in process inspection at least 48 hours in
advance of any HOLD point or 24 hours for Witness
7 ATTACHMENTS
PAI 0101 03M Cross Cut/Adhesion Testing (as required by TEP-900-SPE-PP-BP4-1009 TEP-ITR-PAI-103 P H W W /
specification)
PAI 0101 04M Holiday Testing (as required by specification) TEP-900-SPE-PP-BP4-1009 TEP-ITR-PAI-104 P H W S /
PAI 0101 05M Painting/Coating/HSS Repairing Log TEP-ITR-PAI-105 / Log review before work
TEP-900-SPE-PP-BP4-1009 P R R R
acceptance
Holiday Test
PAI 0102 03M TEP-900-SPE-PP-BP4-1009 TEP-ITR-PAI-107 P H W W /
(if required by Project Specification)
TEP-900-SPE-PP-BP4-
Adhesion Test 1009ISO 4624
PAI 0102 04M SSPC-PA2
TEP-ITR-PAI-108 P H W W /
(if required by Project Specification)
TEP-900-SPE-PP-BP4-1009
PAI 0102 05M Final Painting Release Report SSPC-PA2 TEP-ITR-PAI-109 P H R R /
SSPC GUIDE 15
Document ref.:
INSPECTION
ITEM/TAG EXPECTED
No QC CODE ITEM/TAG DESCRIPTION AREA/LOCATION EXECUTION
NUMBER TIME
RESULT
SIGNATURE
SIGNATURE SIGNATURE SIGNATURE
TEP-1247064-H03-0002 Page 17 of 26
870310-S-1247064-CST-H03-0002
Tangguh Expansion Project –LNG EPC
PT. Meindo – Quality Control Plan Endorsement For Painting & Coating
TEP-ITR-PAI-101
DFT CHECK
Alignment sheet /Drawing number: Pipeline number :
Specifications……………
Assembly - Tag Item –Pipe- - KP / Weld number - NUMBER OF COAT RESULT
line/Spool number Subassembly – Element/ Item SPOT READING
description P I (X) F
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
C NC
RFI N°
NOTES: C = conforming; NC = no conforming. P= Primer, I (layer) =Intermediate (1,2,3, etc..) F=Final
TEP-ITR-PAI-102
SUBCONTRACTOR: 1
Final
Test Panel Number Painting System (Details) Result Criteria Remarks
A R
TEP-ITR-PAI-103
2 2 2 2
3 3 3 3
4 4 4 4
5 5 5 5
6 6 6 6
7 7 7 7
8 8 8 8
9 9 9 9
RFI N°
QC SUBCONTRACTOR JO - CSTS CPY TPI/LAB
NAME NAME NAME NAME
QC CODE ITP
BINTUNI BAY,PAPUA - INDONESIA REFERENCE
PAI010105M PAI-0101
PROJECT TITLE: TANGGUH EXPANSION PROJECT REPORT No. Sh. of.
SUBCONTRACTOR: 1
TEP-ITR-PAI-106
SUBCONTRACTOR: 1
Equipment Type Equipment SN Equipm. Calibration Date Inspection Voltage Type of Electrode
Standard Project Procedure Acceptance Criteria Weather Condition during the Test
Painting Application
Painting System DFT Range Type of Structure
Date
HOLIDAY TESTING
NOTES
RFI N°
SUBCONTRACTOR: 1
ADHESION TEST REPORT (PULL OFF TEST)
ENGINEERING DOCUMENT n. SUPPLIER DOCUMENT n. CODE/SPECIFICATION CODE/SPECIFICATION
Acceptance Criteria
Standard Project Procedure Painting System
Breaking Strength (MPa)
SUBCONTRACTOR: 1
Project Specification
Reference Standard
YES NO NA
TEP-ITR-PAI-109