S.O.W:
5 years inspection and certification of Annular BOP
13 5/8”x 5000 psi (5K) HYDRIL GK ( Flange Bottom
10.000 psi ) S/N:151215, consisting of:
1. Disassembly;
2. Inspection of parts;
3. Remanufacture of damaged parts (if necessary);
4. Replacement of all gaskets, including packer;
5. Reassembly;
6. Hydrostatic tests;
7. Painting.
12
SECTION 3
CERTIFICATE OF COMPLIANCE
13
14
SECTION 4
REPAIR
15
SECTION 4.1
16
17
18
19
SECTION 4.2
20
21
SECTION 4.3
22
23
24
SECTION 4.4
25
26
27
28
SECTION 4.5
29
30
31
32
SECTION 5
33
34
35
36
SECTION 6
37
38
39
SECTION 7
40
41
42
43
SECTION 8
OPERATOR’S CERTIFICATES
(WELDING & NDT)
44
45
46
SECTION 9
PICTURES
47
48
49
50