You are on page 1of 50

1

TABLE OF CONTENTS

Section 1: REPAIR FACILITY API & ISO CERTIFICATION


Section 2: SCOPE OF WORK
Section 3: CERTIFICATE OF COMPLIANCE
Section 4: REPAIR
Section 4.1: PRELIMINARY INSPECTION & ACTIONS REPORT
Section 4.2: MATERIAL REPORT (WELDING MATERIAL)
Section 4.3: STRESS RELIEF CERTIFICATION
Section 4.4: DIMENSIONAL INSPECTION & HARDNESS REPORT
Section 4.5: DYE PENETRANT EXAMINATION REPORT
Section 5: HYDROSTATIC TEST REPORT
Section 6: FINAL INSPECTION REPORT
Section 7: NON-METALLIC COMPONENTS CERTIFICATES
Section 8: OPERATOR’S CERTIFICATES (WELDING & NDT)
Section 9: PICTURES

2
SECTION 1

REPAIR FACILITY’S API & ISO CERTIFICATION

3
4
5
6
7
8
9
10
SECTION 2

SCOPE OF WORK

11
S.O.W:
5 years inspection and certification of Annular BOP
13 5/8”x 5000 psi (5K) HYDRIL GK ( Flange Bottom
10.000 psi ) S/N:151215, consisting of:
1. Disassembly;
2. Inspection of parts;
3. Remanufacture of damaged parts (if necessary);
4. Replacement of all gaskets, including packer;
5. Reassembly;
6. Hydrostatic tests;
7. Painting.

12
SECTION 3

CERTIFICATE OF COMPLIANCE

13
14
SECTION 4

REPAIR

15
SECTION 4.1

PRELIMINARY INSPECTION & ACTIONS


REPORT

16
17
18
19
SECTION 4.2

MATERIAL REPORT (WELDING MATERIAL)

20
21
SECTION 4.3

STRESS RELIEF CERTIFICATION

22
23
24
SECTION 4.4

DIMENSIONAL INSPECTION & HARDNESS


REPORT

25
26
27
28
SECTION 4.5

DYE PENETRANT EXAMINATION REPORTS

29
30
31
32
SECTION 5

HYDROSTATIC TEST REPORT

33
34
35
36
SECTION 6

FINAL INSPECTION REPORT

37
38
39
SECTION 7

NON – METALLIC COMPONENTS


CERTIFICATES

40
41
42
43
SECTION 8

OPERATOR’S CERTIFICATES
(WELDING & NDT)

44
45
46
SECTION 9

PICTURES

47
48
49
50

You might also like