PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
1
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
Name
Position
QA/QC Engineer Project Manager Operations Manager
Signature
2
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
Revision
Issue Date Summary of Changes Responsibility References
No.
00
3
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
Contents
1 INTRODUCTION..................................................................................................................
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
The operational techniques and activities that used to fulfill requirements for
quality. These techniques are used to assure that a product or service meets
the requirements. QC is carried out by the operation forces. Their job is to do
the work and meet the product or service goals. Generally, QC refers to the act
of taking measurements, testing, and inspecting a process or product to assure
Quality Control
that it meets specification. It also includes actions by those performing the
work to control the quality of the work. Products may be design drawings or
specifications, manufactured equipment, or constructed items. QC also refers
to the process of witnessing or attesting
to, and documenting such action.
All those planned and systematic actions necessary to provide adequate
confidence to the management that a product or service will satisfy given
Quality Assurance requirements for quality. QA empathizes ''upstream'' actions that directly
improve the chances that QC actions will result in a product or service that
meets requirements. QA includes ensuring the project requirements are
developed to meet the needs of all relevant internal and external agencies,
planning the process needed to assure quality of the project, ensuring that
equipment’s and staffing is capable of performing tasks related to project
quality, ensuring that contractors are capable of meeting and to carry out
quality requirements and documenting the quality efforts with reference to the
applicableinstructions
Written section. for implementing various components of the quality
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
Work Procedures management system. Procedures should identify what is to be done, who
should do it, how, where and when it should be done.
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
PROJECT QUALITY
PLAN (PQP)
CONSTRUCTION OF PROPOSED ENOC Date: 16.04.2023
Project Name: FILLING STATION AT PLOT NO. 04 GREEN
MUBAZZARAH, AL KHADRA, AL AIN Rev 00
I
STOMER TE
ORGANIZATION CHART
I
1. LICENSE………
Document Reference 2. TOTAL NO OF
Number
CURRENT
PROJECTS……
Related Contract 3. ORGANIZATION
Clauses CHART
4. LAST 5 YEAR
PROJECTS……
5. DETAILS
EQUPIMENT
Remarks by 6. APPROVED MS
Contractor 7. CV, TRANING.
8. PRE-
QUALIFICATION
ELETRICAL WORK
Contractor’s Review:
We do certify that the submitted information herewith has been reviewed in details and in accordance with the Contract Documents except as
otherwise stated here above.
Discipline
Engineer
Name
Signature
Date
Client’s /
Engineer’s
Comments
Name
Designation
Signature
Date
MATERIAL INSPECTION REQUEST - MIR
Construction of Proposed ENOC Filling Station Site 1770
Project Name MIR Ref.No
On Plot No. 04 Green Mubazzarah, Al Khadra, Al Ain
Request submission
Client Emirates National Oil Company (ENOC) L.L.C
(Date & Time)
Inspection
Em ployer N/A
(Date & Time)
PMC N/A Rev No
Engineer Altorath International Engineering Consultants L.L.C MIR Submitted By (Name of the organization)
Contractor Al Madar M.G.M Construction L.L.C MIR Submitted To (Name of the organization)
Part A: By the Contractor
Supplier :
Storage Location:
Contractor:
Name: Signature: Date:
Details Given in Delivery Note Correct? (Type, Size, Wt., Qty. etc.) Yes No
Engineer's Decision:
The above materials have been inspected on site and found, at time of ins pection, to be:
A- Approved -Fully satis factory and can be us ed for permanent works at site.
B- Approved - with Comm ents Partialy s atis factory and can be used for perm anent works after taking into
consideration our comm ents mentioned in remarks
C - Revis e and Res ubm it - Correct docum ents / provide additional inform ation reques ted
Comm ents :
Name: Signature: Date:
Date 0
METHOD STATEMENT SUBMITTAL - MSS
1- Purpose:
2- Scope:
3- Legislation and code of practice:
4- References:
5- Definitions:
6- Resources:
6.1 Materials and their approval
6.2 Subcontractor approval
6.3 Shop drawings approval
6.4 Equipment
6.5 Human Resource
7- Safety Precautions/ Risk Assessment:
8- Detailed Construction Sequence (Methodology)
9- Related Forms:
10- Attachments:
52
Contractor’s Review:
Description QA/QC HSE
Name
Designation
Signature
Date
Client’s / Engineer’s
Comments
Name
Designation
Signature
Date
53
NON CONFORMANCE REPORT (NCR)
Construction of Proposed ENOC Filling Station
Project Name: Site 1770 On Plot No. 04 Green Mubazzarah, Al NCR Serial Number:
Khadra - Al Ain
Client : Emirates National Oil Company (ENOC) L.L.C Date of Issue:
Engineer : Altorath International Engineering Consultants L.L.C NCR Issued To: (Name of the organization)
Major Minor
Is s ue d by:
Name: Designation Organization:
Signature Date:
Re c e iv e d by Contrac to r:
Name: Designation
Signature: Date
2-A) Propos ed corrective / preventive action has been checked and approved as per
2-B) Corrective / Preventive action performed by contractor has been checked and found to be satis factory
Re c e iv e d by Contrac to r:
Name Signature: Date
54
REQUEST FOR INFORMATION - RFI
1. ..…………………..
2. ……………………
3. ……………………
Details of 4. ……………………
Clarification
Related Contract
Clauses
Related Major
Construction Activities
Affected by Required
Information
Remarks by
Contractor
For Contractor:
55
Initiated By Authorized By
Name
Designation
Signature
Date
Client’s /
Engineer’s
Response
Note(1): Information provided in Client/Engineer’s response neither authorizes changes to Contract Documents nor relieves the Contractor from his contractual
obligation to ensure conformance to all Contract Documents.
56
SHOP DRAWING SUBMITTAL - SDS
No. of Med
SN Drawing Reference No. Rev. Drawing Title Related Contract Drawing Reference (Hard
Copies Co
57
Contractor’s Review:
We do certify that the shop drawings submitted herewith has been reviewed in details and in accordance with the Contract Documents except as otherwise stated here above.
Name
Signature
Date
Client’s / Engineer’s
Comments
Note(2): Client’s/ Engineer’s approval is for conformance with information given and design concept expressed in Contract Documents. Approval does not authorize changes to Contract Documents. Client’s/ Engineer’s ap
does not relieve the Contractor from his contractual obligation to ensure conformance to all Contract Documents. Any deviations, to the Contract Documents found subsequent to Client’s/ Engineer’s approval are to be cor
by the Contractor at no extra Cost/Time.
58
SITE OBSERVATION REPORT - SOR
Project Name: Construction of Proposed ENOC Filling Station Site 1770 On Plot No. 04 Green Mubazzarah, Al Khadra - Al Ain
Contractor: Al Madar M.G.M Construction L.L.C SOR Issued To: (Name of Organization)
Discipline Civil Arch. Electrical
Mechanical Others …………………………………………………
Section 1 - Description of Site Observation (To be filled by Engineer):
(B) Describe the Corrective Actions taken to close SOR (To be filled by Contractor):
Section 3 - Engineer's Review for implemented Corrective Action (To be filled by Engineer):
Implemented corrective actions were found to be satisfactory & this SOR is now considered closed
Implemented corrective actions were found to be not satisfactory.Please find our comments below
This SOR is still opened.
Comments:
59
SUB-CONTRACTOR PREQUALIFICATION SUBMITTAL - SCPS
Mobile Number
Is Sub-Contractor
Certified for any
Quality Standard? (If
yes, Specify?)
Is Sub-Contractor
Certified for any HSE
Standard? (If yes,
Specify?)
Other Remarks
60
Contractor’s Review:
We do certify that the submitted information herewith has been reviewed in details and in accordance with the Contract Documents except as
otherwise stated here above.
Discipline Project
QA/QC Section HSE Section MEP Section
Engineer Manager
Name
Signature
Date
Client’s /
Engineer’s
Comments
Note (1): Client’s/ Engineer’s approval is for conformance with information given and design concept expressed in Contract Documents. Approval does not authorize
changes to Contract Documents. Client’s/ Engineer’s approval does not relieve the Contractor from his contractual obligation to ensure conformance to all Contract
Documents. Any deviations, to the Contract Documents found subsequent to Client’s/ Engineer’s approval are to be corrected by the Contractor at no extra
Cost/Time to the Client.
61
WORK INSPECTION REQUEST - WIR
Construction of Proposed ENOC Filling Station Site 1770
Project Name WIR Ref.No:
On Plot No. 04 Green Mubazzarah, Al Khadra - Al Ain
Request Submission
Client Emirates National Oil Company (ENOC) L.L.C
(Date & Time)
Inspection
Employer N/A
(Date & Time )
PMC N/A Rev No:
Engineer Altorath International Engineering Consultants L.L.C WIR Submitted By: (Name of the organization)
Contractor Al Madar M.G.M Construction L.L.C WIR Submitted To: (Name of the organization)
Part A: By the Contractor:
Description of Works to be inspected and / or tested: Discipline:
Civil
Architectural
Mechanical
` Electrical
B.O.Q Ref: Other (state)
Works Location: BOQ NO:
Floor Level:
Works Quantity: Previous WIR Ref.No: If it is reinspection (If any)
Interface (Others……….)
Interface(Others………...)
62
Part B: By the Engineer:
Received by Engineer on: Date: Time: Signed by:
Civil/MEP Inspector's Comments:
Surveyor's Comments :
D - Rejected
Quantity Surveyor 's comments (if any): Signature: Date:
63
INSPECTION AND TEST PLAN (ITP)
Stage of Construction Area Tested Testing Method Acceptance Criteria Testing Frequency Remarks
Level check
Level check
Interlocking Tiles Interlocking Compression Test Minimum Every _______ along the
Tiles Compression length
strength ______
Level check
Signages Pole
measurement