You are on page 1of 36

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
4 03/06/02 30282 REVISED TO INCLUDE F IBER OPTIC DTM DJF RDH
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, DEC 04 REVISED S. ARAMCO STD. TO THOSE APPLICABLE IN SEP. 04 DRS DRS
5 KML

AGENCY
BY:

PROJECT
C.C. LIANG

A.V. ELVING
R.B. NORTH
ENGINEER
BY DRAWING COMPLETION CERTIFICATE

ENGINEER

D.R. SANDERS
DISCIPLINE

CERTIFIED

July 5, 1998

OPERATIONS
CONSTRUCTION
July 2, 1998
july 2, 1998

July 4, 1998
(DCC) NO. _____________________ DATE:
Saudi Aramco 2616-ENG (03/99)

ARABIAN GULF
PROCEDURE FOR

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc


INSTALLATION OF SUBMARINE CABLES

SAUDI ARABIA
DOC
*
JOB #: *
DWG.TYPE PLANT NO.

A
INDEX
SAUDI ARABIAN OIL COMPANY

OPTIC CABLES
PROCEDURE FOR

POWER AND FIBER

DRAWING NO.

DE-930525
PLATFORMS AND PIPELINES

1
of
36
SHT.NO.
CONSTRUCTION OF OFFSHORE

INSTALLATION OF SUBMARINE

5
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

TABLE OF CONTENTS

1.0 SCOPE 3

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS AND REFERENCES 3


DESCRIPTION

3.0 GENERAL REQUIREMENTS 5

4.0 MATERIAL HANDLING AND INSPECTION 7

5.0 WELDING 8

6.0 PROTECTIVE COATINGS 8

7.0 SURVEY REQUIREMENTS 9


JO/EWO

8.0 SUBMARINE CABLE INSTALLATION 15

9.0 DIVING OPERATIONS 27


DATE

10.0 CLEAN-UP 27
NO.
REV

DISCIPLINE
ENGINEER APPENDIX A. DAILY INSTALLATION REPORT (SAMPLE) 28

DATE: APPENDIX B. REMOTE OPERATED VEHICLE PROCEDURE REQUIREMENTS 29


PROJECT
ENGINEER
APPENDIX C. CONSTRUCTION/INSTALLATION SPREAD PRE-MOBILIZA TION 32
SURVEY REQUIREMENTS
DATE:
CERTIFIED
APPENDIX D. SURVEY PERSONNEL REQUIREMENTS 35
DATE:
CONSTRUCTION
(*) Required from CONTRACTOR prior to start of fabrication or installation as applicable
AGENCY (when referenced herein).

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
2 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 SCOPE
ENGG CERT

This Procedure defines the minimum requirements for installation of submarine cables,
5 and fabrication and installation of associated appurtenances as described herein, in
the Scope of Work, and as shown on the Contract

2.0 APPLICABLE CODES, STANDARDS, SPECIFICATIONS AND


REFERENCES

2.1 The latest revision of the following Construction Procedures shall apply:
DESCRIPTION

DE-119885 Quality Assurance and Quality Control

DE-119887 Structural Materials

DE-119889 Painting of Offshore Platforms

DE-119891 Electrical Installation


JO/EWO

DE-119892 Material Procurement, Receiving, Handling, and Storage

DE-119895 Offshore Reporting and Scheduling System


DATE

DE-119896 Welding
NO.
REV

DISCIPLINE DE-119957 Diving Safety Requirements


ENGINEER

DATE:
DE-119959 Vessel Conformance Requirements
PROJECT
ENGINEER
2.2 The latest issue of the following SAUDI ARAMCO Engineering Standards (SAES)
and Material System Specifications (SAMSS), and all other references shall
DATE:
CERTIFIED apply:

DATE: SAUDI ARAMCO Engineering Standards (SAES)


CONSTRUCTION
AGENCY
SAES-H-100 Painting Requirements for Industrial Facilities
DATE:
OPERATIONS SAES-H-101 ARAMCO Painting and Coating System

DATE:
SAES-P-104 Wiring Methods and Materials
CONTROL NUMBER
VERIFICATION

SAES-P-111 Grounding
EDSD

SAES-Q-001 Criteria for Design and Construction of Concrete Structures


DATE:
BY:

SAES-T-624 Telecommunications Outside Plant – Fiber Optics


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
3 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-W-013 Welding Requirements for Offshore Structures
ENGG CERT

SAUDI ARAMCO Material System Specifications (SAMSS)

01-SAMSS-010 Fabricated Carbon Steel Piping

01-SAMSS-024 Pipe Handling and Nesting

01-SAMSS-035 API Line Pipe

09-SAMSS-068 Coal Tar Epoxy


DESCRIPTION

09-SAMSS-087 Epoxy Coating for Application on Damp Steel Surfaces

SAUDI ARAMCO Standard Drawings

AB-036381 Thermite Welding of Cables

SAUDI ARAMCO Instruction Manuals and Procedures


JO/EWO

No. 1.519 Working Around Offshore Producing Facilities

G.I.2.100 General Instruction Manual


DATE

M.I. 1197.001 Marine Instruction Manual


NO.
REV

DISCIPLINE
ENGINEER
--- "Basic Marine Vessel Specifications & Requirements"
Document
DATE:
PROJECT
ENGINEER AHSOPS Hydrographic Survey Operating Procedures and Standards

DATE: Approved Protective Coating Systems (APCS)


CERTIFIED

Refer to DE-119889 (referencing SAES-H-002 and SAES-H-101) for the


DATE: following descriptions:
CONSTRUCTION
AGENCY
APCS-3 Coal Tar Epoxy Coating for Immersion Service (Self Priming)
DATE:
OPERATIONS
APCS-22 Epoxy Coating for Application onto Damp Steel Surfaces
(Self-Priming or with Epoxy Primer)
DATE:
CONTROL NUMBER

2.3 The latest edition of the following Industry Codes and Specifications shall apply:
VERIFICATION
EDSD

API 5L Specification for Line Pipe


DATE:
BY:

AWS A5 Weld Filler Metals


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
4 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AWS D1.1 Structural Welding Code
ENGG CERT

ASTM A193 Alloy Steel Bolting Materials

ASTM A194 Carbon and Alloy Steel Nuts

SSPC Steel Structures Painting Council

3.0 GENERAL REQUIREMENTS


DESCRIPTION

3.1 Submarine cables shall be installed, and all associated appurtenances shall be
5 fabricated and installed in accordance with this Procedure, the Scope of Work, the
Contract Drawings, and the Codes, Standards, Specifications and References
listed in Section 2.0 of this Procedure.

(*) 3.2 Any deviation from this Procedure, Scope of Work, or from the Contract Drawings
will not be permitted unless prior written approval is obtained from SAUDI
5 ARAMCO. Responsibility for identifying differences and/or deviations and
obtaining approval shall rest with CONTRACTOR.
JO/EWO

3.3 Shop drawings shall be furnished by CONTRACTOR to SAUDI ARAMCO for


information and review prior to start of fabrication. As-built drawings identifying all
DATE

modifications shall be supplied by CONTRACTOR no later than thirty days after


completion of fabrication.
NO.
REV

3.4 Components to be installed offshore shall be trial fitted onshore wherever possible
DISCIPLINE
ENGINEER to ensure correct fit.

DATE: 3.5 CONTRACTOR shall provide a cable installation spread (including laying, diving,
PROJECT
ENGINEER survey, testing and other) with component barges and vessels in good working
condition, suitable for the intended work, staffed by fully qualified and competent
DATE: personnel, and approved by SAUDI ARAMCO.
CERTIFIED

3.6 CONTRACTOR shall supply resumes and qualifications, including those of sub-
DATE:
CONSTRUCTION
contractor organizations, for all In-Kingdom and Out-of-Kingdom supervisory and
AGENCY other key personnel, (including divers), to accomplish the WORK, and is to supply
additional resumes and qualifications as may be requested by SAUDI ARAMCO.
DATE:
OPERATIONS
3.7 CONTRACTOR shall carry necessary backup equipment and sufficient spare
parts at all times to ensure that no undue delays are caused to the cable lay
DATE: operation due to equipment breakdown. A list of such equipment and spares
CONTROL NUMBER
VERIFICATION

shall be submitted to SAUDI ARAMCO for review.


EDSD

3.8 CONTRACTOR shall be acquainted with all applicable safety requirements and
DATE:

ensure that both personnel and equipment comply with these requirements at all
BY:

times.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
5 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.9 One copy of CONTRACTOR's approved welding procedures and individual
welder's qualifications shall be retained for use at the fabrication site and/or on the
ENGG CERT

applicable installation barge or vessel(s) at the installation site. No welder qualifi-


cation shall be allowed offshore.

3.10 CONTRACTOR shall provide a complete set of installation drawings, procedures


and relevant specifications dedicated for SAUDI ARAMCO use on board the
installation spread. This set of documents shall be in addition to those required by
CONTRACTOR.

3.11 CONTRACTOR shall continuously check and inspect the work in strict
DESCRIPTION

accordance with his approved QA/QC procedures during construction and shall
perform such remedial work or non-operational tests as may be necessary to
ensure the integrity of the work and its performance in accordance with the
Contract Drawings, Scope of Work, and the listed relevant Codes, Standards,
Specifications and References.

3.12 All construction barges are required to have three attendant anchor handling tug
boats (AHTs) while moving into or out of the field, and while moving within the
field. In addition, no material barge shall be left unattended whether in the field or
JO/EWO

at anchorage outside the field. Each material barge shall be attended by its own
tug at all times.
DATE

Each vessel shall meet the requirements of SAUDI ARAMCO Operating


5 Instruction No. 1.519 and the "Basic Marine Vessel Specifications &
NO.
REV

Requirements" document. In addition, vessels shall meet the requirements of


DISCIPLINE
ENGINEER
Construction Procedure DE-119959.

DATE: 3.13 CONTRACTOR shall move into the work site only after all applicable provisions of
PROJECT
ENGINEER SAUDI ARAMCO Operations Instruction No. 1.519 and the "Basic Marine Vessel
Specifications & Requirements" document have been met. This includes but is
DATE: not limited to the notification period for offshore installation and testing equipment,
CERTIFIED the submittal of all required procedures, a Work Review and Planning Meeting
with CONTRACTOR's representative in attendance, and compliance with General
DATE: Instruction No. 2.100 for Work Permit issuance. These provisions apply to each
CONSTRUCTION
AGENCY separate work site move-in.

DATE: No work shall be performed without a Work Permit. CONTRACTOR shall be


OPERATIONS
responsible for obtaining Work Permits on a timely basis to start work.

DATE: 3.14 All barges and vessels utiliz ing anchors shall have fluke and gravity style anchors
CONTROL NUMBER

decked or secured with a double strap clear of the water in an A-frame during
VERIFICATION

anchor movements across pipelines or cables regardless of water depth.


EDSD

3.15 CONTRACTOR shall provide a daily installation report for the installation work in
DATE:
BY:

5
accordance with Construction Procedure DE-119895 and Appendix A, Daily
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Installation Report (Sample).


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
6 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.16 CONTRACTOR shall provide a senior full time English speaking Safety Officer on
all construction barges, diving vessels, and work boats. One Safety Officer per
ENGG CERT

shift is required on construction barges. Safety Officer shall report either to the
Master or Barge Superintendent. Safety Officer shall have full authority to stop
work at any time that he should see fit based on breaches of safety.

Safety Officer shall be familiar with SOLAS regulations, diving procedures and
regulations, life saving operations, fire equipment and breathing apparatus,
helicopter safety, hygiene standards, SAUDI ARAMCO Work Permit
requirements, SAUDI ARAMCO emergency procedures, and all other aspects of
offshore work. Safety Officer shall also be responsible for implementing and
DESCRIPTION

enforcing CONTRACTOR's safety program and procedures. Safety Officer shall


be subject to the approval of SAUDI ARAMCO and may be subject to a SAUDI
ARAMCO test at SAUDI ARAMCO's discretion.

3.17 CONTRACTOR shall be responsible for ensuring that the owners of all non-
CONTRACTOR owned vessels used by CONTRACTOR in the performance of
any part of the work in Saudi Arabian waters have a Port Captain and Port
Engineer on twenty four hour call resident in the Eastern Province of Saudi Arabia
during the course of the work.
JO/EWO

4.0 MATERIAL HANDLING AND INSPECTION


DATE

4.1 Material Handling


NO.
REV

4.1.1 CONTRACTOR shall receive, inspect, safeguard, handle, protect and


DISCIPLINE
ENGINEER
5 store, all SAUDI ARAMCO supplied F.I.M. materials and be accountable
for all such materials transferred into CONTRACTOR's custody in
DATE: accordance with Construction Procedure DE-119892.
PROJECT
ENGINEER

CONTRACTOR shall nominate a minimum of 3 persons authorized to


DATE: receive F.I.M. materials at the Offshore Job Site(s), and provide
CERTIFIED
SAUDI ARAMCO Representative with specimen signatures before
MOB.
DATE:
CONSTRUCTION
AGENCY 4.1.2 Details of materials to be purchased by CONTRACTOR shall be
submitted in writing to SAUDI ARAMC O for approval prior to purchase,
DATE: allowing reasonable time for evaluation without disruption of the
OPERATIONS
installation schedule. Details shall include the reason for purchase,
effect on schedule, full specification, physical properties and tests of
DATE: proposed materials, and any other pertinent information requested by
CONTROL NUMBER
VERIFICATION

SAUDI ARAMCO.
EDSD

5 4.1.3 Material substitution shall be in accordance with Construction Procedure


DATE:

DE-119892.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
7 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2 Inspection of Materials
ENGG CERT

All submarine cables and other SAUDI ARAMCO supplied materials shall be
thoroughly examined in the SAUDI ARAMCO staging area by CONTRACTOR for
damage prior to load-out by CONTRACTOR. Any damage or non-conformity
shall be reported to and verified by the on site SAUDI ARAMCO Representative.

5.0 WELDING

5.1 All welding, weld inspection, and other similar welding activities shall be
5
DESCRIPTION

conducted in accordance with Construction Procedure DE-119896.

5.2 Internal misalignment (high-low) of J-tube pipe shall not exceed 1/16 inch. API 5L
mill tolerances may exceed this requirement. CONTRACTOR shall align the
pipes so this maximum is not exceeded.

6.0 PROTECTIVE COATINGS

6.1 Structural Components


JO/EWO

Structural components such as clamps, cable ladders, splitter box supports, and
other similar items to be installed above water level shall be coated using APCS-
DATE

22 in accordance with the Contract Drawings. The above water portion of J-


tubes, J-tube guards, and other similar items shall be coated using APCS-22 in
accordance with the Contract Drawings. Below water clamps and the below
NO.
REV

DISCIPLINE
water portion of J-tubes, J-tube guards, and other similar items shall be coated
ENGINEER using APCS-3. No internal coating of J-tubes is required.
DATE:
PROJECT
The inside portion of J-tube clamps where they attach to the J-tube shall be lined
ENGINEER using neoprene in accordance with the Contract Drawings. All components to be
5 coated shall be prepared and coated in accordance with Construction Procedure
DATE:
DE-119889. When transitioning between APCS-3 and APCS-22 on a structural
CERTIFIED
component, APCS-3 shall lap over APCS-22 by a minimum of 75 mm.
DATE:
CONSTRUCTION
6.2 Preparation and Application
AGENCY

6.2.1 Preparation and application of APCS-3 coal tar epoxy coating system
DATE: 5
OPERATIONS
shall be in accordance with Construction Procedures DE-119892 and
DE-119889, SAES-H-100, SAES-H-101, and 09-SAMSS-068, which are
applicable to this coating system.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
8 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.2.2 Preparation and application of APCS-22 epoxy coating system shall be
in accordance with Construction Specifications DE-119892 and DE-
ENGG CERT

119889, SAES-H-100, SAES-H-101, and 09-SAMSS-087, which are


applicable to this coating system.

6.2.3 All coating materials shall be handled and stored in accordance with
5 Construction Procedure DE-119892. Coating materials shall be kept
tightly sealed at all times when not in use, and shall not be opened until
immediately before it is required.

7.0 SURVEY REQUIREMENTS


DESCRIPTION

7.1 General

7.1.1 CONTRACTOR shall refer to SAUDI ARAMCO Hydrographic Survey


Operating Procedures and Standards (AHSOPS) for additional survey
requirements.

7.1.2 CONTRACTOR shall provide a dive survey vessel for the pre and post
construction surveys meeting the requirements of SAUDI ARAMCO
JO/EWO

5
Operating Instruction No. 1.519, and the "Basic Marine Vessel
Specifications & Requirements" document and Construction Procedure
DATE

DE-119959.

The vessel is to be equipped with the following equipment, facilities


NO.
REV

and personnel in addition to that described in Section 7.2.2 of this


DISCIPLINE
ENGINEER Specification.

DATE: • 5 tons capacity, at 40 foot radius, telescopic crane with fully


PROJECT
ENGINEER qualified and experienced personnel to operate this facility

DATE: • Survey Post Processing Equipment


CERTIFIED

• Side Scan Sonar


DATE:
CONSTRUCTION
AGENCY
• Echo Sounder


DATE:
OPERATIONS Remote Operated Vehicle (ROV) (if required by the Scope of Work)
for post construction survey


DATE:
Hand held and diver head mounted video cameras for pre-
CONTROL NUMBER
VERIFICATION

construction and post-construction surveys.


EDSD

• Sufficient SAUDI ARAMCO approved divers, equipment, and


DATE:
BY:

supervision to accomplish the work.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

CONTRACTOR shall refer to Appendix D, Survey Personnel


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Requirements, for addition requirements.


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
9 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.2 Barge Management
ENGG CERT

7.2.1 General

7.2.1.1 CONTRACTOR shall supply a comprehensive Barge


Management System (BMS), as defined in the "Basic
Marine Vessel Specifications & Requirements" document
under `Barge Management System' (BMS) configured to
provide accurate positioning facilities to CONTRACTOR's
construction/installation barges and associated anchor
handling tugs (AHTs).
DESCRIPTION

7.2.2 Barge Positioning System

7.2.2.1 CONTRACTOR's primary positioning system shall be a


differential global positioning system (DGPS) as defined in
the "Basic Marine Vessel Specifications & Requirements"
document under `Barge Positioning System'.

Supplementary to these Specifications and Requirements:


JO/EWO

7.2.2.2, 7.2.2.3 and 7.2.2.4 additionally apply to the DGPS


to be provided.
DATE

7.2.2.2 SAUDI ARAMCO will supply coordinates of shore sites


and/or offshore structures for use as base stations for the
NO.
REV

secondary ground based positioning system.


DISCIPLINE
ENGINEER
7.2.2.3 Any power supplies installed on producing well platforms or
DATE: GOSPs shall be enclosed in explosion proof sealed cases,
PROJECT
ENGINEER or make use of solar panels and battery power.

DATE: (*) 7.2.2.4 CONTRACTOR shall present the proposed primary and
CERTIFIED secondary positioning systems calibration procedures to
SAUDI ARAMCO for approval at least 14 days before
DATE: commencement of work in the field.
CONSTRUCTION
AGENCY
7.2.3 Other Construction/Work Vessels
DATE:
OPERATIONS
All AHTs, dive vessels, diver/survey vessels, survey vessels and other
construction or work vessels shall have the capability to continuously
DATE: 5 position themselves using the same system and requirements
CONTROL NUMBER

described in Section 7.2.2 of this Procedure. A single dedicated


VERIFICATION

qualified SAUDI ARAMCO approved surveyor shall be onboard each


EDSD

of these construction/work vessels.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
10 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.2.4 Data Transmission Link
ENGG CERT

A two-way data telemetry link shall be in place on the barge and


AHTs. The barge shall be capable of automatic and continuous
transmission of its position and proposed anchor positions to the
AHTs. The AHTs shall be capable of automatic and continuous
transmission of its position and actual anchor drop position to the
barge control station. Radio voice communication shall be the back
up data transmission link.

7.2.5 Data Acquisition and Processing System


DESCRIPTION

7.2.5.1 General

All data collecting equipment and data collected and


processed associated with the BMS Control Station both
on the CONTRACTOR's barge, and on the AHT(s), shall
be as defined in the "Basic Marine Vessel Specifications
& Requirements" document under `Data Acquisition and
Processing System', except that following additional VDU
JO/EWO

display information shall also be available during all


phases of the operation:
DATE

• Position of submarine cable touchdown point (in lay


mode)
NO.
REV

DISCIPLINE
ENGINEER • Actual submarine cable track (in lay mode)

DATE: • Distance from start of submarine cable (in lay mode)


PROJECT
ENGINEER

• Submarine cable station number (in lay mode)


DATE:
CERTIFIED
7.2.5.2 If requested by SAUDI ARAMCO, CONTRACTOR shall
download the data to a 1.44 MB diskette in a PC compatible
DATE:
CONSTRUCTION
file format. Data may be stored in a binary format if
AGENCY CONTRACTOR provides a PC EXE file that can expand the
information to a fixed length record ASCII format.
DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
11 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.3 Pre-Construction Survey
ENGG CERT

7.3.1 CONTRACTOR shall conduct a pre-construction survey of each


submarine cable route using an echo sounder and side scan sonar.
CONTRACTOR's survey limits shall comprise the proposed
submarine cable route, and additionally shall include an area
extending 600 feet (183 meters) beyond the intended anchor pattern
of the barge. Surveys shall be in accordance with Section 2.4 of
SAUDI ARAMCO Hydrographic Operating Procedures and Standards
(AHSOPS). Sediment samples are not required.
DESCRIPTION

Depending upon water depth CONTRACTOR shall utilize 75 meters


range with 50 meters line spacing, 100 meters range with 75 meters
line spacing or 100 meters range with 100 meters line spacing. A 100
kHz sonar towfish shall be used.

7.3.2 All surface and subsurface obstructions shall be plotted on a plan of


the anchor pattern area, and on a profile along the centerline of the
proposed submarine cable route.
JO/EWO

All depths shall be reduced to lowest astronomical tide (LAT).


CONTRACTOR shall be responsible for checking the accuracy and
consistency of the SAUDI ARAMCO supplied submarine cable route,
DATE

route survey and compilation chart information. CONTRACTOR shall


inform SAUDI ARAMCO of any discrepancies found before mobilizing
NO.
REV

the installation spread.


DISCIPLINE
ENGINEER
7.3.3 Should the survey indicate that a certain section of the submarine
DATE: cable design route is not viable due to seabed features or extensive
PROJECT
ENGINEER seabed obstructions, SAUDI ARAMCO may authorize CONTRACTOR
to run additional survey lines to identify a more acceptable route.
DATE:
CERTIFIED 7.3.4 CONTRACTOR shall install and maintain marker buoys on all existing
pipelines and cables, and any obstructions within the submarine cable
DATE: corridor, and additionally shall include an area extending 600 feet
CONSTRUCTION
AGENCY (183 meters) beyond the intended anchor pattern of a barge or vessel.
Buoys shall be placed and tied at maximum intervals of 600 feet (183
DATE: meters), but in no case shall there be less than three buoys on a
OPERATIONS
pipeline or cable.

DATE: Buoys shall be color coded and so placed and tied as to clearly
CONTROL NUMBER

indicate the location and direction of all pipelines and cables.


VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
12 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All buoys shall be tied directly to pipelines with soft line. For cables,
only every third buoy shall be tied directly to the cable.
ENGG CERT

All buoys shall be maintained by CONTRACTOR until all work


requiring anchoring is completed.

7.4 Submarine Cable Installation Survey

7.4.1 CONTRACTOR shall ensure by means of the positioning system


installed on the barge that the submarine cable is installed within the
corridor specified in the Contract Drawings and within a 2 degrees
DESCRIPTION

maximum deviation from the design submarine cable heading, or as


otherwise specified in the Scope of Work.

7.4.2 During submarine cable installation CONTRACTOR shall:

7.4.2.1 Provide barge positioning to the accuracy required to meet


specified installation corridor requirements as defined in the
Contract Drawings.
JO/EWO

7.4.2.2 Define anchor positions.

7.4.2.3 Mark the location of existing pipelines, cables, and other


DATE

structures in critical areas and identify any pipeline or cable


crossings with double marker buoys. CONTRACTOR shall
NO.
REV

ensure that crossing supports and the like are installed


DISCIPLINE
ENGINEER
within the tolerance stated in the Scope of Work and/or
Contract Drawings.
DATE:
PROJECT
ENGINEER 7.4.3 The submarine cable shall be closely monitored as it is being laid for
any out-of-corridor tolerance or for any damage. The monitoring shall
DATE: be undertaken using divers (or by ROV if required by the Scope of
CERTIFIED Work) at all minor bends (small radius curves of the submarine
cables), crossings and during J-tube pulls.
DATE:
CONSTRUCTION
AGENCY 7.4.4 CONTRACTOR shall identify all submarine cable spans and correct
those spans so that the entire submarine cable is supported. A record
DATE: of these spans and crossings of existing pipelines and cables shall be
OPERATIONS
prepared and maintained by submarine cable station number, pipeline
or cable being crossed, length of span and height of span.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
13 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.5 Post-Construction Survey
ENGG CERT

7.5.1 CONTRACTOR shall undertake a post-construction survey after


completion of the submarine cable installation to verify that the
submarine cable has been installed within the specified submarine
cable corridor parameters, to ensure that all spans are adequately
corrected, and that no damage has occurred to the submarine cable.
Any deviation of the submarine cable installation outside these
parameters shall also be identified. Utilization of a ROV is considered
optional unless specifically required in the Scope of Work.
DESCRIPTION

7.5.2 Surveys shall be in accordance with Section 2.5 of SAUDI ARAMCO


Hydrographic Survey Operating Procedures and Stanadrs (AHSOPS)

7.5.3 Submarine cable coordinates and top of cable depths shall be


obtained by crossing the submarine cable at maximum spacings of
165 feet (50 meters). The coordinates of the submarine cable shall
not be obtained by attempting a single position fix on top of the cable,
but shall be computed from position fixes taken just before and after
crossing the cable.
JO/EWO

7.5.4 CONTRACTOR shall run additional lines at the location of all special
submarine cable features such as starts and stops of protective cover,
DATE

minor bends, existing pipeline and cable crossings, and similar items.
CONTRACTOR shall pay particular attention to any locations where
NO.
REV

the cable spans above the seabed and obtain full details of any such
DISCIPLINE
ENGINEER
location.

DATE: 7.5.5 CONTRACTOR shall obtain a diver video record, with voice overlay,
PROJECT
ENGINEER of special features along the installed submarine cable including J-
tubes, cable fittings (if any), spans, supports, crossings, protective
DATE: cover (for example, grout bags), trenching start and stop locations (if
5
CERTIFIED applicable), and other similar items. Videos shall meet the
requirements of Section 8.10 of this Procedure. All vessels with
DATE: onboard subsea video recording capability shall have the necessary
CONSTRUCTION
AGENCY equipment to add text, edit, add voice-over, and copy videos. Each
submarine cable shall have separate videos.
DATE:
OPERATIONS
7.5.6 CONTRACTOR shall obtain a video record of one side of the installed
submarine cable (including the trench for any trenched portions) using
DATE: an ROV, if required by the Scope of Work. Particular attention shall
CONTROL NUMBER

be paid to all special submarine cable features, spans, and all areas
VERIFICATION

of damage. Still color pictures shall be taken of all important features


EDSD

as directed by SAUDI ARAMCO.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
14 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.5.7 The ROV (if required by the Scope of Work) to be employed by
CONTRACTOR on the post-construction survey shall, unless
ENGG CERT

otherwise specified, be capable of deployment and operation in


currents of 2 knots to a maximum depth of 150 feet (46 meters), and a
horizontal excursion of 350 feet (107 meters) minimum from the
support vessel.

7.5.8 The size and performance of the ROV if required by the Scope of
Work shall be as defined in the Scope of Work.

7.5.9 If an ROV is used by CONTRACTOR, CONTRACTOR shall refer to


DESCRIPTION

Appendix B, Remote Operated Vehicle Procedure Requirements, for


additional ROV requirements.

8.0 SUBMARINE CABLE INSTALLATION

8.1 Submarine Cable Installation Spread

CONTRACTOR shall refer to Appendix C, Construction/Installation Spread Pre-


Mobilization Vessel Survey Requirements , for details of the submarine cable
JO/EWO

installation spread pre-mobilization requirements. Reference is made to SAUDI


ARAMCO Operating Instruction No. 1.519 and the "Basic Marine Vessel
DATE

Specifications & Requirements" document for additional details.

8.2 Submarine Cable Laying


NO.
REV

DISCIPLINE
ENGINEER 8.2.1 The direction of submarine cable lay shall be as defined in the Scope
of Work, Contract Drawings, or as agreed by CONTRACTOR with
DATE: SAUDI ARAMCO.
PROJECT
ENGINEER

8.2.2 CONTRACTOR shall provide details of the maximum weather


DATE: conditions during which he considers it safe to maintain submarine
CERTIFIED
cable laying operations without risk of damage to the submarine
cable. A detailed analysis of CONTRACTOR's assessment shall be
DATE:
CONSTRUCTION
submitted with the submarine cable lay calculations.
AGENCY

8.2.3 CONTRACTOR shall perform calibration checking of the cable (hauler


DATE: or tension device), departure angle, length, and associated monitors
OPERATIONS
prior to the commencement of the cable lay, to ensure that the hauler,
and monitors are within the manufacturers specified settings. Results
DATE: of the calibrations are to be submitted to SAUDI ARAMCO for
CONTROL NUMBER
VERIFICATION

approval 14 days prior to specific tension adjustment and start of


cable lay.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
15 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.2.4 During installation, the tension exerted on the submarine cable shall
not exceed the values specified in the Scope of Work. At no time
ENGG CERT

shall CONTRACTOR allow the submarine cable to assume a radius


less than the minimum bend radius specified in the Scope of Work or
cable specification which is larger. Catenaries shall be calculated for
the water depth and tension ranges to be utilized during the cable
laying operations. Submerged weight, barge motion, barge trim, and
current forces acting on the submarine cable shall also be considered.
CONTRACTOR shall submit calculations to SAUDI ARAMCO
demonstrating and confirming that limiting conditions can be met.
DESCRIPTION

8.2.5 Only SAUDI ARAMCO approved cable grips, pulling eyes, and cable
end seals shall be used to handle and install the submarine cables.

8.2.6 CONTRACTOR shall take all necessary steps to ensure that all
submarine cable laying parameters such as cable tension, barge
attitude, barge orientation, barge offset, departure angle, and
departure ramp configuration conform at all times to the procedures
agreed and accepted by SAUDI ARAMCO.
JO/EWO

8.2.7 Any departure from the expected behavior of the submarine cable
during installation as detailed in the procedures shall be investigated
as to its cause, and remedial action taken to the satisfaction of SAUDI
DATE

ARAMCO.
NO.
REV

8.2.8 CONTRACTOR shall keep a continuous record of the tension and


DISCIPLINE
ENGINEER
angle exerted on the submarine cable during all submarine cable lay
operations, including any abandonment and recovery of the
DATE: submarine cable. The recording shall be of a continuous nature
PROJECT
ENGINEER produced by suitable automatic recording instruments. A copy of the
recordings shall be submitted to SAUDI ARAMCO for each cable laid.
DATE:
CERTIFIED 8.2.9 The adjustment regulation of the cable or hauler or tension device
shall be such that the variations of tension and departure angle
DATE: remain within safe limits, and that the movements of the tension
CONSTRUCTION
AGENCY device remain smooth both at standstill and during laying.

DATE: 8.2.10 CONTRACTOR shall nominate two persons on each shift who will be
OPERATIONS
responsible for the correct regulation of the cable (hauler or tension
device) and departure angle parameters. Except in an emergency, no
DATE: other person shall make any change in the laying parameters.
CONTROL NUMBER
VERIFICATION

8.2.11 Permanent supports shall be installed by CONTRACTOR where


EDSD

necessary to eliminate spans in the submarine cable.


DATE:
BY:

8.2.12 Fiber Optic Cables shall be installed such that 1 – 3% of the total
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

installed length is slack.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
16 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.3 Crossings, Span Correction, Cable Anchoring Equipment, and Protective Cover
ENGG CERT

8.3.1 Crossing clearances shall be as defined in the Contract Drawings. In


the event of unanticipated settlement of crossing supports, a minimum
clearance of 12-inch shall be achieved. The bridging of existing
pipelines or cables shall be accomplished as per the Scope of Work
and Contract Drawings. The bridging shall be accomplished using
grout bags. CONTRACTOR may elect to supplement use of grout
bags by using precast reinforced concrete blocks to form the base of
the support as agreed with and as approved by SAUDI ARAMCO.
DESCRIPTION

(*) 8.3.2 Use of temporary sleepers or bridging by CONTRACTOR to support


and provide the required separation for the new submarine cable
during lay over existing pipelines or cables is generally acceptable to
SAUDI ARAMCO. CONTRACTOR shall supply procedures 14 days
prior to operational mobilization detailing the following to SAUDI
ARAMCO for review and approval:

• Height, length, width, and cross-sectional shape of proposed


sleepers or bridging.
JO/EWO

• Quantity and locations (with respect to the new submarine cable) of


DATE

sleepers or bridging proposed for each crossing.

• Sleeper or bridging removal procedures including any required


NO.
REV

submarine cable lifting.


DISCIPLINE
ENGINEER

• Submarine cable lifting calculations and procedures (for any


DATE:
PROJECT
required submarine cable lifting).
ENGINEER

8.3.3 The installation of both crossing supports and the submarine cable
DATE: itself shall be monitored by divers. The divers shall take
CERTIFIED
comprehensive video of the overall operation.
DATE:
CONSTRUCTION
8.3.4 Any height discrepancy between the submarine cable and the
AGENCY crossing supports shall be rectified by inserting grout bags. All
permanent crossing supports shall be installed prior to submarine
DATE:
OPERATIONS
cable testing.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
17 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.3.5 Supports to correct (eliminate) spans shall be installed by
CONTRACTOR at SAUDI ARAMCO's direction based on the results
ENGG CERT

of CONTRACTOR's post submarine cable lay survey. Span


correction support bridging shall be accomplished using grout bags.
CONTRACTOR may elect to supplement use of grout bags by using
precast reinforced concrete blocks to form the base of the support as
agreed with and as approved by SAUDI ARAMCO for use as crossing
supports.

8.3.6 Submarine cable anchoring (hold-back or tie-back) to the platform


type equipment, shall be installed as specified in the Scope of Work or
DESCRIPTION

Contract Drawings.

8.3.7 The submarine cables shall be protected by trenching or installation of


grout bags as a protective cover over the submarine cables as and
when specified in the Scope of Work or Contract Drawings. The type
and extent or limits of protection shall be as specified in the Scope of
Work or the Contract Drawings.

When trenching is specified, but the minimum acceptable trench


JO/EWO

depth or cover (measured from the top of the submarine cable to


natural seabed) is not specified, the minimum acceptable trench depth
shall be taken as one meter. Backfilling is not required when
DATE

trenching is specified. Transitions from untrenched to fully trenched or


fully trenched to untrenched shall be such that the bend radius of the
NO.
REV

submarine cable is at all times above the minimum bend radius for the
DISCIPLINE
ENGINEER
submarine cable as noted in the Scope of Work and Contract
Drawings.
DATE:
PROJECT
ENGINEER 8.3.8 Grout shall consist of Type V sulfate-resistant portland cement in
accordance with the Contract Drawings and SAES-Q-001. Neat or
DATE: neat dry cement may be used at CONTRACTOR's discretion.
CERTIFIED

8.3.9 Grout bags shall be ULO pillow bags with a double flap inlet, or
DATE: equivalent. One sample of CONTRACTOR's proposed bags shall be
CONSTRUCTION
AGENCY submitted to SAUDI ARAMCO for review and approval 14 days prior
to bags being filled and placed, or placed and filled in place.
DATE:
OPERATIONS
8.4 Commencement and Intervention of Lay

DATE: 8.4.1 CONTRACTOR shall not commence submarine cable lay until a
CONTROL NUMBER

satisfactory weather window is identified which offers a reasonable


VERIFICATION

assurance that the cable lay operation can proceed to completion


EDSD

without undue risk of encountering unfavorable weather. Agreement


shall be obtained with SAUDI ARAMCO regarding the satisfactory
DATE:
BY:

nature of any such forecast.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
18 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.4.2 If it becomes necessary to cease normal cable lay operations,
CONTRACTOR shall implement SAUDI ARAMCO approved
ENGG CERT

contingency procedures. Such procedures shall include but not be


limited to:

• Slow lay (to prevent damage to submarine cable)

• Barge heading change (to the extent possible)

• Submarine cable abandonment and subsequent recovery


DESCRIPTION

8.4.3 During the cable laying operations, if the environment is such that the
lay vessel cannot continue the cable laying operation, the laying
vessel and anchoring system shall still be of adequate design so that
the laying vessel can hold its station.

8.4.4 If it becomes necessary to abandon the submarine cable on the seabed,


the cable end shall be satisfactorily sealed and a holdback cable shall
be attached to cable grips on the submarine cable in order to maintain
tension during the abandonment operation. A spar buoy or three marker
JO/EWO

buoys of a different color than that used for existing pipelines and cables
in that particular vicinity shall be attached by a suitable line to the end of
DATE

the submarine cable so that its location can be easily identified during
recovery. CONTRACTOR shall ensure that the buoyed submarine
cable remains stable on the seabed.
NO.
REV

DISCIPLINE
ENGINEER 8.5 Anchor Patterns

DATE: 8.5.1 CONTRACTOR shall provide precise anchor patterns when the
PROJECT
ENGINEER submarine cable lay barge is within 1,200 meters of an existing
structure, and for any anchor position falling within 150 meters of an
DATE: existing cable or pipeline.
CERTIFIED

8.5.2 CONTRACTOR shall show method of anchor running and setting, and
DATE:
CONSTRUCTION
expected wire tensions both at rest and during submarine cable laying.
AGENCY CONTRACTOR shall confirm that the total loss of effectiveness of any
one anchor (running anchors, broken wire, sliding, or other event) does
DATE:
not endanger the submarine cable, and shall set out details of any
OPERATIONS
anchor moving operations where a special anchor pattern to avoid
existing obstructions and structures renders such movements critical.
DATE: Precise anchor patterns shall also be provided when the cable lay barge
CONTROL NUMBER
VERIFICATION

crosses over an existing pipeline, cable or other obstruction requiring


special care.
EDSD

DATE:

8.5.3 Anchor patterns shall be arranged in such a way as to minimize the


BY:

number of movements near existing structures, pipelines, and cables.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
19 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.5.4 Anchor pattern drawings shall be prepared by CONTRACTOR and
submitted to SAUDI ARAMCO a minimum of six weeks in advance of
ENGG CERT

the scheduled set-up date for review and approval. Anchor patterns
require SAUDI ARAMCO approval prior to commencing set-up.

8.6 Monitoring

8.6.1 CONTRACTOR shall continuously monitor and record all aspects of the
submarine cable installation operation including but not limited to the
following:
DESCRIPTION

8.6.1.1 The cable lay barge track and heading as indicated by the
positioning system.

8.6.1.2 The variation of water depth as measured by the cable lay


barge echo-sounder.

8.6.1.3 The tension applied to the submarine cable by the


tensioning device (cable hauler or A & R winch).
JO/EWO

8.6.1.4 The submarine cable departure angle off of the lay ramp.

8.6.1.5 Weld inspection records as required by Construction


DATE

5
Procedure DE-119896.
NO.
REV

8.6.1.6 A general daily record of all work carried out on the cable
DISCIPLINE
ENGINEER
lay barge including details of anchor movements, weather
downtime, laying progress, mechanical downtime, and other
DATE: 5 related activities. This information in combination with
PROJECT
ENGINEER Appendix A, Daily Installation Report (Sample), and
Construction Procedure DE-119895 shall be submitted by
DATE: CONTRACTOR to SAUDI ARAMCO.
CERTIFIED

8.6.1.7 A video camera(s) is to be utilized at the mouth of the J-


DATE: tube to monitor and record the installation of the cable into
CONSTRUCTION
AGENCY the J-tube.

DATE: 8.6.2 CONTRACTOR shall maintain a daily submarine cable laying log
OPERATIONS
detailing total length of submarine cable laid and relevant submarine
cable kilometer station (KS).
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
20 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.7 Procedures
ENGG CERT

8.7.1 General

CONTRACTOR shall develop detailed procedures for all phases of


the submarine cable installation, including load-out to and from the
installation vessel, and for cable handling in general, and submit them
for SAUDI ARAMCO approval prior to commencement of the work.

Copies of these procedures and all installation drawings shall be


provided on the submarine cable installation barge and vessels for
DESCRIPTION

use by SAUDI ARAMCO in accordance with the Scope of Work. The


contents of these procedures shall be adhered to and shall be kept
updated in accordance with any Contract changes approved by
SAUDI ARAMCO.

These procedures shall include but not be limited to the following:

(*) 8.7.2 Submarine Cable Lay Start-Up and Laydown Procedures


JO/EWO

CONTRACTOR shall submit a complete procedure for initiating and


termination of the submarine cable lay operations. The procedure
shall indicate the method and procedures to be used to perform the J-
DATE

tube pull and to insure accurate positioning of the submarine cable on


the seabed at the platforms, anchor patterns and anchor handling,
NO.
REV

navigation and survey, submarine cable handling, J-tube installation,


DISCIPLINE
ENGINEER
(when included in the Scope of Work), first end connection J-tube pull,
and second end connection J-tube pull. The ends of the cable shall
DATE: be sealed to prevent in ingress of water when submerged. Cable
PROJECT
ENGINEER splices shall not be pulled into or through J-tubes. (This applies to
both factory and field splices.
DATE:
CERTIFIED This procedure shall also address all preparatory work (installation of
splitter box supports, cable ladders, and other similar items). It shall
DATE: also address all completion activities such as submarine cable armor
CONSTRUCTION
AGENCY clamp and ground installation, supports, clips, heat shrink coverings,
and submarine cable terminating or splicing.
DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
21 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 8.7.3 Normal Submarine Cable Lay Procedures
ENGG CERT

8.7.3.1 Complete and detailed submarine cable installation


procedures and installation analysis shall be submitted for
normal cable lay operation. The analysis shall model the
equipment which will be used to perform the work in the
deepest and shallowest water along the proposed route.

8.7.3.2 CONTRACTOR shall submit the sequence of events


planned for the laying of the submarine cable between
platforms, and all related procedures for implementing these
DESCRIPTION

plans. The information and procedures shall include, but


not be limited to the following:

• Cable lay barge and equipment, and catenary profile


and details during the lay operation, ramp support
and roller/guide locations and elevations, and tension
and departure angle ranges to be used for each
submarine cable.
JO/EWO

• The initial, various intermediate, and final mooring


positions of the barge and other vessels that will be
DATE

working on anchors shall be submitted for SAUDI


ARAMCO review and approval for all submarine
cables at least six weeks in advance of the scheduled
NO.
REV

set-up. Prior to submittal to SAUDI ARAMCO,


DISCIPLINE
ENGINEER CONTRACTOR shall ensure that all anchor pattern
drawings have been reviewed and approved by
DATE: CONTRACTOR's barge or vessel offshore operations
PROJECT
ENGINEER supervisory staff.

DATE: All anchor pattern drawings shall be 1:5000 scale on a


CERTIFIED
SAUDI ARAMCO compilation chart plot plan of the
appropriate area. Mooring drawings shall identify the
DATE:
planned start-up (first end connection) and laydown
CONSTRUCTION
AGENCY (second end connection) procedures. Anchor patterns
approved by SAUDI ARAMCO and subsequently altered
DATE: shall be subject to review and reapproval by SAUDI
OPERATIONS
ARAMCO.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
22 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 8.7.4 Cable Abandonment/Recovery and Shifting Procedure
ENGG CERT

CONTRACTOR shall submit a procedure for abandonment and


recovery of the submarine cable and a procedure for lateral shift of
the submarine cable along with a catenary analysis for these
operations.

(*) 8.7.5 Cable Repair Procedure

8.7.5.1 CONTRACTOR shall submit a procedure for repair of the


submarine cable during installation. The procedure shall
DESCRIPTION

address in place repairs for minor damage, and above


water repair for major damage both during lay and after lay.
The procedure shall address the method to be used to
recover the submarine cable to the surface for repair of
major dam age in both the deepest and shallowest water
along the proposed route (both during and after lay), and
shall include a catenary analysis. The procedure shall
describe how the submarine cable will be laid back down on
the seabed if recovered to the surface.
JO/EWO

8.7.5.2 The catenary analysis shall model the submarine cable


being lifted and shall report limiting catenary parameters
DATE

(including tension and departure angle) to prevent damage


to the undamaged portions of the submarine cable.
NO.
REV

DISCIPLINE
ENGINEER
(*) 8.7.6 Coating Procedure

DATE: CONTRACTOR shall submit a procedure for shop and field coating
PROJECT
ENGINEER 5 application, inspection, and repair in accordance with Construction
Procedure DE-119889.
DATE:
CERTIFIED (*) 8.7.7 Welding, Welder Qualifications and NDE Procedures

DATE: 8.7.7.1 CONTRACTOR shall submit a procedure for welding,


CONSTRUCTION
AGENCY welder qualifications and non-destructive examination
5 (NDE) as required by Construction Procedure DE-119896,
DATE: and SAES-W-013.
OPERATIONS

8.7.7.2 Prior to the commencement of work, CONTRACTOR shall


DATE: supply all necessary equipment, materials and personnel
CONTROL NUMBER

required to qualify welders and welding procedures in


VERIFICATION

5
accordance with Construction Procedure DE-119896, and
EDSD

SAES-W-013.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
23 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.7.7.3 CONTRACTOR shall provide all operational equipment,
supplies and qualified personnel required to perform the
ENGG CERT

NDE including radiography, in accordance with this


5 Specification, Construction Procedure DE-119896, SAES-
W-013, and CONTRACTOR's QA/QC Manual (approved by
SAUDI ARAMCO).

(*) 8.7.8 Crossing, Span Correction, and Protection Procedures

8.7.8.1 CONTRACTOR shall submit a procedure for installation of


crossing supports and correction (elimination) of spans in
DESCRIPTION

the submarine cable.

8.7.8.2 CONTRACTOR shall submit a procedure for submarine


cable trenching and/or installation of protective covers (for
example, grout bags) if required by the Scope of Work or
Contract Drawings.

8.7.8.3 CONTRACTOR's procedure shall detail the installation of


supports as shown on the Contract Drawings, as described
JO/EWO

in Section 8.5 of this Specification, and as approved by


SAUDI ARAMCO.
DATE

8.7.8.4 CONTRACTOR shall supply grout, grout bags, and if


applicable, reinforced concrete blocks. CONTRACTOR
NO.
REV

shall submit specific details on the type, style, size, and


DISCIPLINE
ENGINEER
manufacturer of the grout bags. The procedures and
hardware are subject to SAUDI ARAMCO review and
DATE: approval. All reinforcing steel for reinforced concrete blocks
PROJECT
ENGINEER shall be fusion bonded epoxy (FBE) coated.

DATE: 8.7.8.5 CONTRACTOR's trenching procedure shall include all


CERTIFIED details such as trenching machine deployment, trenching
machine recovery, trenching machine monitoring (including
DATE: instrument indications and video cameras), trenching
CONSTRUCTION
AGENCY machine operation and control, weather limitations for
deployment, recovery and operating the machine,
DATE: contingency procedures, troubleshooting procedures along
OPERATIONS
with available spares, and other similar procedures that may
be required.
DATE:
CONTROL NUMBER

8.7.8.6 CONTRACTOR shall submit a description of all vessels and


VERIFICATION

equipment to be utilized for the performance of any


EDSD

crossing, span correction, trenching, and protective cover


work.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
24 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.7.9 Terminating/Testing Procedures
ENGG CERT

8.7.9.1 CONTRACTOR shall supply and install all submarine cable


terminating, splicing, and pre and post installation test
procedures, equipment lists, calibration records and
calibration certificates as detailed in this Specification, the
Scope of Work and the Contract Drawings.

8.7.9.2 Testing shall include, but is not limited to, megger,


continuity, and Hi-Pot testing as outlined in the listed Codes,
Standards, Specifications and References.
DESCRIPTION

8.7.9.3 Cable termination personnel shall be certified by SAUDI


ARAMCO before termination work is started.

8.8 "As-Built" Drawings

8.8.1 CONTRACTOR shall provide to SAUDI ARAMCO three full size prints
of each Contract Drawing that has been revised to show the "As -Built"
condition of the submarine cable. CONTRACTOR shall utilize the prints
JO/EWO

to show the "As -Built" information including as "As -Built" Material Take
Off (MTO). CONTRACTOR shall produce any additional drawings
required to show all "As -Built" information.
DATE

8.8.2 The above drawings shall be delivered to SAUDI ARAMCO no later than
NO.
REV

30 days after completion of the work described in the Contract.


DISCIPLINE
ENGINEER
8.8.3 Detailed "As -Built" submarine cable information incorporated on the
DATE: Contract Drawings shall consist of, but not be limited to:
PROJECT
ENGINEER
8.8.3.1 As-laid submarine cable route including bearing.
DATE:
CERTIFIED 8.8.3.2 As-laid submarine cable coordinates, minor bend
coordinates, and curve data such as point of curve (PC),
DATE: point of tangent (PT), point of intersection (PI), radius, and
CONSTRUCTION
AGENCY other similar information.

DATE: 8.8.3.3 Actual length of cable installed.


OPERATIONS

8.8.3.4 Location and details of all major obstructions.


DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
25 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.8.3.5 Seabed contours related to LAT at 5 meter intervals.
ENGG CERT

8.8.3.6 Location of existing pipelines, cables, platforms, and other


similar structures.

8.8.3.7 Location (including UTM coordinates and KS station


numbers) and details of crossings and crossing supports.

8.8.3.8 KS chainage and station numbers (including UTM


coordinates).
DESCRIPTION

8.8.3.9 Location, position and details on J-tubes, cable ladders,


supports, armor clamps, splitter boxes, terminations,
splices, and other similar items.

8.8.3.10 Location (including UTM coordinates and KS station


numbers) of spans, and span rectification supports (with
pre-rectification span length and post-rectification span
height).
JO/EWO

8.8.3.11 Location of starts and stops for protective cover, trenching,


or other similar changes along the submarine cable
(including UTM coordinates and KS station numbers).
DATE

Include depth of trench from top of submarine cable to


natural seabed.
NO.
REV

DISCIPLINE
ENGINEER
8.8.3.12 Location of splices or repairs in the cable (including UTM
coordinates and KS station numbers).
DATE:
PROJECT
ENGINEER 8.8.3.13 Submarine cable pre and post installation test records.

DATE: 8.8.3.14 Any other relevant submarine cable "As-Built" data.


CERTIFIED

8.8.4 CONTRACTOR shall "As-Built" Contract Drawing topside details to


DATE: reflect the "As -Built" condition of the submarine cable.
CONSTRUCTION
AGENCY
8.8.5 CONTRACTOR shall supply "As -Built" diver video records for areas of
DATE: the submarine cables that are of particular interest to SAUDI ARAMCO.
OPERATIONS
Videos shall be color and have either real time diver audio, or diving
supervisor audio commentary from the actual dive. Text shall be added
DATE: to the video including SAUDI ARAMCO's name and CONTRACT
CONTROL NUMBER

number, and designating the time, date, name of dive vessel, name and
VERIFICATION

number of the submarine cable, location (UTM and KS) along the
EDSD

submarine cable, dive number, and the purpose of the dive.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
26 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Areas along the submarine cable requiring a video record include J-
tubes, protective covers, starts and stops for trenching, crossings and
ENGG CERT

crossing supports, supports for span correction, areas of repaired


damage and other similar items as described in Section 7.5 of this
Specification. ROV videos shall be supplied where required by the
Scope of Work.

8.8.6 Contract shall not be deemed complete until the information herein has
been submitted and approved by SAUDI ARAMCO. All positions shall
be reported using the UTM system of coordinates.
DESCRIPTION

9.0 DIVING OPERATIONS

9.1 Competent and qualified divers shall be employed to perform underwater


inspection and construction services including repair, salvage work, and the use
of pneumatic and hydraulic tools.

Note: Diver's CV's are to be submitted for SAUDI ARAMCO approval prior to
any work being performed.
JO/EWO

9.2 Divers shall visually inspect the as-laid submarine cables for damage, spans, and
5
obstructions as described in Section 7.5 of this Procedure.
DATE

9.3 CONTRACTOR shall provide an adequate number of general and specialized


divers together with proper surface support and supervis ion personnel to ensure
NO.
REV

safe and timely conduct of diving operations. Personnel and equipment shall
DISCIPLINE
ENGINEER support continuous 24 hour bottom time diving capability during J-tube installation,
and first and second end connection work (J-tube pulls) unless otherwise
DATE: approved by SAUDI ARAMCO.
PROJECT
ENGINEER
5 9.4 Diving operations shall be in accordance with M.I. 1197.001 and Construction
DATE: Procedure DE-119957.
CERTIFIED

10.0 CLEAN-UP
DATE:
CONSTRUCTION
AGENCY
10.1 Before the work is accepted CONTRACTOR shall return all SAUDI ARAMCO
surplus material to a location designated by SAUDI ARAMCO.
DATE:
OPERATIONS
10.2 CONTRACTOR shall not discard, nor allow to be discarded, any construction
materials, scrap or other objects at any location within Saudi Arabian waters.
DATE:
CONTROL NUMBER

10.3 CONTRACTOR shall remove any objects which may intentionally or


VERIFICATION

unintentionally be deposited on the seabed or platforms during the course of the


EDSD

work.
DATE:
BY:

Revision Summary:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

15 April 2002 - Added Section 8.2.12


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

- Added SAES-T-625 to Section 2.2


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
27 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX A
ENGG CERT

SAMPLE
DAILY INSTALLATION REPORT
FOR
__________SUBMARINE CABLE

Date: COMPANY Supt. CONTRACTOR Supt.

CONTRACTOR Equipment:
DESCRIPTION

A) Progress Last 24 Hours:

B) Meanwhile Work Last 24 Hours:

C) Description of Soil Condition:


JO/EWO

D) Comments:
DATE

TIME OF DAY
REPORT ITEM 0H 4H 8H 12H 16H 20H
NO.
REV

1 - Cable Station (Show on Sketch)


DISCIPLINE
ENGINEER 2 - Weather and Sea Data:
• Tide
DATE:
PROJECT
• Wind Direction/Velocity
ENGINEER
• Significant Wave Height
• Wave Direction/Period
DATE:
CERTIFIED
• Water Dept. Feet
• Current, Ft/Sec. (Estimated)
DATE:
• Water Temperature (°F)
CONSTRUCTION
AGENCY
3 - Lay Record
• Barge Position Relative to Design
DATE: • Barge Heading
OPERATIONS • Barge Motion : Heave/Roll
Surge/Pitch
DATE: Sway/Yaw
CONTROL NUMBER

CABLE SKETCH*
VERIFICATION

* INDICATE PRESENT POSITION AND NORTH ORIENTATION


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
28 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX B
ENGG CERT

REMOTE OPERATED VEHICLE PROCEDURE REQUIREMENTS

(*) General

This Appendix identifies the specific items that CONTRACTOR shall address as part of the
required ROV procedure submittal to SAUDI ARAMCO if specified in the Scope of Work.

CONTRACTOR shall provide a complete specification and description to cover the following
ancillary equipment as specified in the Scope of Work.
DESCRIPTION

• Video recording system


• Still color photography
• Potential measurement
• Sub bottom profiling
• Referencing location system
• Manipulator system
• Transponder positioning

JO/EWO

Vehicle tracking
• Side scan sonar system
• Water jetting
DATE

• Soil sampling
NO.
REV

CONTRACTOR shall state the number of personnel required and the type of ROV necessary
DISCIPLINE to undertake the work and to operate the required ancillary equipment. Ancillary equipment
ENGINEER
for any one type of ROV shall be interchangeable. Complete spares and back up parts or
DATE:
systems shall be provided on board the support vessel.
PROJECT
ENGINEER
CONTRACTOR shall provide operating procedures for the ROVs including launch and
recovery, and video tape recording of underwater operations. CONTRACTOR shall also
DATE:
CERTIFIED provide a description of emergency and back-up procedures including but not limited to:

DATE: • Failure of viewing system


CONSTRUCTION
AGENCY
• Failure of vehicle navigation system
• Umbilical snagging
DATE: • Umbilical breaking
OPERATIONS • Power failure

DATE: Performance characteristics shall be provided for the ROV and shall include, but not be
CONTROL NUMBER

limited to:
VERIFICATION
EDSD

• Average expected dive period or ROV utilization.



DATE:

Working capabilities, stating maximum sea state and maximum currents in which the
BY:

vehicle can be launched, operated and recovered.


REVISIONCERTIFICATION


APPROVAL/CERTIFICATION REQUIREMENTS,

Average expected dive time per twenty-four hour day.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
29 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX B
ENGG CERT

REMOTE OPERATED VEHICLE PROCEDURE REQUIREMENTS (Cont.)

In addition, CONTRACTOR shall also state limiting conditions, if any, for operating near and
around structures and for dives in poor visibility or with no natural daylight.

Video

CONTRACTOR shall supply a closed circuit TV camera system and identify in the procedure
DESCRIPTION

details of:

• ROV mounted camera(s) with remote pan/tilt and focus 75 mm to infinity, built-in monitor,
and all spares and back-up.

• Lighting systems for the above, with spares and back-up.

Suitable television cable/umbilical with underwater connectors, near neutral buoyancy, and
proven strength capabilities for underwater use.
JO/EWO

Video recording equipment compatible with survey vessel power supplies, with duplicated
monitors and recorders.
DATE

Video typewriter (VTM) having the ability to input on-line annotation (that is, numerals,
NO.
REV

alphabet characters).
DISCIPLINE
ENGINEER
CONTRACTOR shall provide a schematic layout of the recording and peripheral video
DATE: components, indicating their inter-connections and indicating both audio and visual paths.
PROJECT
ENGINEER

CONTRACTOR shall identify in the procedure the provision of regular summary videos of
DATE: fifteen minutes (approximate) duration that are edited to contain highlights as required by
CERTIFIED
SAUDI ARAMCO. The video tapes shall become the property of SAUDI ARAMCO, and shall
be indexed, referenced and submitted as part of the diving and ROV reports.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall state in the procedure that no video tapes will be erased or disposed
without prior written agreement of SAUDI ARAMCO.
DATE:
OPERATIONS
Videos shall meet the requirements of Sections 7.0 and 8.0 of this Specification.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
30 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX B
ENGG CERT

REMOTE OPERATED VEHICLE PROCEDURE REQUIREMENTS (Cont.)

Still Color Photography

CONTRACTOR shall identify in the procedure details of:

• 35 mm color camera for ROV mounting, with remote pan/tilt and focus, together with all
DESCRIPTION

necessary strobe lights, ancillary equipment, back-up and spares.

• CONTRACTOR shall develop a procedure to ensure that all videos and photographs
shall be recorded with SAUDI ARAMCO's name, title and number of the Contract,
description, scale, date, submarine cable name and location, dive number and position
fix.

• The procedure shall state that all prints and negatives shall become the property of
SAUDI ARAMCO. No prints may be reproduced or published under any circumstances
unless specific permission is granted in writing by SAUDI ARAMCO.
JO/EWO

• CONTRACTOR shall obtain SAUDI ARAMCO permits for all cameras.


NO. DATE
REV

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
31 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX C
ENGG CERT

CONSTRUCTION/INSTALLATION SPREAD PRE-MOBILIZATION VESSEL SURVEY


REQUIREMENTS

A broad scope of items shall be covered by the construction/installation spread pre-


mobilization survey to be undertaken at West Pier, Ras Tanura in Saudi Arabia is listed
below. The survey and inspection scope shall be in accordance with the Contract. Further
5 details on vessels and vessel equipment requirements can be found in SAUDI ARAMCO
Operating Instruction No. 1.519 (including Marine Vessel Specifications and Requirements)
DESCRIPTION

and Procedure DE-119959.

The construction/installation spread pre-mobilization survey shall include but not be limited to:

Vessel

• Structural
• Cracks and Buckles*
• Corrosion*
JO/EWO

• Gantries*
• Storm Anchor(s)

DATE

Sheaves, Fairleads, Idler Rollers*


• Fenders & Bumpers
• Helideck**
NO.
REV

DISCIPLINE • Machinery Systems:


ENGINEER
- Electrical Generation
- Steam
DATE:
PROJECT - Ballasting
ENGINEER
- Fresh Water
- Ventilation
DATE:
CERTIFIED
- Fuel & supply
• Fire Fighting*
DATE: • Emergency Exits*
CONSTRUCTION
AGENCY
• Safety Equipment*
• Sewage treatment disposal system
DATE: • Oil/water separation system
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

* Third party inspection and survey


DATE:
BY:

** Third party and/or SAUDI ARAMCO inspection and survey


REVISIONCERTIFICATION

*** Third party inspection, testing and certification


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
32 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX C
ENGG CERT

CONSTRUCTION/INSTALLATION SPREAD PRE-MOBILIZATION VESSEL SURVEY


REQUIREMENTS
(Cont.)

Submarine Cable Equipment

• Cranes**
• Cable Supports, Rollers, Structures and Guides

DESCRIPTION

Lay Ramp, Chute or Sheave


• Carousel or Turntable
• Idler Rollers and Support Structures
• Welding Equipment (Manual)
• NDE Equipment
• Cable Hauler or Tensioner, and Controls Including Calibration***
• Abandonment & Recovery Hardware***
• Mechanical Trenching System**
• Cable Brake System
JO/EWO

• Cable Grips
• Cable Tension Indicator/Recorder
• Cable Departure Anode Indicator/Recorder
DATE

• Device to record actual length of cable laid


• Cable Floats
NO.
REV

• Underwater Camera
DISCIPLINE
ENGINEER • Electrical Test Equipment
• Cable Jointing Equipment
DATE: • Cable Repair Equipment
PROJECT
ENGINEER

Mooring & Control System


DATE:
CERTIFIED
• Anchors - Gravity and Fluke (special consideration for bottom conditions)
• Wire Cable and Spares

DATE:
CONSTRUCTION
Winches (includes calibration and synchronization of remote units)**
AGENCY
• Instrumentation
• Connections

DATE:
OPERATIONS Special Holding Devices (if used)
• Pendants (cable, buoys & connections)
DATE:
• Horizontal Control
• Closed Circuit TV
CONTROL NUMBER
VERIFICATION

• Damage Prevention Buoys (DPBs)


EDSD

DATE:
BY:

* Third party inspection and survey


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

** Third party and/or SAUDI ARAMCO inspection and survey


*** Third party inspection, testing and certification
(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
33 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX C
ENGG CERT

CONSTRUCTION/INSTALLATION SPREAD PRE-MOBILIZATION VESSEL SURVEY


REQUIREMENTS
(Cont.)

Miscellaneous Equipment

• Route Marker Buoys or Bottom "Sounders"


• Diving System and Equipment**

DESCRIPTION

Survey Systems and Equipment**


• Communications
• Living and Sleeping Quarters
• Mess, Galley, and Catering Facilities
• Laundry

Support Vessels**

• Anchor Handling Tugs



JO/EWO

Survey Vessels
• Supply Boats
• Crew Boats
DATE

• Tow Tugs
• Cargo Barges

NO.
REV

Work Boats
DISCIPLINE
ENGINEER
• Diving Vessels

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:

* Third party inspection and survey


REVISIONCERTIFICATION

** Third party and/or SAUDI ARAMCO inspection and survey


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

*** Third party inspection, testing and certification


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
34 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX D
ENGG CERT

SURVEY PERSONNEL REQUIREMENTS

Senior Surveyors/Party Chief (Quantity Minimum: 1)

• Education - One of the following:

- B.Sc. in Hydrographic Surveying/Engineering


- B.Sc. in Geomatics with hydrographic specialization
DESCRIPTION

- Naval Academy graduate as deck officer with watch-keeping ticket and subsequent
hydrographic specialization

All qualifying education must be in institutions accredited with Federation International De


Geodesie/International Hydrographic Office (FIG/IHO) category "A" certification at the
time of graduation. Professional registration such as Associate of Royal Institution of
Chartered Surveyors (ARICS) or American Congress on Surveying and Mapping (ACSM)
certification is highly desirable.

• Experience - All of the following:


JO/EWO

- Minimum eight years of recent offshore experience of which five years must have
been in offshore oil field construction and maintenance survey support.
DATE

- At least three years as Senior Surveyor or Party Chief. Shall have supervised project
NO.
REV

of same nature as the one proposed within the last two years.
DISCIPLINE
ENGINEER
- Shall have demons trated experience or recent specialized training on all proposed
DATE: equipment and software.
PROJECT
ENGINEER
Surveyor (Quantity As Required, But Minimum: 1)
DATE:
• Education - One of the following:
CERTIFIED

- B.Sc. in Hydrographic Surveying/Engineering


DATE:
- B.Sc. in Geomatics with hydrographic specialization
CONSTRUCTION
AGENCY - B.Sc. followed by Diploma course in Hydrographic Surveying
- Naval training as Petty Officer with hydrographic specialization as Survey Recorder.
DATE:
OPERATIONS All qualifying education must be in institutions accredited with FIG/IHO category "B"
certification at the time of graduation. Professional registration such as Survey
DATE: Technician, ARICS or ACSM certification is highly desirable.
CONTROL NUMBER
VERIFICATION

• Experience - All of the following:


EDSD

- Minimum three years of recent offshore experience in offshore oil field cons truction
DATE:

and maintenance survey support.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

- Shall have demonstrated experience or recent specialized training on all proposed


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

equipment and software.


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
35 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc


Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX D
ENGG CERT

SURVEY PERSONNEL REQUIREMENTS (Cont.)

Electronics Technician (Quantity Minimum: 1)

• Education - One of the following:

- B.Sc. in Electronics Engineering


- B.Sc. in Electrical Engineering
DESCRIPTION

- B.Sc. in Electronics Engineering Technology


- Navy training as Officer or Petty Officer with electronics specialization, preferably in
sonars, navigation and communications equipment.

• Experience - All of the following:

- Minimum five years of recent offshore experience providing electronics support for
offshore oil field hydrographic or seismic survey operations.

- Extensive working experience with PCs and relevant operating systems and familiar
JO/EWO

with computer networking basics.

- Shall have demonstrated experience or recent specialized training on all proposed


DATE

equipment and software.


NO.
REV

DISCIPLINE
ENGINEER

DATE:
PROJECT
ENGINEER

DATE:
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTALLATION OF SUBMARINE CABLES DOC


* A DE-930525
36 5
ARABIAN GULF SAUDI ARABIA JOB #: *

P:\14 Document Control \RDY\Electronic Files\Construction Procedures \DE-930525.doc EDSD/2616-0399.doc