REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
4 03/06/02 30282 REVISED TO INCLUDE F IBER OPTIC DTM DJF RDH
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS, DEC 04 REVISED S. ARAMCO STD. TO THOSE APPLICABLE IN SEP. 04 DRS DRS
5 KML
AGENCY
BY:
PROJECT
C.C. LIANG
A.V. ELVING
R.B. NORTH
ENGINEER
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
D.R. SANDERS
DISCIPLINE
CERTIFIED
July 5, 1998
OPERATIONS
CONSTRUCTION
July 2, 1998
july 2, 1998
July 4, 1998
(DCC) NO. _____________________ DATE:
Saudi Aramco 2616-ENG (03/99)
ARABIAN GULF
PROCEDURE FOR
SAUDI ARABIA
DOC
*
JOB #: *
DWG.TYPE PLANT NO.
A
INDEX
SAUDI ARABIAN OIL COMPANY
OPTIC CABLES
PROCEDURE FOR
DRAWING NO.
DE-930525
PLATFORMS AND PIPELINES
1
of
36
SHT.NO.
CONSTRUCTION OF OFFSHORE
INSTALLATION OF SUBMARINE
5
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT
TABLE OF CONTENTS
1.0 SCOPE 3
5.0 WELDING 8
10.0 CLEAN-UP 27
NO.
REV
DISCIPLINE
ENGINEER APPENDIX A. DAILY INSTALLATION REPORT (SAMPLE) 28
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0 SCOPE
ENGG CERT
This Procedure defines the minimum requirements for installation of submarine cables,
5 and fabrication and installation of associated appurtenances as described herein, in
the Scope of Work, and as shown on the Contract
2.1 The latest revision of the following Construction Procedures shall apply:
DESCRIPTION
DE-119896 Welding
NO.
REV
DATE:
DE-119959 Vessel Conformance Requirements
PROJECT
ENGINEER
2.2 The latest issue of the following SAUDI ARAMCO Engineering Standards (SAES)
and Material System Specifications (SAMSS), and all other references shall
DATE:
CERTIFIED apply:
DATE:
SAES-P-104 Wiring Methods and Materials
CONTROL NUMBER
VERIFICATION
SAES-P-111 Grounding
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-W-013 Welding Requirements for Offshore Structures
ENGG CERT
DISCIPLINE
ENGINEER
--- "Basic Marine Vessel Specifications & Requirements"
Document
DATE:
PROJECT
ENGINEER AHSOPS Hydrographic Survey Operating Procedures and Standards
2.3 The latest edition of the following Industry Codes and Specifications shall apply:
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AWS D1.1 Structural Welding Code
ENGG CERT
3.1 Submarine cables shall be installed, and all associated appurtenances shall be
5 fabricated and installed in accordance with this Procedure, the Scope of Work, the
Contract Drawings, and the Codes, Standards, Specifications and References
listed in Section 2.0 of this Procedure.
(*) 3.2 Any deviation from this Procedure, Scope of Work, or from the Contract Drawings
will not be permitted unless prior written approval is obtained from SAUDI
5 ARAMCO. Responsibility for identifying differences and/or deviations and
obtaining approval shall rest with CONTRACTOR.
JO/EWO
3.4 Components to be installed offshore shall be trial fitted onshore wherever possible
DISCIPLINE
ENGINEER to ensure correct fit.
DATE: 3.5 CONTRACTOR shall provide a cable installation spread (including laying, diving,
PROJECT
ENGINEER survey, testing and other) with component barges and vessels in good working
condition, suitable for the intended work, staffed by fully qualified and competent
DATE: personnel, and approved by SAUDI ARAMCO.
CERTIFIED
3.6 CONTRACTOR shall supply resumes and qualifications, including those of sub-
DATE:
CONSTRUCTION
contractor organizations, for all In-Kingdom and Out-of-Kingdom supervisory and
AGENCY other key personnel, (including divers), to accomplish the WORK, and is to supply
additional resumes and qualifications as may be requested by SAUDI ARAMCO.
DATE:
OPERATIONS
3.7 CONTRACTOR shall carry necessary backup equipment and sufficient spare
parts at all times to ensure that no undue delays are caused to the cable lay
DATE: operation due to equipment breakdown. A list of such equipment and spares
CONTROL NUMBER
VERIFICATION
3.8 CONTRACTOR shall be acquainted with all applicable safety requirements and
DATE:
ensure that both personnel and equipment comply with these requirements at all
BY:
times.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.9 One copy of CONTRACTOR's approved welding procedures and individual
welder's qualifications shall be retained for use at the fabrication site and/or on the
ENGG CERT
3.11 CONTRACTOR shall continuously check and inspect the work in strict
DESCRIPTION
accordance with his approved QA/QC procedures during construction and shall
perform such remedial work or non-operational tests as may be necessary to
ensure the integrity of the work and its performance in accordance with the
Contract Drawings, Scope of Work, and the listed relevant Codes, Standards,
Specifications and References.
3.12 All construction barges are required to have three attendant anchor handling tug
boats (AHTs) while moving into or out of the field, and while moving within the
field. In addition, no material barge shall be left unattended whether in the field or
JO/EWO
at anchorage outside the field. Each material barge shall be attended by its own
tug at all times.
DATE
DATE: 3.13 CONTRACTOR shall move into the work site only after all applicable provisions of
PROJECT
ENGINEER SAUDI ARAMCO Operations Instruction No. 1.519 and the "Basic Marine Vessel
Specifications & Requirements" document have been met. This includes but is
DATE: not limited to the notification period for offshore installation and testing equipment,
CERTIFIED the submittal of all required procedures, a Work Review and Planning Meeting
with CONTRACTOR's representative in attendance, and compliance with General
DATE: Instruction No. 2.100 for Work Permit issuance. These provisions apply to each
CONSTRUCTION
AGENCY separate work site move-in.
DATE: 3.14 All barges and vessels utiliz ing anchors shall have fluke and gravity style anchors
CONTROL NUMBER
decked or secured with a double strap clear of the water in an A-frame during
VERIFICATION
3.15 CONTRACTOR shall provide a daily installation report for the installation work in
DATE:
BY:
5
accordance with Construction Procedure DE-119895 and Appendix A, Daily
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.16 CONTRACTOR shall provide a senior full time English speaking Safety Officer on
all construction barges, diving vessels, and work boats. One Safety Officer per
ENGG CERT
shift is required on construction barges. Safety Officer shall report either to the
Master or Barge Superintendent. Safety Officer shall have full authority to stop
work at any time that he should see fit based on breaches of safety.
Safety Officer shall be familiar with SOLAS regulations, diving procedures and
regulations, life saving operations, fire equipment and breathing apparatus,
helicopter safety, hygiene standards, SAUDI ARAMCO Work Permit
requirements, SAUDI ARAMCO emergency procedures, and all other aspects of
offshore work. Safety Officer shall also be responsible for implementing and
DESCRIPTION
3.17 CONTRACTOR shall be responsible for ensuring that the owners of all non-
CONTRACTOR owned vessels used by CONTRACTOR in the performance of
any part of the work in Saudi Arabian waters have a Port Captain and Port
Engineer on twenty four hour call resident in the Eastern Province of Saudi Arabia
during the course of the work.
JO/EWO
SAUDI ARAMCO.
EDSD
DE-119892.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2 Inspection of Materials
ENGG CERT
All submarine cables and other SAUDI ARAMCO supplied materials shall be
thoroughly examined in the SAUDI ARAMCO staging area by CONTRACTOR for
damage prior to load-out by CONTRACTOR. Any damage or non-conformity
shall be reported to and verified by the on site SAUDI ARAMCO Representative.
5.0 WELDING
5.1 All welding, weld inspection, and other similar welding activities shall be
5
DESCRIPTION
5.2 Internal misalignment (high-low) of J-tube pipe shall not exceed 1/16 inch. API 5L
mill tolerances may exceed this requirement. CONTRACTOR shall align the
pipes so this maximum is not exceeded.
Structural components such as clamps, cable ladders, splitter box supports, and
other similar items to be installed above water level shall be coated using APCS-
DATE
DISCIPLINE
water portion of J-tubes, J-tube guards, and other similar items shall be coated
ENGINEER using APCS-3. No internal coating of J-tubes is required.
DATE:
PROJECT
The inside portion of J-tube clamps where they attach to the J-tube shall be lined
ENGINEER using neoprene in accordance with the Contract Drawings. All components to be
5 coated shall be prepared and coated in accordance with Construction Procedure
DATE:
DE-119889. When transitioning between APCS-3 and APCS-22 on a structural
CERTIFIED
component, APCS-3 shall lap over APCS-22 by a minimum of 75 mm.
DATE:
CONSTRUCTION
6.2 Preparation and Application
AGENCY
6.2.1 Preparation and application of APCS-3 coal tar epoxy coating system
DATE: 5
OPERATIONS
shall be in accordance with Construction Procedures DE-119892 and
DE-119889, SAES-H-100, SAES-H-101, and 09-SAMSS-068, which are
applicable to this coating system.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.2.2 Preparation and application of APCS-22 epoxy coating system shall be
in accordance with Construction Specifications DE-119892 and DE-
ENGG CERT
6.2.3 All coating materials shall be handled and stored in accordance with
5 Construction Procedure DE-119892. Coating materials shall be kept
tightly sealed at all times when not in use, and shall not be opened until
immediately before it is required.
7.1 General
7.1.2 CONTRACTOR shall provide a dive survey vessel for the pre and post
construction surveys meeting the requirements of SAUDI ARAMCO
JO/EWO
5
Operating Instruction No. 1.519, and the "Basic Marine Vessel
Specifications & Requirements" document and Construction Procedure
DATE
DE-119959.
•
DATE:
OPERATIONS Remote Operated Vehicle (ROV) (if required by the Scope of Work)
for post construction survey
•
DATE:
Hand held and diver head mounted video cameras for pre-
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.2 Barge Management
ENGG CERT
7.2.1 General
DATE: (*) 7.2.2.4 CONTRACTOR shall present the proposed primary and
CERTIFIED secondary positioning systems calibration procedures to
SAUDI ARAMCO for approval at least 14 days before
DATE: commencement of work in the field.
CONSTRUCTION
AGENCY
7.2.3 Other Construction/Work Vessels
DATE:
OPERATIONS
All AHTs, dive vessels, diver/survey vessels, survey vessels and other
construction or work vessels shall have the capability to continuously
DATE: 5 position themselves using the same system and requirements
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.2.4 Data Transmission Link
ENGG CERT
7.2.5.1 General
DISCIPLINE
ENGINEER • Actual submarine cable track (in lay mode)
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.3 Pre-Construction Survey
ENGG CERT
DATE: Buoys shall be color coded and so placed and tied as to clearly
CONTROL NUMBER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
All buoys shall be tied directly to pipelines with soft line. For cables,
only every third buoy shall be tied directly to the cable.
ENGG CERT
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.5 Post-Construction Survey
ENGG CERT
7.5.4 CONTRACTOR shall run additional lines at the location of all special
submarine cable features such as starts and stops of protective cover,
DATE
minor bends, existing pipeline and cable crossings, and similar items.
CONTRACTOR shall pay particular attention to any locations where
NO.
REV
the cable spans above the seabed and obtain full details of any such
DISCIPLINE
ENGINEER
location.
DATE: 7.5.5 CONTRACTOR shall obtain a diver video record, with voice overlay,
PROJECT
ENGINEER of special features along the installed submarine cable including J-
tubes, cable fittings (if any), spans, supports, crossings, protective
DATE: cover (for example, grout bags), trenching start and stop locations (if
5
CERTIFIED applicable), and other similar items. Videos shall meet the
requirements of Section 8.10 of this Procedure. All vessels with
DATE: onboard subsea video recording capability shall have the necessary
CONSTRUCTION
AGENCY equipment to add text, edit, add voice-over, and copy videos. Each
submarine cable shall have separate videos.
DATE:
OPERATIONS
7.5.6 CONTRACTOR shall obtain a video record of one side of the installed
submarine cable (including the trench for any trenched portions) using
DATE: an ROV, if required by the Scope of Work. Particular attention shall
CONTROL NUMBER
be paid to all special submarine cable features, spans, and all areas
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.5.7 The ROV (if required by the Scope of Work) to be employed by
CONTRACTOR on the post-construction survey shall, unless
ENGG CERT
7.5.8 The size and performance of the ROV if required by the Scope of
Work shall be as defined in the Scope of Work.
DISCIPLINE
ENGINEER 8.2.1 The direction of submarine cable lay shall be as defined in the Scope
of Work, Contract Drawings, or as agreed by CONTRACTOR with
DATE: SAUDI ARAMCO.
PROJECT
ENGINEER
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.2.4 During installation, the tension exerted on the submarine cable shall
not exceed the values specified in the Scope of Work. At no time
ENGG CERT
8.2.5 Only SAUDI ARAMCO approved cable grips, pulling eyes, and cable
end seals shall be used to handle and install the submarine cables.
8.2.6 CONTRACTOR shall take all necessary steps to ensure that all
submarine cable laying parameters such as cable tension, barge
attitude, barge orientation, barge offset, departure angle, and
departure ramp configuration conform at all times to the procedures
agreed and accepted by SAUDI ARAMCO.
JO/EWO
8.2.7 Any departure from the expected behavior of the submarine cable
during installation as detailed in the procedures shall be investigated
as to its cause, and remedial action taken to the satisfaction of SAUDI
DATE
ARAMCO.
NO.
REV
DATE: 8.2.10 CONTRACTOR shall nominate two persons on each shift who will be
OPERATIONS
responsible for the correct regulation of the cable (hauler or tension
device) and departure angle parameters. Except in an emergency, no
DATE: other person shall make any change in the laying parameters.
CONTROL NUMBER
VERIFICATION
8.2.12 Fiber Optic Cables shall be installed such that 1 – 3% of the total
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.3 Crossings, Span Correction, Cable Anchoring Equipment, and Protective Cover
ENGG CERT
8.3.3 The installation of both crossing supports and the submarine cable
DATE: itself shall be monitored by divers. The divers shall take
CERTIFIED
comprehensive video of the overall operation.
DATE:
CONSTRUCTION
8.3.4 Any height discrepancy between the submarine cable and the
AGENCY crossing supports shall be rectified by inserting grout bags. All
permanent crossing supports shall be installed prior to submarine
DATE:
OPERATIONS
cable testing.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.3.5 Supports to correct (eliminate) spans shall be installed by
CONTRACTOR at SAUDI ARAMCO's direction based on the results
ENGG CERT
Contract Drawings.
submarine cable is at all times above the minimum bend radius for the
DISCIPLINE
ENGINEER
submarine cable as noted in the Scope of Work and Contract
Drawings.
DATE:
PROJECT
ENGINEER 8.3.8 Grout shall consist of Type V sulfate-resistant portland cement in
accordance with the Contract Drawings and SAES-Q-001. Neat or
DATE: neat dry cement may be used at CONTRACTOR's discretion.
CERTIFIED
8.3.9 Grout bags shall be ULO pillow bags with a double flap inlet, or
DATE: equivalent. One sample of CONTRACTOR's proposed bags shall be
CONSTRUCTION
AGENCY submitted to SAUDI ARAMCO for review and approval 14 days prior
to bags being filled and placed, or placed and filled in place.
DATE:
OPERATIONS
8.4 Commencement and Intervention of Lay
DATE: 8.4.1 CONTRACTOR shall not commence submarine cable lay until a
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.4.2 If it becomes necessary to cease normal cable lay operations,
CONTRACTOR shall implement SAUDI ARAMCO approved
ENGG CERT
8.4.3 During the cable laying operations, if the environment is such that the
lay vessel cannot continue the cable laying operation, the laying
vessel and anchoring system shall still be of adequate design so that
the laying vessel can hold its station.
buoys of a different color than that used for existing pipelines and cables
in that particular vicinity shall be attached by a suitable line to the end of
DATE
the submarine cable so that its location can be easily identified during
recovery. CONTRACTOR shall ensure that the buoyed submarine
cable remains stable on the seabed.
NO.
REV
DISCIPLINE
ENGINEER 8.5 Anchor Patterns
DATE: 8.5.1 CONTRACTOR shall provide precise anchor patterns when the
PROJECT
ENGINEER submarine cable lay barge is within 1,200 meters of an existing
structure, and for any anchor position falling within 150 meters of an
DATE: existing cable or pipeline.
CERTIFIED
8.5.2 CONTRACTOR shall show method of anchor running and setting, and
DATE:
CONSTRUCTION
expected wire tensions both at rest and during submarine cable laying.
AGENCY CONTRACTOR shall confirm that the total loss of effectiveness of any
one anchor (running anchors, broken wire, sliding, or other event) does
DATE:
not endanger the submarine cable, and shall set out details of any
OPERATIONS
anchor moving operations where a special anchor pattern to avoid
existing obstructions and structures renders such movements critical.
DATE: Precise anchor patterns shall also be provided when the cable lay barge
CONTROL NUMBER
VERIFICATION
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.5.4 Anchor pattern drawings shall be prepared by CONTRACTOR and
submitted to SAUDI ARAMCO a minimum of six weeks in advance of
ENGG CERT
the scheduled set-up date for review and approval. Anchor patterns
require SAUDI ARAMCO approval prior to commencing set-up.
8.6 Monitoring
8.6.1 CONTRACTOR shall continuously monitor and record all aspects of the
submarine cable installation operation including but not limited to the
following:
DESCRIPTION
8.6.1.1 The cable lay barge track and heading as indicated by the
positioning system.
8.6.1.4 The submarine cable departure angle off of the lay ramp.
5
Procedure DE-119896.
NO.
REV
8.6.1.6 A general daily record of all work carried out on the cable
DISCIPLINE
ENGINEER
lay barge including details of anchor movements, weather
downtime, laying progress, mechanical downtime, and other
DATE: 5 related activities. This information in combination with
PROJECT
ENGINEER Appendix A, Daily Installation Report (Sample), and
Construction Procedure DE-119895 shall be submitted by
DATE: CONTRACTOR to SAUDI ARAMCO.
CERTIFIED
DATE: 8.6.2 CONTRACTOR shall maintain a daily submarine cable laying log
OPERATIONS
detailing total length of submarine cable laid and relevant submarine
cable kilometer station (KS).
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.7 Procedures
ENGG CERT
8.7.1 General
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 8.7.3 Normal Submarine Cable Lay Procedures
ENGG CERT
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(*) 8.7.4 Cable Abandonment/Recovery and Shifting Procedure
ENGG CERT
DISCIPLINE
ENGINEER
(*) 8.7.6 Coating Procedure
DATE: CONTRACTOR shall submit a procedure for shop and field coating
PROJECT
ENGINEER 5 application, inspection, and repair in accordance with Construction
Procedure DE-119889.
DATE:
CERTIFIED (*) 8.7.7 Welding, Welder Qualifications and NDE Procedures
5
accordance with Construction Procedure DE-119896, and
EDSD
SAES-W-013.
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.7.7.3 CONTRACTOR shall provide all operational equipment,
supplies and qualified personnel required to perform the
ENGG CERT
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.7.9 Terminating/Testing Procedures
ENGG CERT
8.8.1 CONTRACTOR shall provide to SAUDI ARAMCO three full size prints
of each Contract Drawing that has been revised to show the "As -Built"
condition of the submarine cable. CONTRACTOR shall utilize the prints
JO/EWO
to show the "As -Built" information including as "As -Built" Material Take
Off (MTO). CONTRACTOR shall produce any additional drawings
required to show all "As -Built" information.
DATE
8.8.2 The above drawings shall be delivered to SAUDI ARAMCO no later than
NO.
REV
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.8.3.5 Seabed contours related to LAT at 5 meter intervals.
ENGG CERT
DISCIPLINE
ENGINEER
8.8.3.12 Location of splices or repairs in the cable (including UTM
coordinates and KS station numbers).
DATE:
PROJECT
ENGINEER 8.8.3.13 Submarine cable pre and post installation test records.
number, and designating the time, date, name of dive vessel, name and
VERIFICATION
number of the submarine cable, location (UTM and KS) along the
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Areas along the submarine cable requiring a video record include J-
tubes, protective covers, starts and stops for trenching, crossings and
ENGG CERT
8.8.6 Contract shall not be deemed complete until the information herein has
been submitted and approved by SAUDI ARAMCO. All positions shall
be reported using the UTM system of coordinates.
DESCRIPTION
Note: Diver's CV's are to be submitted for SAUDI ARAMCO approval prior to
any work being performed.
JO/EWO
9.2 Divers shall visually inspect the as-laid submarine cables for damage, spans, and
5
obstructions as described in Section 7.5 of this Procedure.
DATE
safe and timely conduct of diving operations. Personnel and equipment shall
DISCIPLINE
ENGINEER support continuous 24 hour bottom time diving capability during J-tube installation,
and first and second end connection work (J-tube pulls) unless otherwise
DATE: approved by SAUDI ARAMCO.
PROJECT
ENGINEER
5 9.4 Diving operations shall be in accordance with M.I. 1197.001 and Construction
DATE: Procedure DE-119957.
CERTIFIED
10.0 CLEAN-UP
DATE:
CONSTRUCTION
AGENCY
10.1 Before the work is accepted CONTRACTOR shall return all SAUDI ARAMCO
surplus material to a location designated by SAUDI ARAMCO.
DATE:
OPERATIONS
10.2 CONTRACTOR shall not discard, nor allow to be discarded, any construction
materials, scrap or other objects at any location within Saudi Arabian waters.
DATE:
CONTROL NUMBER
work.
DATE:
BY:
Revision Summary:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX A
ENGG CERT
SAMPLE
DAILY INSTALLATION REPORT
FOR
__________SUBMARINE CABLE
CONTRACTOR Equipment:
DESCRIPTION
D) Comments:
DATE
TIME OF DAY
REPORT ITEM 0H 4H 8H 12H 16H 20H
NO.
REV
CABLE SKETCH*
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX B
ENGG CERT
(*) General
This Appendix identifies the specific items that CONTRACTOR shall address as part of the
required ROV procedure submittal to SAUDI ARAMCO if specified in the Scope of Work.
CONTRACTOR shall provide a complete specification and description to cover the following
ancillary equipment as specified in the Scope of Work.
DESCRIPTION
Vehicle tracking
• Side scan sonar system
• Water jetting
DATE
• Soil sampling
NO.
REV
CONTRACTOR shall state the number of personnel required and the type of ROV necessary
DISCIPLINE to undertake the work and to operate the required ancillary equipment. Ancillary equipment
ENGINEER
for any one type of ROV shall be interchangeable. Complete spares and back up parts or
DATE:
systems shall be provided on board the support vessel.
PROJECT
ENGINEER
CONTRACTOR shall provide operating procedures for the ROVs including launch and
recovery, and video tape recording of underwater operations. CONTRACTOR shall also
DATE:
CERTIFIED provide a description of emergency and back-up procedures including but not limited to:
DATE: Performance characteristics shall be provided for the ROV and shall include, but not be
CONTROL NUMBER
limited to:
VERIFICATION
EDSD
Working capabilities, stating maximum sea state and maximum currents in which the
BY:
•
APPROVAL/CERTIFICATION REQUIREMENTS,
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX B
ENGG CERT
In addition, CONTRACTOR shall also state limiting conditions, if any, for operating near and
around structures and for dives in poor visibility or with no natural daylight.
Video
CONTRACTOR shall supply a closed circuit TV camera system and identify in the procedure
DESCRIPTION
details of:
• ROV mounted camera(s) with remote pan/tilt and focus 75 mm to infinity, built-in monitor,
and all spares and back-up.
Suitable television cable/umbilical with underwater connectors, near neutral buoyancy, and
proven strength capabilities for underwater use.
JO/EWO
Video recording equipment compatible with survey vessel power supplies, with duplicated
monitors and recorders.
DATE
Video typewriter (VTM) having the ability to input on-line annotation (that is, numerals,
NO.
REV
alphabet characters).
DISCIPLINE
ENGINEER
CONTRACTOR shall provide a schematic layout of the recording and peripheral video
DATE: components, indicating their inter-connections and indicating both audio and visual paths.
PROJECT
ENGINEER
CONTRACTOR shall identify in the procedure the provision of regular summary videos of
DATE: fifteen minutes (approximate) duration that are edited to contain highlights as required by
CERTIFIED
SAUDI ARAMCO. The video tapes shall become the property of SAUDI ARAMCO, and shall
be indexed, referenced and submitted as part of the diving and ROV reports.
DATE:
CONSTRUCTION
AGENCY CONTRACTOR shall state in the procedure that no video tapes will be erased or disposed
without prior written agreement of SAUDI ARAMCO.
DATE:
OPERATIONS
Videos shall meet the requirements of Sections 7.0 and 8.0 of this Specification.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX B
ENGG CERT
• 35 mm color camera for ROV mounting, with remote pan/tilt and focus, together with all
DESCRIPTION
• CONTRACTOR shall develop a procedure to ensure that all videos and photographs
shall be recorded with SAUDI ARAMCO's name, title and number of the Contract,
description, scale, date, submarine cable name and location, dive number and position
fix.
• The procedure shall state that all prints and negatives shall become the property of
SAUDI ARAMCO. No prints may be reproduced or published under any circumstances
unless specific permission is granted in writing by SAUDI ARAMCO.
JO/EWO
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX C
ENGG CERT
The construction/installation spread pre-mobilization survey shall include but not be limited to:
Vessel
• Structural
• Cracks and Buckles*
• Corrosion*
JO/EWO
• Gantries*
• Storm Anchor(s)
•
DATE
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX C
ENGG CERT
• Cranes**
• Cable Supports, Rollers, Structures and Guides
•
DESCRIPTION
• Cable Grips
• Cable Tension Indicator/Recorder
• Cable Departure Anode Indicator/Recorder
DATE
• Underwater Camera
DISCIPLINE
ENGINEER • Electrical Test Equipment
• Cable Jointing Equipment
DATE: • Cable Repair Equipment
PROJECT
ENGINEER
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX C
ENGG CERT
Miscellaneous Equipment
Support Vessels**
Survey Vessels
• Supply Boats
• Crew Boats
DATE
• Tow Tugs
• Cargo Barges
•
NO.
REV
Work Boats
DISCIPLINE
ENGINEER
• Diving Vessels
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX D
ENGG CERT
- Naval Academy graduate as deck officer with watch-keeping ticket and subsequent
hydrographic specialization
- Minimum eight years of recent offshore experience of which five years must have
been in offshore oil field construction and maintenance survey support.
DATE
- At least three years as Senior Surveyor or Party Chief. Shall have supervised project
NO.
REV
of same nature as the one proposed within the last two years.
DISCIPLINE
ENGINEER
- Shall have demons trated experience or recent specialized training on all proposed
DATE: equipment and software.
PROJECT
ENGINEER
Surveyor (Quantity As Required, But Minimum: 1)
DATE:
• Education - One of the following:
CERTIFIED
- Minimum three years of recent offshore experience in offshore oil field cons truction
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
APPENDIX D
ENGG CERT
- Minimum five years of recent offshore experience providing electronics support for
offshore oil field hydrographic or seismic survey operations.
- Extensive working experience with PCs and relevant operating systems and familiar
JO/EWO
DISCIPLINE
ENGINEER
DATE:
PROJECT
ENGINEER
DATE:
CERTIFIED
DATE:
CONSTRUCTION
AGENCY
DATE:
OPERATIONS
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PROCEDURE FOR DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION