1. Prepare report on safety
precautions to be observed in
substation for carrying out HV
switching isolating form other
feeding.
2. Draw layout and prepare report
on 11 KV pole mounted
substation earthing .
3 Draw layout and prepare report
&4. on 11 KV plinth mounted
substation earthing.
5. Measure the earth
resistance of 11 KV/0.44 KV
substation and compare
with standard values and
prepare report for
improvment of
earthresistance.
6. Prepare report on the visit
to 220 KV/22KV substation
industrial visit.
7. Prepare visit report of
33/11KV and draw SLD.
8. Perform BDV lest power
transformer oil.
9. Perform specific gravity lest
and measure battery voltage
and prepare maintenance
schedule of battery.
10. Interpret the drawing line
diagram of 132 KV
substation ad list detailed
specification of equipment
used.
11. To prepare a report on
maintance of SF6 circuit
breakers in substation.
12. Use the given firefighting
equipment used in
11KV,33KV,132KV
substation.
13. Prepare maintenance
schedule of GIS substation.