This document contains a list of 13 practical outcomes and assessments for a student enrolled in an electrical engineering program. The practical outcomes include preparing reports on safety precautions for high voltage switching, earthing layouts for 11kV substations, measuring and improving earth resistance, industrial site visits to substations, performing tests on power transformer oil and batteries, interpreting substation diagrams, and preparing maintenance schedules for circuit breakers and gas insulated substations. The student will complete each practical, have their work and performance dated, and receive marks from their assessor.
This document contains a list of 13 practical outcomes and assessments for a student enrolled in an electrical engineering program. The practical outcomes include preparing reports on safety precautions for high voltage switching, earthing layouts for 11kV substations, measuring and improving earth resistance, industrial site visits to substations, performing tests on power transformer oil and batteries, interpreting substation diagrams, and preparing maintenance schedules for circuit breakers and gas insulated substations. The student will complete each practical, have their work and performance dated, and receive marks from their assessor.
This document contains a list of 13 practical outcomes and assessments for a student enrolled in an electrical engineering program. The practical outcomes include preparing reports on safety precautions for high voltage switching, earthing layouts for 11kV substations, measuring and improving earth resistance, industrial site visits to substations, performing tests on power transformer oil and batteries, interpreting substation diagrams, and preparing maintenance schedules for circuit breakers and gas insulated substations. The student will complete each practical, have their work and performance dated, and receive marks from their assessor.
List of Practical’s and Progressive Assessment Sheet
Name of student:
Enrolment No:
Roll No:
Sr. Practical outcome Date of Date of marks sign
performance submission 1. Prepare report on safety precautions to be observed in substation for carrying out HV switching isolating form other feeding. 2. Draw layout and prepare report on 11 KV pole mounted substation earthing . 3 Draw layout and prepare report &4. on 11 KV plinth mounted substation earthing. 5. Measure the earth resistance of 11 KV/0.44 KV substation and compare with standard values and prepare report for improvment of earthresistance. 6. Prepare report on the visit to 220 KV/22KV substation industrial visit. 7. Prepare visit report of 33/11KV and draw SLD. 8. Perform BDV lest power transformer oil. 9. Perform specific gravity lest and measure battery voltage and prepare maintenance schedule of battery. 10. Interpret the drawing line diagram of 132 KV substation ad list detailed specification of equipment used. 11. To prepare a report on maintance of SF6 circuit breakers in substation. 12. Use the given firefighting equipment used in 11KV,33KV,132KV substation. 13. Prepare maintenance schedule of GIS substation.