SCHOOL OF CIVIL ENGINEERING

EAA304/2 – GEOTECHNICAL, HIGHWAY AND TRAFFIC LABORATORY


(2022/2023)

G2

UNCONFINED COMPRESSION TEST

GROUP: 2

GROUP MEMBERS:
NAME MATRIX NUMBER SECTION
AHMAD NAZIRUL MUBIN BIN OSMAN 150259 OBJECTIVE &
INTRODUCTION
DURUVENDRAN A/L BARATHI 152646 RESULT
MUHAMAD SAFARAZ AZIM BIN BAHA 153178 CONCLUSION
MASITA BINTI MOHAMAD NOR 151488 OBSERVATION &
CALCULATION
SARAH ZULAIKHA BINTI SAIFULLIZAN (LEADER) 153800 DISCUSSSION &
REFERENCE

LECTURER: TS. DR. MUHD HARRIS RAMLI & DR. ROSNANI ALKARIMIAH

DATE OF SUBMISSION: 11 APRIL 2023


--------------------------------------------------------------------------------------------------------------------------------------
Declaration of Academic Honesty

Academic honesty or academic integrity is a very important virtue that all students should uphold at
all times.

We declare that the lab report submitted is not plagiarised and is entirely my/our own work, and
that no part of it has been copied from any work produced by other person(s)/ source(s) or provided
by any other student(s).

We understand that issuing a false declaration can result in severe penalties and we are willing to be
penalized if any form of copying found valid.

NAME SIGNATURE
AHMAD NAZIRUL MUBIN BIN OSMAN
DURUVENDRAN A/L BARATHI
MUHAMAD SAFARAZ AZIM BIN BAHA
MASITA BINTI MOHAMAD NOR
SARAH ZULAIKHA BINTI SAIFULLIZAN
CamScanner
CamScanner
CamScanner
Coupues&bn

to deter Te
ucec to ca lculate at w s
an uncontvel Cytnduca) pecrmuen a OT OrtS ma £rwpie owpuebn
test. it tae Nost atten useaq foconque to daeMN
a ort mce Tt on be conpiesec foct auc Cottr the lost oupawal
to ttue tecunques du eOluTn uO hetu. tbw enr, ut tet
T unsurtabie tor cee tam types a cay eort sucl as crack coy, y
SDlrel clay aud ayey sert due to etra tacton af cand
CoUtered m

for turs test, tue coutuTng pueAQ Une O3 Qual to

ttue t tal avo tue total vaT pnpa


o,. Tue urncdvarusd har sthength (u) nepeuctent
a tue Coutu puatsune as (ouy a tue tet 18 ully farateo auc
fully undrared,tunetoe it eaval t ue unoutuecd Coupveeue
Turt
way e expueked ac,

Smce tue
equat to telo we can ootam
hoal Swese as elou
Uraph arapu a (hear engtu agamet No vnal eY

Tota) Ste Wouv'S


3 Cvle at fantsue

6 -0 Nov mal StesS

to u ttue ham avcl


agamet
Meee plottea tte valse a u au Cu a faupte ,4 aua 3
T

Ta ole : tveage value a au aua Cu at Clay aupre


fanpie NO . u Ctn/)
84-39
AS-0
44-06 AT-0

Auerafe 9-37 44.4


in tevnal fuctn Auple

Owtane mTaoe , tue vatue at unouthuod

vatue a auevae cOUoCn at tue vaue

TaveI to Tate (2- -aeeeval Pelatnsunps af ousrtten cy awd n


coutvad Couueeeon ergtu at cioy we Can Coucu ale that t e

clay gaupe tected T a QaMM


conreteney
Taoe 2.4: enev al Peatron (uTps a Cousshncy aud UnContaed Coupvesn
&hengtu af Cays

Consstency
0-5

fott
kuedrum S0-00
trtt 100 -00

Vey stt d00-AO0

Haro

Pre cautns
|- Rate at oadTr applred uould eMam Constant tor al 9Aples
to avord mco nerf tencre m vgluQ CalCulatec Turt way usaTy
aFtect tue oeval esalt tue epeQnt

Fye uct De to te neelle a te ganpe


perpeueuta
accurate eadn Tue rae an be qpped wnQn
RLOACUn tue eut aud ohame te ot acu awple .

3. lay st e oupOCRd peperty dunp MoUId 10 avoTel


uowogeuou SoTt auupe taat Could nalult mpus(euce at

4 Turs expeïneut

af woul d lead to CracLe and ffeunar


evopooon
CamScanner
Leavmng Cengoge ed). C&h
Pgrnaeig Qeotecumeal Prncnest Csoi3). bohan
k &
M., B.Das 3.
suould%0e 2.tue 455ntext
3A ts% Peau t/ then -epe OT
¢angcowpue&(TUe
tue-uncontuecd-
- -oletermTQ- -Com/Cort/ (iorauy
tom Petueu Tbrauy. kle You ont. Expeu
oi f tuheng CoupeTu Uncontuad DetermTNO
tu tn-d)
To Khan,. o-
03) tput Uncontwd-pd}.
date:P (Aeoested CEt334/ tu/rlai/ edu
www.eyut uttp!/ hom! eol Petu CompuDn
Test contned (h.d)
Un
noloy Tecn Unvesty
af Cuaoyan uymern cHOn(onctu fuent Depavt
Peteveuce
CamScanner
CamScanner
CamScanner
CamScanner
SCHOOL OF CIVIL ENGINEERING

EAA304/2 – GEOTECHNICAL, HIGHWAY AND TRAFFIC LABORATORY


(2022/2023)

G3

CONSOLIDATION TEST (OEDOMETER)

GROUP: 2

GROUP MEMBERS:
NAME MATRIX NUMBER SECTION
AHMAD NAZIRUL MUBIN BIN OSMAN 150259 CONCLUSION
DURUVENDRAN A/L BARATHI 152646 DISCUSSION &
REFERENCE
MUHAMAD SAFARAZ AZIM BIN BAHA 153178 OBJECTIVE &
INTRODUCTION
MASITA BINTI MOHAMAD NOR 151488 RESULT
SARAH ZULAIKHA BINTI SAIFULLIZAN (LEADER) 153800 OBSERVATION &
CALCULATION

LECTURER: TS. DR. MUHD HARRIS RAMLI & DR. ROSNANI ALKARIMIAH

DATE OF SUBMISSION: 11 APRIL 2023


--------------------------------------------------------------------------------------------------------------------------------------
Declaration of Academic Honesty

Academic honesty or academic integrity is a very important virtue that all students should uphold at
all times.

We declare that the lab report submitted is not plagiarised and is entirely my/our own work, and
that no part of it has been copied from any work produced by other person(s)/ source(s) or provided
by any other student(s).

We understand that issuing a false declaration can result in severe penalties and we are willing to be
penalized if any form of copying found valid.

NAME SIGNATURE
AHMAD NAZIRUL MUBIN BIN OSMAN
DURUVENDRAN A/L BARATHI
MUHAMAD SAFARAZ AZIM BIN BAHA
MASITA BINTI MOHAMAD NOR
SARAH ZULAIKHA BINTI SAIFULLIZAN
CamScanner
eauple Condron
at taratec
produce tanple Te added water
t 3: une
CouO(Teln
dere. tte toptacel
ou werput
rt d!
true
ccueaed. and ap Tue atopiaceol faupje
rt hgua
Observaton
CamScanner
CamScanner
CamScanner
CamScanner
11.14 Time Rate of Consolidation 397

Table 11.7 Variation of Tv with U

U (%) Tv U (%) Tv U (%) Tv U (%) Tv

0 0 26 0.0531 52 0.212 78 0.529


1 0.00008 27 0.0572 53 0.221 79 0.547
2 0.0003 28 0.0615 54 0.230 80 0.567
3 0.00071 29 0.0660 55 0.239 81 0.588
4 0.00126 30 0.0707 56 0.248 82 0.610
5 0.00196 31 0.0754 57 0.257 83 0.633
6 0.00283 32 0.0803 58 0.267 84 0.658
7 0.00385 33 0.0855 59 0.276 85 0.684
8 0.00502 34 0.0907 60 0.286 86 0.712
9 0.00636 35 0.0962 61 0.297 87 0.742
10 0.00785 36 0.102 62 0.307 88 0.774
11 0.0095 37 0.107 63 0.318 89 0.809
12 0.0113 38 0.113 64 0.329 90 0.848
13 0.0133 39 0.119 65 0.340 91 0.891
14 0.0154 40 0.126 66 0.352 92 0.938
15 0.0177 41 0.132 67 0.364 93 0.993
16 0.0201 42 0.138 68 0.377 94 1.055
17 0.0227 43 0.145 69 0.390 95 1.129
18 0.0254 44 0.152 70 0.403 96 1.219
19 0.0283 45 0.159 71 0.417 97 1.336
20 0.0314 46 0.166 72 0.431 98 1.500

© Cengage Learning 2014


21 0.0346 47 0.173 73 0.446 99 1.781
22 0.0380 48 0.181 74 0.461 100 ⬁
23 0.0415 49 0.188 75 0.477
24 0.0452 50 0.197 76 0.493
25 0.0491 51 0.204 77 0.511

Example 11.7

The time required for 50% consolidation of a 25-mm-thick clay layer (drained at both
top and bottom) in the laboratory is 3 min 15 sec. How long (in days) will it take for
a 2-m-thick clay layer of the same clay in the field under the same pressure increment
to reach 50% consolidation? In the field, sand layers are present at the top and bottom
of the clay layer.
Solution
cv t lab cv t field
T50 ⫽ ⫽
H 2dr1lab2 H 2dr1field2
or
t lab t field

H 2dr1lab2 H 2dr1field2

Copyright 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part.
CamScanner
CamScanner