RENCANA PELASANAAN PEKERJAAN

DATA CENTER TEBET

PROECT PLAN
- PROCUREMENT PLAN
- MAN POWER SCHEDULE
- BUDGETING
SCHEDULE
- ORG-CHART
- PRODUCTION / MANUFACTURING PROCESS
DRAWING
- DESIGN & ENGINEERING
RISK & MITIGATION
DOCUMENTATION & REPORT
MAN POWER SCHEDULE

PO DATE
NO URAIAN MATERIAL DESIGN/ /MANUFACTURER DELIVERY MOS ERECTION & KETERANGAN
DRAWING NAME PLAN INSTALLATION

1 Rak Miner + MDF 18-Oct-21


2 Panel LVMDP 800A 18-Oct-21
3 Panel SDP 200A 18-Oct-21
4 Support Panel LVMDP 18-Oct-21
5 Support Panel SDP 18-Oct-21
6 Kabel NYY 1x240mm (Trafo ke LVMDP) 18-Oct-21
7 Kabel NYY 4x70 (LVMDP ke SDP) 18-Oct-21
8 Kabel NYY 3x2,5mm2 dari SDP ke Stop Kontak (4rak x 3) 18-Oct-21
9 Stop Kontak Schneider 18-Oct-21
10 BCC Grounding 120mm2 +Accessories 18-Oct-21
11 Kabel Ladder W300 + Cover (I length : 3m) 18-Oct-21
Jointing Ladder
Cover Clamp Ladder
12 Suppot Kabel Ladder 18-Oct-21
13 Skun + Vynil 240mm2 18-Oct-21
14 Skun + Vynil 70mm2 18-Oct-21
15 Skun BC 50 , C Clamp. 18-Oct-21
16 Skun BC 120 , C Clamp. 18-Oct-21
No Uraian Jumlah Satuan

1 Panel LVMDP 800A 1


MCCB 3P 800A ABB (1 pcs)
MCCB 3P 200A SIEMENS (4 pcs)
Box Panel Uk. 200x80x80mm (1 unit)
Complete wiring Accessories

2 Panel SDP 200A 4


MCCB 4P 200A, Siemens (1pcs)
MCCB 1P 20A Schneider (30pcs)
Box Panel uk. 60x80x25 (1unit)
Complete wiring Acccessories

3 Support Panel LVMDP 1 pcs


4 Support Panel SDP 4 pcs
5 Jemabatan untuk Cable Ladder dari Kandang ke Ruang Trafo 1 ls
5 Rak Mesin + MDF 4 unit
6 Kabel NYY 1x240mm (Trafo ke LVMDP) 250 m
7 Kabel NYY 4x70 (LVMDP ke SDP) 120 m
8 Kabel NYY 3x2,5mm2 dari SDP ke Stop Kontak (4rak x 3) 680 m
9 Stop Kontak Schneider 120 pcs
10 Kabel Grounding :
- BC 50mm2 (Antar Panel SDP-LVMDP) 70 m
- BC120mm2 (Grounding LVMDP/Peralatan/Bangunan - Tanah) 20 m
- Grounding ROD 5 pcs
- Skun BC 50 , C Clamp. 20 pcs
- Skun BC 120 , C Clamp. 20 pcs
11 Kabel Ladder W600 + Cover length : 3m 6 set
12 Jointing Ladder 36 pcs
13 Cover Clamp Ladder 30 pcs
14 Suppot Kabel Ladder 30 pcs
15 Skun + Vynil 240mm2 27 pcs
16 Skun + Vynil 70mm2 29 pcs

LAIN--LAIN
17 Besi Siku 7x5x5 3 btg

18 Kawat Las LB 2 pack


19 Cable Tray 100 (kabel 4x70, kabel data) 8 btg
20 Lampu Penerangan Kandang incl MCB, Saklar, kabel, dll 2 set

21 Jasa Pembuatan Kabel data


- Connector RJ 45
- Kabel UTP CAT.6

JASA
Instalasi Electrical 1 ls
Test & Commissining 1 ls
Dokumentasi 1 ls
Sesuai Penawaran Harga awal Perubahan Harga
Deviasi
Harga Total Harga Total
Issues
Keterangan

Fabrikasi
Fabrikasi
Fabrikasi Menunggu Infomasi CRDM apakah trafo akan diganti atau tida
Fabrikasi -> Pak Surya
Termasuk kabel ke trafo melalui jembatan penghubung

783,000
EX-Stock PDC +/- 10 pcs 851,000
600,000
2,234,000
Ex-Stock PDC
Ex-Stock PDC

1 set =3m , panjang bagunan 15m

Fabrikasi
EX-Stock PDC
EX-Stock PDC

Fabrikasi Untuk Support Kabel Ladder / Intslasi atas eternit

Ex-Stock PDC
Ex-Stock PDC

CRDM Kabel UTP + Connector scope CRDM


CRDM Kabel UTP + Connector scope CRDM
trafo akan diganti atau tidak

asi atas eternit


PT. PERMATA PRIMA INDONUSA COST CENTER CODE :

FORM -1 : RENCANA KERJA HARIAN


PROYEK DATA CENTER - PULOGADUNG
A. INFORMASI PEKERJAAN

1 HARI / TANGGAL PENGAJUAN :

2 JENIS PEKERJAAN :

3 LOKASI PEKERJAAN :

4 PENGAWAS PEKERJAAN :

5 PENGAWAS K3 :

B DAFTAR PELAKSANA

NO NAMA TANDA TANGAN NO NAMA TANDATANGAN

C RENCANA PELAKSANAAN PEKERJAAN

NO URAIAN PEKERJAAN HAMBATAN KERJA/DETAIL PEKERJAAN/SAFETY ISSUES/ DLL

KODE COST CENTER :


1 PLGD-EM-01 : PEKERJAAN ELEKTRIKAL / MEKANIKAL 3 PLGD-U-01 : PEKERJAAN UMUM
2 PLGD-S-01 : PEKERJAAN SIPIL

DIBUAT OLEH DIKETAHUI OLEH DIPERIKSA OLEH DISETUJUI


PT. PERMATA PRIMA INDONUSA COST CENTER CODE :

FORM -2 : PENCATATAN PENERIMAAN ALAT / MATERIAL


PROYEK DATA CENTER - PULOGADUNG

1 HARI / TANGGAL :

2 JENIS PENGIRIMAN :

3 NAMA PENGIRIM :

A. JENIS ALAT / MATERIAL ( DILAMPIRKAN DENGAN D/O ATAU SURAT JALAN )

NO JENIS ALAT / MATERIAL KEPERLUAN / PERUNTUKAN JUMLAH / KETERANGAN LAINNYA

KODE COST CENTER :


1 PLGD-EM-01 : PEKERJAAN ELEKTRIKAL / MEKANIKAL 3 PLGD-U-01 : PEKERJAAN UMUM
2 PLGD-S-01 : PEKERJAAN SIPIL

DIBUAT OLEH DIKETAHUI OLEH DIPERIKSA OLEH DISETUJUI


PT. PERMATA PRIMA INDONUSA COST CENTER CODE :

FORM -3 : PENGAJUAN PEMBELIAN MATERIAL


PROYEK DATA CENTER - PULOGADUNG

1 HARI / TANGGAL :

2 JENIS PEKERJAAN :

3 RENCANA PEMAKAIAN :

A. JENIS ALAT / MATERIAL Eks - Stock Jumlah :

Pembelian Baru Jumlah :

NO JENIS ALAT / MATERIAL KEPERLUAN / PERUNTUKAN JUMLAH / KETERANGAN LAINNYA

KODE COST CENTER :


1 PLGD-EM-01 : PEKERJAAN ELEKTRIKAL / MEKANIKAL 3 PLGD-U-01 : PEKERJAAN UMUM
2 PLGD-S-01 : PEKERJAAN SIPIL

DIBUAT OLEH DIKETAHUI OLEH DIPERIKSA OLEH DISETUJUI


PT. PERMATA PRIMA INDONUSA COST CENTER CODE :

FORM -4 : PENGAJUAN BIAYA


PROYEK DATA CENTER - CAKUNG

1 HARI / TANGGAL :

NO URAIAN KEPERLUAN JUMLAH TOTAL

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

JUMLAH TOTAL PENGAJUAN

KODE COST CENTER :


1 CKG-EM-01 : PEKERJAAN ELEKTRIKAL / MEKANIKAL 3 CKG-U-01 : PEKERJAAN UMUM
2 CKG-S-01 : PEKERJAAN SIPIL

TRANSFER TUNAI
REKENING PENERIMA

NAMA PENERIMA

DIBUAT OLEH DIKETAHUI OLEH DIPERIKSA OLEH DISETUJUI


PT. PERMATA PRIMA INDONUSA COST CENTER CODE : TBT01

FORM -5 : LOG SHEETS


PROYEK DATA CENTER - TEBET

NO KEJADIAN YANG PERLU DICATAT ANALISA DAN AKIBAT DARI KEJADIAN TSB KETERANGAN

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

Kejadian yang harus dicatat adalah :

1. Instruksi khusus yang di berikan oleh pengelola atau pihak owner

2. Tamu /Alat / Material datang

3. Kejadian penting Lainnya : (Kebakaran, Demo, dll)


SITE WORK TIME SHEET
DOC.TIMESHEETS01/AKME/JAN2022

Customer Name : Purchase Order / WO :

Project : Service Engineer :

WEEK :………………………….
KET
SENIN SELASA RABU KAMIS JUMAT SABTU MINGGU

SERVICE DATE

START
SERVICE
TIME
(Hrs)
FINISH

REGULAR

BILLABLE
HOURS

OVERTIME

CATATAN :

1. Timesheets ini wajib dilampirkan dengan list pekerjaan yang telah dilakukan dan diketahui oleh customer
2. Timesheets dapat menajdi perhitungan absen harian karyawan yang ditugaskan.

1. Signature : . . Company : Date : . .


(Service Engineer)

APPROVAL

2. Signature : . . Company : . . Date : . .

Tile : . .
(Authorized Customer Representative)
DAILY REPORT
CUSTOMER : PROJ. ENGINEER :
PROJECT NO. :
ACTION ( * ) :
CONTACT PERSON : PERSON INCHARGE :
PAGE :
DATE :

SPARE PART(S)/MATERIAL
ITEM QUANTITY DESCRIPTIONS

TIME
DATE DESCRIPTION OF WORK RESULT/STATUS
FROM UNTIL

Service Eng. Authorized Customer's Representative: Catatan

( ) ( )

(*) C - Commissioning CI - Completion/Installation PM - Preventive Maintenance


TS - Trouble Shooting M - Modification CB - Calibrations
T - Training P - Project E - Expertise
I - Inspection R - Repair A - Adaptation
PT. PERMATA PRIMA INDONUSA COST CENTER CODE : CKG-EM-01

FORM -3 : PENGAJUAN PEMBELIAN MATERIAL


PROYEK DATA CENTER - CAKUNG

1 HARI / TANGGAL :

2 JENIS PEKERJAAN :

3 RENCANA PEMAKAIAN :

A. JENIS ALAT / MATERIAL Eks - Stock Jumlah :

Pembelian Baru Jumlah :

NO JENIS ALAT / MATERIAL KEPERLUAN / PERUNTUKAN JUMLAH / KETERANGAN LAINNYA

KODE COST CENTER :


1 CKG-EM-01 : PEKERJAAN ELEKTRIKAL / MEKANIKAL 3 CKG-U-01 : PEKERJAAN UMUM
2 CKG-S-01 : PEKERJAAN SIPIL

DIBUAT OLEH DIKETAHUI OLEH DIPERIKSA OLEH DISETUJUI