1. 1232-5172-П-001.001.000-ИОС7.2-ГЧ-001 As shown Equipment layout at elevation +6,000, +8,000 it is observed that the Inner
3 Coke Drum Placement Coke Drums R-102/1 and R-101/ 2 are not placed in the center of the platform. Please
Equipment layout at elevation +6,000, +8,000 confirm.
2 TK-201 (Slurry basin) 1. 1232-5172-P-001_001_000-IOS7_2-GCH-001-rC05-f05.dwg In the Coke Drum elevation Drawing, 500 mm of slab section shown above the TK-201,
2. Appendix II RFQ however, it is not shown in the GA drawing of TK-201 in the Appendix-II. Kindly confirm.
3 TK-201 Pump Pit Monorail 1. 1232-5172-P-001_001_000-IOS7_2-GCH-001-rC02-f01.dwg Kindly confirm the TK-201 Pump Pit monorail capacity, In GA it shows capacity 5 TON, although
according to the past raferance total weight of single pump is around 19 TONS.