You are on page 1of 1

Contingency Plan

Name of Production: Pop Producers Name: Harvey Gerring Contact Number: 07510 929047

Location / Potential problem Effect on production Control Measure Existing measures


scene
Studio The studio may be used It might delay my I am going to reserve a slot of time I can book the studio for a day that I
at the time I need it. production. where I can use the studio for my need it for a few hours
recording.
Studio Actor may be ill or not It might also delay my I have asked Brian if he could fill in I have a backup actor for this incase.
present at college. production. for Isaac if he was ill. He agreed to Worst comes to worst, I film myself.
this.
Studio I may be ill or not This will definitely delay I will either have to fight through I could book another time or record
present at college. my production. the illness or reschedule my studio elsewhere.
booking/record elsewhere.
Studio The college doesn’t have It might reduce the I could theoretically film with my I could film with a different camera.
any cameras. quality of my production. own camera however this would
look worse.

You might also like