You are on page 1of 38
ATHEE ONSHORE GAS DEVELOPMENT PROJECT - PHASE II PROJECT 1219 MAINTENANCE MANUAL PURCHASE ORDER No. (S640 Yoot 0660 002 009 VENDOR: ViCARB surety: Plas heat Bichanger Volume No: AU. TECHNIP - BECHTEL JOINT VENTURE << es TECHNIP BECHTEL JOINT VENTURE Lo Bed AbNoc PROJECT TITLE: OGD PROJECT PHASE II [VENDOR'S NAME: VICARB DOCUMENT TITLE INSTALLATION AND MAINTENANCE MANUAL [VENDOR'S DOCUMENT NO.: _ VOB-asa97025 IVENDOR'S REVISION NO. c (OGD PROJECT PHASE! ‘Supplier Document Review Es me cemen ewes, C12 tre einen ret ier LO = soenene ®t nt penton ay _ TDESAINTRUENT 1 n/ one LEMA/ID on 7 men fm aac re 70 Seaman. come DODO | COSTS) «| SOPOT Dry [DecumentNe. Unt No. Serato Wateral Sede Sequence Wo Revisor Toy Coe eee) ore Cor3) YRC 000 ($40 VICARB INSTALLATION AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGERS Alfa Laval Vicarb 1 Rue du Rif Tronchard Phone: (33) (0) 4 76 85 50 50 38120 LeFontaniiComilon Fax (33) (0) 476 75 79 09 France BP 200 138522 Saint Egréve Cedex hie Jos INSTALLATION AND MAINTENANCE, MANUAL. Ret doe Re, Drie veo ssn) Tose te cp rosecrrsase n_|#6vicAne lie Cone reeuwr et censuses SUMMARY (GENERAL DESCRIPTION - TERMINOLOGY POSITIONS OF UPSTREAM FLOW FLUIDS INLET AND OUTLET. MARKING OF DIAGONAL FLOW PLATES. : MARKING OF GASKETS ON DIAGONAL FLOW PLATES. SPECIAL PLATES DEFINITION, ‘TYPICAL PASS ARRANGEMENT FOR DIAGONAL FLOW. PLATE MOUNTING. - MANUAL TIGHTENING OF THE PLATE PACK. HYDRAULIC TIGHTENING AND DISASSEMBLY OF THE PLATE PACK. RYDRAULIC TEST AND STARTING UP MAINTENANCE. [REPLACING A GASKET OR A PLATE DETERMINATION TALE, CIRCUITS VOLUME TABLE. Wa appengic 2,38 ashe © | roasee [ensoumse] YAR] nconcm [CEST nrouse | EZ. | meee 3 | exo | cunouange Aone Chast = 1» | ass | Cros Cowon Crome! Fie nae [ven | nae | vex [ve | van sev] pate ISSUED CHECKED BY avenoveD oy | REMARKS INSTALLATION AND MAINTENANCE | na (2? Ree MANUAL pee ae Ate coco rnosecrriase n_ [Ref VICARE rue test /asmer recur Pet censCwomrs epseromonrocuoos 1. GENERAL DESCRIPTION - TERMINOLOGY 1.1, MAJOR COMPONENTS (ce par list detailon GA drawing) ‘+ FIXED and MOBILE HEADS ate made of hi rg, rss aay sel plates ‘+ TOP GUIDE BAR, tached othe fxed head and theft seport Isugpor the plate pack nd mole heat allowing ny istry of exchange fr ramennce ‘+ BOTTOM GUIDE BAR, ees the plats in osm an ners tht they are ene, ‘+ THE RODS ae eveniyspced around the prs fhe exchanger 1 lamp the plate pack Between the Axed aad mob ens Hyrlicsingrstny be sa frightening and sein fe pte 12. Ten ‘Cometon noes are csinate by aera mmber. fr edhe M fr mb ea (os onder, plates eat ech re dlver wh pening zenetion any co th fed fs) Reb doc: vensss9en| INSTALLATION AND MAINTENANCE |e: ©: Das | Tans MANUAL Poe ian Jama dob ocprnosecrrnase [Mt VICARB Er9 Clee Geonr -rrcuwe Ret cievewome —_cyserouna 2. POSITION OF UPSTREAM FLOW FLUIDS INLET AND OUTLET + Ines an cute positons ae defo below. ren 702, rrew| we | ND | Np | FLaNceRAciING | NORM ‘SERVICE Ft [1 | @ [ow] easepeace | ansiniss | STRIPPED waTER NET | 1 | 6 [sow | easep race [| ansimiss | SOUR WATER OUTLET | 1 | 6 [sow] raise sace | aNsimss | sTRIPPED WaTeR OUTLET re] + | 6 [iso | rasseprace | ansupiss | SOUR WATERINLET eM 376103408 s8E1034/0~ S9F103A - E1092, mem] xs | Np | Np | Flanceracine | Non SERVICE [+ | & [som] raiseorace | ANsiBIss | RICHAMINEOUTLET m [1 | & [ison] raweprace | ansumiss | LeANAMNe Mier [1 [@ [ow] xaseprace | Ansimiss | RICHAMINEINLET mi [1 | & [iow] raseprace | ansumiss | LeANAMINEOUTLET INSTALLATION AND MAINTENANCE | a": _ MANUAL pen [amie = oop rnosecrenasen [MVEA mse [esecvammr’——recue (lente —epac oman MARKING OF DIAGONAL FLOW PLATES FINED HEAD. MOBILE HEAD Marking ssen by an obser Making seen by an observer placed in ent of te exchanger Pisce behind the exchanger facing hed ead Fain te mob eat FLUID FLOWS DIAGONAL, — (Pate asembling: see AS BUILT GA devigs) 1+ The plas ae mounted wit eke iin tote fe hed 1+ Thecods ofthe plas ar beled N (North) and (Sout, ‘+The plas ace mambo mth fied head o emi ete comes gst Pa Is asenbled wth te & ‘The festa is mounted with Non tthe tp and hen Sut athe tp aerate ee INSTALLATION AND MAINTENANCE | nev” 0?) MANUAL me SAP _ | Pee cet Comer — Rec emer: crssrosonvecooe2 4. MARKING OF GASKETS DIAGONAL FLOW PLATES, 41, DISPOSITION OF 4 CORNER GASKETS The ft plate eu with spacial 4 comer ptt which ole opening of he pis aed revert Mid psiage betwee te Fined ed andthe ist pla. No fui ows this pace. + Alle oer plates are upped wh snd pts le FIGURES 42, STANDARD GASKETS ORIENTATION “he gases are aliemately ited on one se He on te or, sheer determining even and odd pater econ fir onder nob inthe exhage aually the eowing rl ipo ors ote NE ae 0 (opeaings m3) Ps soted NO and SE (pein in 24) FIGURE? Rét doe: ven-asa03) INSTALLATION AND MAINTENANCE | Rav. Dae | Tansee MANUAL Pee sri ates cosy prosecr nase n [FE ¥ICARP eres = recur Retcewcuvne's _cniserowootnssooor 5, SPECIAL PLATES DEFINITION ‘Asan late bas openings Alle ptr wit sheng are led pei pein the omen athe trek ofthe awn Pes are naed wih hiking fei 8) -EKAMBLES 4 = abankings 2 EN Dblankingr Nord FNO_ = I blaking Nord West 2 FNESO = 2blankings Non I Sanking Sot West FAO 80 aS. oO 9 an | ese | Ao.so | aves | en.reo | ar FIGRE @ [NOTE Special plats steely oo pates DESIGNATION OF THE PLATES Pcs aybe eer reife Reinforcement of pl made ty welling cored sprees ofthe same met a hepa) noth ake rove whet thea gee neath openings ‘The desigaton ofthe enorced pte inte dang omen es fallow Paes r= ans - rene (crap sips). Incelsion withthe data sees, an epring S389 105A het exchange, we te ht CHM rofl is ‘ompesed of CHand CDX promised ee 6) INSTALLATION AND MAINTENANCE | tao") ("5 MANUAL. ae Tous ‘oop prosecr piace n__|R VICARE | Ref encom coiser0sooo19scoorr 6. TYPICAL PASS ARRANGEMENT - DIAGONAL FLOW See appenic 1: pate arrangement draniog N°VIUG-10 4 ITEM S7E 0348 sSE1034/0 39 0348 —s7E1092, See appendix 2: pate arrangement eewing NV2S-410 Ret doe: vensesoren S INSTALLATION AND MAINTENANCE |p" © ) Dae: Tons99 wi MANUAL be: a Edi oop rxovecrenase |" VICAR ern tet Comer recuntP Ret ciewicanemr: _crysrouneovosennen 7. PLATE MOUNTING POSITIONING OF PLATES Pier mate cect tema uniform pla ck nd proper gah seing PLATE ASSEMBLING FIGURES HANGING OF PLATES ON FRAME Phiesare hangin 3 eps (gue 18) 1. Engagement cn uper sis a with pla iped noe sg and towards eof exchanger, 2. Rota fplae do hanging pasion ple il ped towards en of exchanger 3 Rotation ofplt buco forward to eagge owe pie be ‘Themidleigue shows apa arg corel onthe oper side. FA PA PR INcoRRECT ‘conRECT INCORRECT iouRE 6 a INSTALLATION AND MAINTENANCE | fac" ¢°*") ) Date: ingep MANUAL ene ese ‘op rnosecr nase n | FéF VICAR ers tC ‘recuw Ret cenicwome= ——_cpserononosn0or 8. MANUAL TIGHTENING OF THE PLATE PACK, The pate pack is mounted agains he xed bead Each plat is moved lng te upper guide bar and pressed gabe peeing ple The mobile Head is ben pushed into comat with he plate ck, Tightening is ade ote ae. The is bat net rod wl Be chosen fm tp aon. By tightening the ie rods scesiely the pte pack dimension ndkated oe he assembly denwig stall be ‘Nowe ct te mtn ici icon (e133), oie pat wile mag IL "veh new gasket muna paket eae [Abe minimus dmesion te pnes we conc with exch oer, Then he enaing te ol essere art isle and htened onsen eve reste sound the perimeter of he ple pk 9. HYDRAULIC TIGHTENING AND DISASSEMBLY OF THE PLATE PACK (Dever wih goods) TOOUNG Thesing an isssembyof he pe packs scomplished wih an yale panp and elinges wich allow 1 ule and uniform mover of theme bead Refer tip 17 below. FiguRE 17 - —— a sever) “remus Snes. Ret doe: vemssaoen INSTALLATION AND MAINTENANCE | ev" ©! Dee | Tango MANUAL Page 20/8 ati ob coco prosecrenase n [Fé VICAR® rrp) ten / camer “TECHNIP Ret chealCuanr: _epyserosooovnsso002 DISASSEMBLY 4+ Prior dsasembly, mess nd record the te lei ween he ed and bie heads. ‘+ Witha wrench, ooen he hex us (tem) fom the ere (en 0) (N22, 66), 4 Unsere ty hae te pts lem) of X mam creping oth gh ofthe hen eines + sersoake, Pash rds er ©) othe ted ead otha hey protae by X+ ¥ mm, 1+ Mount enya elindr with heros ot om YS mm, nd put he sie ‘Pate i ins ne ere ee ep aka open il an ‘enatighenang of mm, 4+ Ho te eylindes under presare and rove he ode Il 477, whe heir uberis restr ‘han 2 Femove cera erode theme rower ool 2 1 Unsere by hand the rts (tem J of he erode 395.5" by 45am, the as ‘ner of ie rossi loner eg 12 3 when the + Releasethe pes om the des tall looting V5 mm 1+ Repeat above operons il eae poke fly opened 1+ stands forthe yan elnder rave (100 a 150), ‘TIGHTENING ‘+The plate pack is mound agaist he fed head Ech tis moved along the upper guide bar and est gat he preceding ae ‘sal he te rods (tem 0). Tes 4 rds mas protate by X mm om the fed head apron + Moan 4 hyeaae nds, wt odsia on tet (em 0), 4 Mount he hexagonal mats sew hs by hd Pat he mts Jin oct with washers K. Bue thst the fied and bleeds ae paral t wi fm, Putte hy eylners under peste a compres he pl pck iy Y nts, ‘sta he remnng erode) an ter oe an water (Men aK). ‘Retest presse fom hea cyinders and sre tent (em ) of eos em O with wretch sot the ois fhe ender ptm by Ym ‘+ Put he bydruicinders under pressure asin ent he exchange titened toa dimension betwen ‘he maximum and minmom pte pack tices ted on he gen casing dane plate Never exceed Ret doe: venssonas INSTALLATION AND MAINTENANCE | fey MANUAL Dae h Us Fase ase io ogo rrosecr nase _[FEVICARS eros ed ‘recwnr Re celCutomer: coyssrouoanaccuner “Fish ening ee ode witha wrench The fie ad mobile head must be pre 0 am 1a sighe dtet of parm ened mus be comsced by moving th at (em witha wrench + Removethehyérauielndr nd mount thems (em ‘+ Tigmen stig (eprint 15m the mats of theremin tote em ©} (NOTE: we alse wo Ughen he ple pack or wage ped, athe maximan Thing Jnowion ‘net one GA cron + Zana eschanae: the ighaming menion fr sorage 4=8534 mm as mentioned on GA draving + YOO heat exchanger: he ighmig inet fr storage it A~2254 mm as mentioned on GA devin HYDRAULIC TEST AND STARTING UP HYDRAULIC TEST Ate each assy its pecessart efor a alc te othe presse inde onthe name plate Hyde tes ae prfrmed to ee ake lens. cop by op ek can beeline by ning within ‘elimi of be aura alonance pleted on he ne pte A ipa! leaks testo eecive emigre owe clamp the caer ‘The gasket kage wil be ouside whet it happened or trough packet vet Hoes. eer to make the ‘opsation en, oo th po where it happene, ts at posible fr ese Mio ener the oppose et ‘hetothe dsble comer te gasket opening pars, ect fone pei deere Hydrate of one cu (ie, A) enbles detection pte ‘Afole ina pote woul alow leakage beeen cits. Tis sible by water ing in the ope eat (Whe the pate pack is open, th defen plate would be | fhe? whi are conaing te wet Sue ofeveu ‘STARTING UF ‘Ast exchanger shoul be bout co ine prada with he least svete cet being opened frat lower Pressure eter, te Watrhravers may cnse a peanet deeming of pater which woud make thi tization ditt or ven imposible ‘Stat wand op willbe pefomed witht hak Regulin valves wll be equipped wit tapers cen) INSTALLATION AND MAINTENANCE | ha MANUAL Dace ae atti ‘oc prosect PHASE |_| Ref VICARB EPIBIMGS9 tent Cetmer ‘TECHNIE Ret cewlcwiener: _coysérowooornesoon2 11, MAINTENANCE Looren the pln pack ake thee rods of rant the sailed unt he fo, ands the ples apart saat they hang early low ening by brush peered wer When using ih presue wate, the pats have robe aid ato ave damage. 1+ Never use metallic ash which might aut being of erosion ote plates. ‘+ Be eel net damage he ges ene an ene hey ae god bere tihtening he ame (CHEMICAL CLEANING Clearing te plates without dsasembng the exchangers pile, Connect leaning stm onthe bles of the exchanger ad make the stale igi cube neck cet Make sre ofthe god wing of the ue steri, conneton an aces souatiO¥ Pi wits SEFiciOM ONE 1N oR We 7 (Tre MINIMAL FLOMRETE et0 TO 50) Weer To 8 ICED BV orrFeREMTA. 10 Gee He PRESSE ORO reoario8 nicurers SST Pie MT 4 SEFICIO MeTE IN ER 10 ALD OF he OMIM, FLO RATE He TO SO) ‘The manometer allows compare te peste dap wih he one ned when he nslivion wa lean INSTALLATION AND MAINTENANCE i MANUAL. cre op prosecrriase u_|EVICARD cleat Curamer aecuwr rer etendcaramer: —Cryseroqoorossoons 12, REPLACING A GASKET OR A PLATE, na CHANGING a GasKer Remeve he pate fom the heat exchange an remove the ike removal he ake roves iia we hot ‘iran toes the pik poo onthe ack (Clean (1 te pte completely. Any remsiting aces of ald abesve shouldbe removed fom the gasket ‘grooves. One the plats clen, ala ne gee as esrbed under paragraph 4 Then isl he et ‘sora postion (2) The cleaning method i depen one gasket grove dt sesumlton lee, bower it snot easy to defice a acepole dit secant ee. There we reemnend to gle the gasket on beng ret ‘witha lanes lve conpanie with pickled std pshated pte Fo Information, as past af» gasket replacing, a the VICARB fairy, te plas we pte an essere ging ‘Gk sun: ste aac prseiee append (GHANGING a PLATE ‘Contin tpt designation (0d evn) andthe past posion. The eplcng plate shoud have he same shekes, pater, desiguaton the sare ket tel nd poston se iil, LING NEW ‘The umber of pes or heir postion may be changes to make sure or ital cotguaton change (canbe fps). ‘The VICARB teen supor is at your src deen the ew nomena f the pas dug such hangs ‘STORAGE OF SPARE PARTS PLATES. GASKETS: “These par bald be sored intr xg orcad 20% MANUAL ‘oop prosecrruasen_ | VICAR INSTALLATION AND MAINTENANCE Ret doe: Dre) Tans99 p rane Ret Catone Ccoiserosooovnssanes 13, DETERMINATION TABLE 81 TGHTENING waEnciEs TIGHTENING WRENCH DIMENSIONS- nw Danco FHERODS | Tihenig wench se ‘Macnee 20 vio | Se 8 na AVERAGE TIGHTEN! (See cravings) 34, CIRCUITS VOLUME TABLE Ut doc: APPENDIX Ra Dae Iis99 Page PROCEDURE OF HOT GLUING OF PLATES. ‘ogp prosgcrpuase n __|Ré VICARB ae ciewicemmr = peu |e lei cosowminssme APPENDIX 1 SUMMARY PURPOSE AND SCOPE OF APPLICATION 2. MATERIALS USED 3. PROCEDURE. 21. Control before ging 32. Application of gue film 33. Cont during leing 34. Laying ofgaset onthe pate 415. Applicaton of film “THREAD-EZE" 3.6, Plats assembling and clamping on oven frame 3:2. Oven drying 4 FINAL CONTROL Re doc. AppENDOL 4 PROCEDURE OF HOT GLUING OF reo” 4 eS Tong PLATES pas 218 ne ‘ocoprosver pace _ | VCARS ns tet Cee recuse et cence encenreneay 1. BURPOSE AND SCOPE OF APPLICATION This procedure concerns the hot gluing for VIOO & V205 Heat Exchangers with glue ‘ype 1469 and with Hyérogenous Nitnle material gasket for sl types of plate: new or _epaivig plate. It concems neither the 4 comers gasket who are ehieded with glue 847 (VICARB's reference» glue 1236) are subjeced to the cold glue or glueded with hot alae M69 but he ing with gue 837. 12361 “+The glue area mast be clean and dey ‘+ Before ulation, this ple must be ilutd with 10% of sctone and mixed ‘+The shies apply with s litle hand operated pomp, or a KREMLIN": aie pump (2 ‘yuh an be sed forthe lung on st) ‘+ After the plus application, leave the glu to dry during 3 minutes, put the gasket on the gle, and press witha wooden hammer or carrying roller ‘+ Finally leave the gue to Gy 1 hour (mini) atte epen ar, before wing Process forgankt giving wth plu 1469: Refer to §9 2. MATERIAL USED Lay the gaskets manually on a working ible covered with a stainless tel sheet which poets the plates ready for hung Glue is kept in 9 can of 20 titers and dstibuted by the high pressure pumps ‘manufactured by KREMLIN. Each pump can soppy the gli for two working poss ‘The pasting of gaskets groove is operated bya difser gun equipped witha lat nozzie adapted to the groove length of plates. tent Catone 3a, 3a. a3, PROCEDURE OF HOT GLUING OF PLATES ee” Ref VICARE ‘0G PROJECT PHASE TecHNIP et, enone {coisero10901n6cn002 CONTROLS BEFORE GLUING Before starting oglu the plies, check “The bath of glue is signed othe ja (se type 1469, Ref. EC 1469 of 3M / see datasheet appendix ‘The date of reception - sea batch whose reception dati inferior o2 month, The appearance f lve. = Thebatch of gaskets ie assigned to he job, Check the marking and he quantity of gaskets, APPLICATION OF GLUE FILM. = By using diffuser gun, apply «thin and regular cost of glu tothe pte groove, (alue 1469), ATTENTION! donot apply the gle in an ring area CONTROL DURING GLUING During the plate gluing check + The cleaning state ofthe gasket groove, I necessary, wipe with & non lf clean cloth with aeetone The thicknes of gle shouldbe regular eet doe: aPeeNDI.Y PROCEDURE OF HOT GLUING OF fre 40 ) PLATES. ag at eS ‘ocn prosecr ase n__|R8 VICARE seu etn ene ae Ret cestCasonar {coser0sooinn02 34. GASKETLAYING Putte gasket inthe grove ‘Check the position, should Be Pat. Pres sligily by hand stick the gasket closely in lngthwise and evacuate the sir ‘bubbles between the wu land he gasket 3S. APPLICATION OF OIL FILM "THREAD-EZE" Afr seting the suse, ply 9 thin oil fn *THREAD-EZE* manufactured by ‘Chemscarch with brush on the superioe face af gasket. This operation, esentil 10 voi the ashet wing on the supporting fae ofthe ajncet pate (te able 1 [36 PREPARATION FOR OVEN DRYING = A ovendame (ee appendix S) can be consid of diferent profile of plates. ixig of pits COX and CH. . ‘The plates are pled wp ply onthe ovenfame for oven dying. Do nt exceed ATTENTION ! The assembled plates onthe overran for oven dying shoulé be ofthe same parity odd plates or even pss). = For tanping, the operator clamps moderately the upper deck to Mate the plates pack. After sight checking the pack Mates, pes he plates to the denon Indicted in tale 2 9 obtain a set peterson ‘Check the clan dimension andthe parallelism ofthe press plate with rule oa PROCEDURE OF HOT GLUING OF fi” PLATES ae = se Ana ot OGD PROJECT PHASE, [Rat VICAR ‘rPoseas {cient TECHNIP Ret eben Catomer €DIS61040001/06601002 37. OVENDRYING Put the oven inte polymerization furnace Heat the furnace at 150°C, Tolerance 0/4208 Ince the char paper ito the care ecorder at contol the temperature andthe polymerization tie of gh ‘Setthe holding tne for about 6 hours and stp the ing Leave the test frame inthe race for 6 7 hur Av the end of polymeriation ime, open the furice door ard leave the plates pach ‘0 coal down Slosly and progressively When plates are suffcent coe! Sumace for assembling bout $0 70°C, withdraw the ples from the 4 FINAL CONTROL When witheawing om the arnace ‘Check the chart and record the cated plats batch reference and the number af assigament ‘Check thar there is no ew or incident daring the treatment time, ‘Check te ue appearance. The exceeding gue should be bright beige in color After the cling if the plates ae under room temperate, sample plate and est the adherence by hand Take the gasket between the thumb andthe forefinger and check that the gasket is not hive by tension. Repeat the sme cont at Wo oF hee parts of plate IF the gasket presents a ple fire, repeat the same contol on ane or te other plates. Incase of failure the batch of plates will be subject ofthe non-more oes ae eee Pertomance Characters: MTR eure orn so SSacees 333 TEER ows Bs Facey = PERT ES wea pn tv ey Be $Sega moegue Fe Ste Sion SUPT Tn 3 Soe" “ anal SETS en ane pom mmm ee se LE eens eames HSS EEMi ey Seems ice =o ieee Sirens Orla emer Se Wega mens oe sein tanree BE aes Piet Serer smog net = Eevgereae Eonar Ch ee ———————————— —— ‘Sore Sohne 8 pony Aare WSF oft or opin tage te Sach Weld VE Eon AINE ‘Bina scoce ace une see oo etn cr ss poh rane our Su Aven, Cole Slat ance operant pesaate nara ub a ret uncriba storage crash Precautionary Information: Fess con aot Sy et Snr pacar tarari Pecct informa sure ed Bon a ye os ores secant Ey cecn. canrRe Cf. .. —< — ¥ sense 15:50 portant Notice To Purchaser: ta rome deraerecatnenre sony ceation sain tc sc cutie react pov cctv Neat ‘ray om ro proaue Selor cng ues tak Sournne he tbs Oe pecie Re anaes eas Hea, tlt Bata Shoot or SATRRTRS REY Pore STS INO Operon 155 » x Y sm Sebdtch-Grip 847 Liquid Adhesive 4 atresia nigh Seong tet Eseedaghenve Roe Product Description river fo meas ‘Stes ec Lepenca s.a Eee sees 5/8 Upied Nr Ssperes Norenber 1993 ‘47 aahacve swt une Physical Properties Tae Re Salvent amare — Flash Point ore Specie Seavey t Vaeoa aa toca ve (essen pm) Performance Canara ore Characteristics Speed of pully Ne eroectntoe epee (etext menoe e40r%e) | Somminn Vatu avon s07 » s é ¥ Performance (Characteristics Nietorepenteton pupeoe se? Date: March 1956 47 Lig Adesive Oil resistance (outst mths emtag Canvas pos samples Srevared 72 hoe at Tine wT Tea Temperate Vato ane 2anour in 10 Heat Resistance Secu or hae Eressenoue 706. A year tiai pte n batwean carves and (20 st rte © 4013 sseemaly i Fine IE Test Temperate Vanes aT ‘hour I we. 109 ‘Gulde Line Falewng ela values threned ns cases Peal Seangth | — Overlap Shear Time at24°¢ | Test Temperature |" CanvasiSes! ‘Strength a [aaNem)_| irae (Pa 2caye : weak - ees 49 See Drying Time Ve , Dae: March 1956 B47 Ligud Adhere Storage Conditions Ste pom bea 6 Stages, Directions for Use Surface Preparation: Drying Ti ‘Solvent Reactivation ‘Surfaces must beclean, dy Open tines ene surface aw ashesve oy prstrefometorgeey” ipiacnis eto. Gonna one forte erases mrad eer tlone Aplin eptowon renter ype rover and Strela ssing —ryng me depends on Sols he Senshi Apoiya tin ven cautte temperate, uray, at guar mane, esi Gnearbotsavaces by owe aneporsty cf ene are kee cle fe ron comer tom ‘Do, ated sera her spreading reo ‘Goat bth saes Petoressnceitgves ‘rats seg a peri [Srger open teeta onda overage: Approsmateytanemre tor edu sh coat Sppeaton (025mm ry en Porous Surtice: Very absorb rstorls Soa Song wale ahosre ‘Siw or peasy tao. Non Porous Surtoe ‘lo shes toy ult Ictacy but dees nt ans wrenouched. Jen ‘Bernat Senco. Te pedvetin be bonds Essen maybe heat urea ob Bond Seong, Cleanup: Ercrs aanesve maybe removed wn St Boker a" or nau: Comer ‘ihe ng sever (Sean he ersertn hat ‘ste pessutone ae heen Reactivation sear may be ster Feaetatad up oe monhs ‘ter pate. Heat Reactivation feomlctely ot suraree Esa at nov, pss, or tnceriamae wt 6 580. Allowance must be made ertnear har ‘feough mating pos the ‘eho i Enough pressure soul be Sess Sig Fstg Surases may be preceated upto aaye a advnce of empte bong. Foore ota supeir Eatin ft ca x Sie > & Date March 1956 € ttt adese aah and atey aN era Wey Fenn Fear ae iomaton eta ay Seymore poe nay fom het. Ke aay eye Contac: {fom souces ef gnion nee mmedatey wn Ineudng pt lane let fete ar Sak ‘pata, Nosmotng Keep yest sore ‘baat cated. rol ye conn ‘Skin contact Keep out ofeach ot hiren, enact tne Toueaigy Deparent at sreckt Feaa once ons) ‘ce, Se vera ince to V2O5/¥100 HEAT EXCHANGER ORTING FAME Jel at "oy Ss resigur wae tot tow | = : sea ah bcm Esch OM ine Fn Se ora Vio0-41777 7 mT NATE TE ‘ViO0 HEAT EJCKINGER DRYING FRAME UPPER FRE nee ss | Vigd-a1778 [A

You might also like