MOYALE WATER SUPPLY PROJECT

BILL No. 5: CONSTRUCTION OF 1000 m3 SERVICE RESERVIOR

Item Description Unit Quantity Unit Price Total Price

5.1 Earth Work


Clearing the top soil and unwanted material to a depth
5.1.1 m2 333.7 0.0 0.0
of 200 mm
Bulk excavation in the reservoir compound to reduce
5.1.2 m3 443.3 0.0 0.0
level in normal soil to a depth of 55cm
5.1.3 Ditto but in hard rock formation m3 147.8 0.0 0.0
Cart away all excavated material, deposit to appropriate
5.1.4 m3 657.8 0.0 0.0
distance not exceeding 1 km
Provide and fill with suitable selected granular material
5.1.5 m3 401.3 80.0 32,107.2
around the reservoir
Provide and fill hard core with hard basaltic or
equivalent stone, well compacted and blinded with
5.1.6 m2 259.9 250.0 64,967.5
crushed stone to a finished thickness of 25 cm under
the reservoir and valve chamber
5.2 Concrete and Masonary Work

50mm thick lean concrete with mix ratio (1:3:6) under


5.2.1 m2 259.9 800.0 14,552.7
the reservoir base slab and valve chamber

Reinforced concrete type C-30 filled into form work


5.2.2
and vibrated around reinforced bar in Reservior

5.2.3 Base slab m3 82.3 800.0 65,816.0


5.2.4 Wall and parapet m3 80.7 800.0 64,544.0
5.2.5 Column m3 8.4 800.0 6,712.0
5.2.6 Top slab m3 56.8 800.0 45,400.0
5.3 Provide and fix formwork for reservoir
5.3.1 Base slab m2 16.0 250.0 4,007.5
5.3.2 Wall m2 603.2 250.0 150,797.5
5.3.3 Column and parapet m2 50.8 250.0 12,710.0
5.3.4 Top slab m2 243.0 250.0 60,752.5

Provide, cut, bend and fix in position reinforced steel


5.4 bar. All according to structural drawing. Price
should include tying wires

5.4.1 Diameter 8 mm plain bar kg 830.0 7.0 5,810.2


5.4.2 Diameter 10 mm deformed bar kg 2,948.9 7.0 20,642.2
5.4.3 Diameter 12 mm deformed bar kg 13,849.5 7.0 96,946.4
5.4.4 Diameter 14 mm deformed bar kg 6,742.1 7.0 47,194.6
5.4.5 Diameter 16mm deformed bar kg 10,112.4 7.0 70,787.0
5.4.6 Diameter 18 mm deformed bar kg 694.9 7.0 4,864.2

Reinforced concrete type C-25 filled into form work


5.4.7 m3 35.0 800.0 28,024.0
and vibrated around reinforced bar for valve chamber

5.5 Provide and fix formwork for valve chamber to

5.5.1 Base slab m2 7.1 250.0 1,762.5


5.5.2 Wall m2 80.6 250.0 20,140.0
5.5.3 Top slab m2 24.8 250.0 6,205.0

Provide, cut, bend and fix in position reinforced steel


5.6 bar. All according to structural drawing. Price
should include tying wires

5.6.1 Diameter 10 mm deformed bar kg 555.3 7.0 3,887.1


5.6.2 Diameter 12 mm deformed bar kg 2,183.2 7.0 15,282.1
5.6.3 Diameter 14 mm deformed bar kg 666.5 7.0 4,665.4
5.7 Accesssories and Finishing 0.0
Provide and apply 50mm cement screed to the reservoir
5.7.1 m2 511.7 80.0 40,932.8
floor and roof slab

Provide and apply 3 coats of plaster to internal walls,


5.7.2 m2 768.4 80.0 61,470.4
columns and to embedded part of external wall surface

5.7.3 Rendering external wall m2 448.9 80.0 35,915.2

Provided and install access internal and external hatches


5.7.4 constructed out of 25 mm dia GS pipe and hooked to LS 1.0 0.0 0.0
the wall as per the drawing; including safety cages

Provide and install water stops made of natural or


5.7.5 synthetic rubber or elastometric plastic compound with m 109.0 0.0 0.0
basic risen

Provide and fix 6 mm sheet metal access cover with


5.7.6 No 2.0 0.0 0.0
latch and lock for valve chamber and reservoir

Provide and apply two coats of bituminous asphalt over


5.7.7 the plastered surface of the embedded part of the m2 381.7 0.0 0.0
reservoir

Provide and place single brick layer cover to protect the


5.7.8 m2 54.4 0.0 0.0
asphalt coat from the backfill material

Total Construction for 1000m3 Reservoir 986,896


MOYALE WATER SUPPLY PROJECT
BILL No. 5: CONSTRUCTION OF 1000 m3 SERVICE RESERVIOR

Item Description Unit Quantity Unit Price Total Price

5.1 Earth Work


Clearing the top soil and unwanted material to a depth
5.1.1 m2 0.0 0.0
of 200 mm
Bulk excavation in the reservoir compound to reduce
5.1.2 m3 0.0 0.0
level in normal soil to a depth of 55cm
5.1.3 Ditto but in hard rock formation m3 0.0 0.0
Cart away all excavated material, deposit to appropriate
5.1.4 m3 0.0 0.0
distance not exceeding 1 km
Provide and fill with suitable selected granular material
5.1.5 m3 80.0 0.0
around the reservoir
Provide and fill hard core with hard basaltic or
equivalent stone, well compacted and blinded with
5.1.6 m2 259.9 250.0 64,967.5
crushed stone to a finished thickness of 25 cm under
the reservoir and valve chamber
5.2 Concrete and Masonary Work

50mm thick lean concrete with mix ratio (1:3:6) under


5.2.1 m2 18.2 800.0 14,552.7
the reservoir base slab and valve chamber

Reinforced concrete type C-30 filled into form work


5.2.2
and vibrated around reinforced bar in Reservior

5.2.3 Base slab m3 800.0 0.0


5.2.4 Wall and parapet m3 800.0 0.0
5.2.5 Column m3 800.0 0.0
5.2.6 Top slab m3 800.0 0.0
5.3 Provide and fix formwork for reservoir
5.3.1 Base slab m2 250.0 0.0
5.3.2 Wall m2 250.0 0.0
5.3.3 Column and parapet m2 250.0 0.0
5.3.4 Top slab m2 250.0 0.0

Provide, cut, bend and fix in position reinforced steel


5.4 bar. All according to structural drawing. Price
should include tying wires

5.4.1 plain bar kg 7.0 0.0

Reinforced concrete type C-25 filled into form work


5.4.7 m3 800.0 0.0
and vibrated around reinforced bar for valve chamber

5.5 Provide and fix formwork for valve chamber to

5.5.1 Base slab m2 250.0 0.0


5.5.2 Wall m2 250.0 0.0
5.5.3 Top slab m2 250.0 0.0
Provide, cut, bend and fix in position reinforced steel
5.6 bar. All according to structural drawing. Price
should include tying wires

5.6.1 Diameter 10 mm deformed bar kg 7.0 0.0


5.6.2 Diameter 12 mm deformed bar kg 7.0 0.0
5.6.3 Diameter 14 mm deformed bar kg 7.0 0.0
5.7 Accesssories and Finishing 0.0
Provide and apply 50mm cement screed to the reservoir
5.7.1 m2 80.0 0.0
floor and roof slab

Provide and apply 3 coats of plaster to internal walls,


5.7.2 m2 80.0 0.0
columns and to embedded part of external wall surface

5.7.3 Rendering external wall m2 80.0 0.0

Provided and install access internal and external hatches


5.7.4 constructed out of 25 mm dia GS pipe and hooked to LS 0.0 0.0
the wall as per the drawing; including safety cages

Provide and install water stops made of natural or


5.7.5 synthetic rubber or elastometric plastic compound with m 0.0 0.0
basic risen

Provide and fix 6 mm sheet metal access cover with


5.7.6 No 0.0 0.0
latch and lock for valve chamber and reservoir

Provide and apply two coats of bituminous asphalt over


5.7.7 the plastered surface of the embedded part of the m2 0.0 0.0
reservoir

Provide and place single brick layer cover to protect the


5.7.8 m2 0.0 0.0
asphalt coat from the backfill material

Total Construction for 1000m3 Reservoir 79,520