A - 120 64.29 3 63
B A 290 155.36 6 150
C A 250 133.93 4 132
D B 40 21.43 3 21
E C 30 16.07 2 16
F D,E 220 117.86 5 115
B D
A F
C E
(6) (7) (8)
Actual Rate of Time per activity Elapsed time between start on first and
Construction per week (days) last "Panel Pracetak"
(U) = (g/G)*30 (T) = M / (8*Q) (S) = ((n-1)*7)/u