GRADASI CAMPURAN AGREGAT HOT-BIN


Tanggal Pengujian : 4 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Jenis Material : Hot Bin I (0/05)


Berat Berat Material Uji 1 (Gram) : 1624.3 Berat Berat Material Uji 2 (Gram) : 1646.4

Tertahan Kumulatif Tertahan Kumulatif Rata 2

UKURAN Masing 2 Berat Masing 2 Berat %


Keterangan
Saringan Saringan Tertahan % % Saringan Tertahan % % Lolos

(Gram) (Gram) Tertahan Lolos (Gram) (Gram) Tertahan Lolos

MM INCH

38.1 1½" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

25.4 1" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

19.05 3/4" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

12.7 1/2" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

9.5 3/8" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

4.76 # 4. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

2.38 # 8. 277.40 277.40 17.08 82.92 306.60 306.60 18.62 81.38 82.15

1.19 # 16. 411.70 689.10 42.42 57.58 380.70 687.30 41.75 58.25 57.91

0.59 # 30. 258.30 947.40 58.33 41.67 262.50 949.80 57.69 42.31 41.99

0.279 # 50. 172.00 1119.40 68.92 31.08 185.30 1135.10 68.94 31.06 31.07

0.149 # 100. 191.00 1310.40 80.67 19.33 190.90 1326.00 80.54 19.46 19.39

0.074 # 200. 131.60 1442.00 88.78 11.22 124.20 1450.20 88.08 11.92 11.57

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

GRADASI CAMPURAN AGREGAT HOT-BIN


Tanggal Pengujian : 4 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Jenis Material : Hot Bin II (5/10)


Berat Berat Material Uji 1 (Gram) : 1268.7 Berat Berat Material Uji 2 (Gram) : 1308.5

Tertahan Kumulatif Tertahan Kumulatif Rata 2

UKURAN Masing 2 Berat Masing 2 Berat %


Keterangan
Saringan Saringan Tertahan % % Saringan Tertahan % % Lolos

(Gram) (Gram) Tertahan Lolos (Gram) (Gram) Tertahan Lolos

MM INCH

38.1 1½" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

25.4 1" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

19.05 3/4" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

12.7 1/2" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

9.5 3/8" 0.00 0.00 0.00 100.00 3.30 3.30 0.25 99.75 99.87

4.76 # 4. 645.50 645.50 50.88 49.12 675.40 678.70 51.87 48.13 48.63

2.38 # 8. 600.20 1245.70 98.19 1.81 612.30 1287.60 98.40 1.60 1.71

1.19 # 16. 11.20 1256.90 99.07 0.93 12.60 1300.20 99.37 0.63 0.78

0.59 # 30. 0.90 1257.80 99.14 0.86 0.90 1301.10 99.43 0.57 0.71

0.279 # 50. 0.00 1257.80 99.14 0.86 0.00 1301.10 99.43 0.57 0.71

0.149 # 100. 0.00 1257.80 99.14 0.86 0.00 1301.10 99.43 0.57 0.71

0.074 # 200. 0.00 1257.80 99.14 0.86 0.00 1301.10 99.43 0.57 0.71

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

GRADASI CAMPURAN AGREGAT HOT-BIN


Tanggal Pengujian : 4 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Jenis Material : Hot Bin III (10/19)


Berat Berat Material Uji 1 (Gram) : 1418.0 Berat Berat Material Uji 2 (Gram) : 1341.6

Tertahan Kumulatif Tertahan Kumulatif Rata 2

UKURAN Masing 2 Berat Masing 2 Berat %


Keterangan
Saringan Saringan Tertahan % % Saringan Tertahan % % Lolos

(Gram) (Gram) Tertahan Lolos (Gram) (Gram) Tertahan Lolos

MM INCH

38.1 1½" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

25.4 1" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

19.05 3/4" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

12.7 1/2" 412.40 412.40 29.08 70.92 342.70 342.70 25.54 74.46 72.69

9.5 3/8" 654.20 1066.60 75.22 24.78 654.20 996.90 74.31 25.69 25.24

4.76 # 4. 161.00 1227.60 86.57 13.43 191.80 1188.70 88.60 11.40 12.41

2.38 # 8. 0.50 1228.10 86.61 13.39 0.30 1189.00 88.63 11.37 12.38

1.19 # 16. - - - - - - - - -

0.59 # 30. - - - - - - - - -

0.279 # 50. - - - - - - - - -

0.149 # 100. - - - - - - - - -

0.074 # 200. - - - - - - - - -

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

GRADASI CAMPURAN AGREGAT HOT-BIN


Tanggal Pengujian : 4 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Jenis Material : Filler (Semen)


Berat Berat Material Uji 1 (Gram) : 473.3 Berat Berat Material Uji 2 (Gram) : 449.2

Tertahan Kumulatif Tertahan Kumulatif Rata 2

UKURAN Masing 2 Berat Masing 2 Berat %


Keterangan
Saringan Saringan Tertahan % % Saringan Tertahan % % Lolos

(Gram) (Gram) Tertahan Lolos (Gram) (Gram) Tertahan Lolos

MM INCH

38.1 1½" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

25.4 1" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

19.05 3/4" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

12.7 1/2" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

9.5 3/8" 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

4.76 # 4. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

2.38 # 8. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

1.19 # 16. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

0.59 # 30. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

0.279 # 50. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

0.149 # 100. 0.00 0.00 0.00 100.00 0.00 0.00 0.00 100.00 100.00

0.074 # 200. 21.70 21.70 4.58 95.42 18.90 18.90 4.21 95.79 95.60

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

COMBINE GRADING AGGREGATE


Tanggal Pengujian : 4 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

SIEVE HOT BIN III HOT BIN II HOT BIN I FILLER


TOTAL BATASAN
SIZE
25.0% 38.0% 35.0% 2.0%
2" 100.00 25.00 100.00 38.00 100.00 35.00 100.00 2.00 100.00 100

1½" 100.00 25.00 100.00 38.00 100.00 35.00 100.00 2.00 100.00 100

1" 100.00 25.00 100.00 38.00 100.00 35.00 100.00 2.00 100.00 100

3/4" 100.00 25.00 100.00 38.00 100.00 35.00 100.00 2.00 100.00 100

1/2" 72.69 18.17 100.00 38.00 100.00 35.00 100.00 2.00 93.17 90 - 100

3/8" 25.24 6.31 99.87 37.95 100.00 35.00 100.00 2.00 81.26 77 - 90

# 4. 12.41 3.10 48.63 18.48 100.00 35.00 100.00 2.00 58.58 53 - 69

# 8. 12.38 3.10 1.71 0.65 82.15 28.75 100.00 2.00 34.50 33 - 53

# 16. 0.00 0.00 0.78 0.30 57.91 20.27 100.00 2.00 22.57 21 - 40

# 30. 0.00 0.00 0.71 0.27 41.99 14.70 100.00 2.00 16.97 14 - 30

# 50. 0.00 0.00 0.00 0.00 31.07 10.87 100.00 2.00 12.87 9 - 22

# 100. 0.00 0.00 0.00 0.00 19.39 6.79 100.00 2.00 8.79 6 - 15

# 200. 0.00 0.00 0.00 0.00 11.57 4.05 95.60 1.91 5.96 4-9

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

CHART COMBINED GRADING

Tanggal Pengujian : 4 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING
PERCENT PASSING

200 50 30 16 8 4 3/8" 1/2" 3/4"


100.0 2

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0
0.0 100.0
10.0

0.0 SIEVE SIZE


8.3 8.3 8.3 4
15.5 15.5 15.5

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

EKSTRAKSI ASPAL MODIFIKASI


DENGAN ALAT REFLUG
Tanggal Pengujian : 06 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : Aspal Pen 60/70 Konsultan : PT. CATRASENA ENGINERING

NO I II
A Berat Aspal Pen 60/70 Gram 140.7
B Berat Filter.1 sebelum Gram 6.8
C Berat Filter.1 sesudah Gram 6.8
D Berat mineral C-B Gram 0
E Berat Filter.2 sebelum Gram 7.1
F Berat Filter.2 sesudah Gram 7.1
G Berat mineral F-E Gram 0
H Total berat mineral D+G Gram 0.0
I Berat Aspal A-H Gram 140.7
J Kadar mineral H / A x 100 % 0.00
K Kadar Aspal I / A x 100 % 100.00
Kadar mineral 0.00
Rata-rata
Kadar aspal 100.00

REMAKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SPECIFIC GRAVITY AND ABSORPTION

Tanggal Pengujian : 06 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Jenis Material : Hot Bin II (5/10) Jenis Material : Hot Bin III (10/19)

Nomor Urut Benda Uji I II Nomor Urut Benda Uji I II


Berat Benda Uji Kering Oven - Kering Udara (Gram ) A 4890 4705 Berat Benda Uji Kering Oven - Kering Udara (Gram ) A 6971 7245
Berat Benda Uji Kering Permuk. Jenuh (SSD) (Gram ) B 4980 4792 Berat Benda Uji Kering Permuk. Jenuh (SSD) (Gram ) B 7095 7374
Berat benda uji di Dalam air (Gram ) C 3071 2954 Berat Benda Uji di Dalam Air (Gram ) C 4418 4588
A 2.562 2.560 A 2.604 2.601
Bulk Specific Gravity ( oven dry ) Bulk Specific Gravity ( oven dry )
B-C B-C
Rata 2 2.561 Rata 2 2.602
B 2.609 2.607 B 2.650 2.647
Bulk Specific Gravity ( SSD ) Bulk Specific Gravity ( SSD )
B-C B-C
Rata 2 2.608 Rata 2 2.649
A 2.688 2.687 A 2.731 2.727
Apparent Specific Gravity Apparent Specific Gravity
A-C A-C
Rata 2 2.688 Rata 2 2.729
(B - A) 100 1.840 1.849 (B - A)100 1.779 1.781
Absorption ( % ) A
Absorption ( % ) A
Rata 2 1.845 Rata 2 1.780

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SPECIFIC GRAVITY AND ABSORPTION

Date of Test 0 Kontraktor 0


Tipe of Mix 0 Konsultan 0

Kind Of Material : Hot Bin III Kind Of Material :

NO.OF SAMPLE I II NO.OF SAMPLE I II


Berat Benda Kering Permuk. Jenuh (SSD) (Gram) 500 500 500 Berat Benda Kering Permuk. Jenuh (SSD) (Gram) 500 500 500
Berat Benda Uji Kering Oven (Gram) A 491.4 491.3 Berat Benda Uji Kering Oven (Gram) A 491.5 491.6
Berat Piknometer diisi air (25°C) (Gram) B 1296.5 1296.5 Berat Piknometer diisi air (25°C) (Gram) B 1297.9 1297.9
Berat Pik. + Benda Uji (SSD) + Air (25°C) (Gram) C 1603.7 1603.9 Berat Pik. + Benda Uji (SSD) + Air (25°C) (Gram) C 1602.8 1602.9
A 2.549 2.551 A 2.519 2.521
Bulk Specific Gravity ( oven dry ) (B+500-C)
Bulk Specific Gravity ( oven dry ) (B+500-C)
Average 2.550 Average 2.520
500 ' 2.593 2.596 500 ' 2.563 2.564
Bulk Specific Gravity ( SSD ) (B+500-C)
Bulk Specific Gravity ( SSD ) (B+500-C)
Average 2.595 Average 2.563
A 2.668 2.672 A 2.634 2.635
Apparent Specific Gravity Apparent Specific Gravity
(B+A-C) (B+A-C)
Average 2.670 Average 2.634
(500-A)100 1.750 1.771 (500-A)100 1.729 1.709
Absorption ( % ) A
Absorption ( % ) A
Average 1.760 Average 1.719

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

SULEMAN, ST IDA LESTARI, ST DADANG KOERNIAWAN


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SPECIFIC GRAVITY AND ABSORPTION

Tanggal Pengujian : 06 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Jenis Material : Hot Bin I (0/05) Jenis Material : Filler (Semen)

NO.OF SAMPLE I II NO.OF SAMPLE I II


Berat Benda Kering Permuk. Jenuh (SSD) (Gram) 500 500 500 Berat Benda Kering Permuk. Jenuh (SSD) (Gram) 200 200 200

Berat Benda Uji Kering Oven (Gram) A 490.4 490.2 Berat Benda Uji Kering Oven (Gram) A 200 200

Berat Piknometer diisi air (25°C) (Gram) B 1296.5 1296.9 Berat Piknometer diisi air (25°C) (Gram) B 125.6 127.1

Berat Pik. + Benda Uji (SSD) + Air (25°C) (Gram) C 1603.5 1603.8 Berat Pik. + Benda Uji (SSD) + Air (25°C) (Gram) C 262.2 263.5

A 2.541 2.539 A 3.155 3.145


Bulk Specific Gravity ( oven dry ) Bulk Specific Gravity ( oven dry )
(B+500-C) (B+200-C)
Rata 2 2.540 Rata 2 3.150

500 ' 2.591 2.589 200 3.155 3.145


Bulk Specific Gravity ( SSD ) Bulk Specific Gravity ( SSD )
(B+500-C) (B+200-C)
Rata 2 2.590 Rata 2 3.150

A 2.674 2.674 A 3.155 3.145


Apparent Specific Gravity Apparent Specific Gravity
(B+A-C) (B+A-C)
Average 2.674 Rata 2 3.150

(500-A)100 1.958 1.999 (200-A)100


Absorption ( % ) Absorption ( % )
A A
Rata 2 1.978 Rata 2

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

THEORETICAL SPECIFIC GRAVITY

Tanggal Pengujian : 06 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

% Of Specific Gravity Factor


No Aggregate
Fraction Bulk Apparent Bulk Apparent
A B C D E=B/C F=B/D
1 Hot Bin I (0/05) 35.00 2.540 2.674 13.781 13.088
2 Hot Bin II (5/10) 38.00 2.561 2.688 14.840 14.139
3 Hot Bin III (10/19) 25.00 2.602 2.729 9.607 9.162
4 Filler (Semen) 2.00 3.150 3.150 0.635 0.635

TOTAL 100.00 38.863 37.024

I Bulk Specific Gravity total Agg : = 2.573 Gr / Cm³

II Apparent Specific Gravity Total Agg : = 2.701 Gr / Cm³

III Effective Specific Gravity Total Agg : = 2.637 Gr / Cm³

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

Ukuran Ayakan Combin Surface


Fuller Daerah Larangan Titik Kontrol Faktor Surface Area
ASTM mm Grading Area
min max A B C=AxB

1½" 37.5 100.00


1" 25 100.00
3/4" 19 100 100.0 100.0 100.00 1 X 0.41 0.41
1/2" 12.5 82.8 90.0 100.0 93.17
3/8" 9.5 73.2 77.0 90.0 81.26
#4 4.75 53.6 39.1 39.1 53.0 69.0 58.58 X 0.41 0.240
#8 2.36 39.1 25.6 31.6 33.0 53.0 34.50 X 0.82 0.283
# 16 1.18 28.6 19.1 23.1 21.0 40.0 22.57 X 1.64 0.370
# 30 0.6 21.1 15.5 15.5 14.0 30.0 16.97 X 2.87 0.487
# 50 0.3 15.5 9.0 22.0 12.87 X 6.14 0.790
# 100 0.15 11.3 6.0 15.0 8.79 X 12.29 1.080
# 200 0.075 8.3 4.0 9.0 5.96 X 32.77 1.954

Total : 5.614

CA = 77.4 Perkiraan kadar aspal = ( 0.035 x 77.4 )+( 0.045 x 28.5 )+( 0.18 x 6.0 )+ 0.7
FA = 28.5 = 5.767
FF = 6.0
Konstanta = 0.7 ( 5.767 - 0.970 )x 1000
Bitument Thickness Film =
Absorption = 0.970 ( 5.614 x 1.03 )x( 100 - 5.767 )
Sp.Gr Bitument = 1.030
Mineral = 0.00 = 8.80 micron
Aspal Minyak = 100.00
Asbuton = 1
Aspal Minyak = 1.000
Mineral = 0.000 Lolos saringan #200 = 5.962 + 0.000 = 5.962

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Tanggal Pengujian : 22 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Aspal Modif JAP-57 : 4.500 %

No Nomor Benda Uji I II


A Berat Labu + Benda Uji Gram 1265.6 1284.9
B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 653.4 672.7
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2946.8 2957.9
F Volume Benda Uji (C+D)-E Gram 266.1 274.3
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.455 2.452
J Berat Jenis Terkoreksi IxH Gram/cc 2.454 2.450
K
L Rata - rata Gram/cc 2.452

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Tanggal Pengujian : 22 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Aspal Modif JAP-57 : 5.000 %

No Nomor Benda Uji I II


A Berat Labu + Benda Uji Gram 1341.4 1334.9
B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 729.2 722.7
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2990.1 2986.2
F Volume Benda Uji (C+D)-E Gram 298.6 296.0
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.442 2.442
J Berat Jenis Terkoreksi IxH Gram/cc 2.440 2.440
K
L Rata - rata Gram/cc 2.440

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Date of Test : 22 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Tipe of Mix : AC L Konsultan : PT. CATRASENA ENGINERING

Aspal Modif JAP-57 : 5.500 %

No Nomor Benda Uji I II


A Berat Labu + Benda Uji Gram 1302.3 1316.6
B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 690.1 704.4
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2965.3 2974.1
F Volume Benda Uji (C+D)-E Gram 284.3 289.8
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.427 2.431
J Berat Jenis Terkoreksi IxH Gram/cc 2.425 2.429
K
L Rata - rata Gram/cc 2.427

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Tanggal Pengujian : 22 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Aspal Modif JAP-57 : 6.000 %

No Nomor Benda Uji I II


A Berat Labu + Benda Uji Gram 1312.3 1339.5
B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 700.1 727.3
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2969.5 2985.6
F Volume Benda Uji (C+D)-E Gram 290.1 301.2
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.413 2.415
J Berat Jenis Terkoreksi IxH Gram/cc 2.411 2.413
K
L Rata - rata Gram/cc 2.412

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Tanggal Pengujian : 22 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Aspal Modif JAP-57 : 6.500 %

No Nomor Benda Uji I II


A Berat Labu + Benda Uji Gram 1287.8 1298.5
B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 675.6 686.3
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2953.4 2959.8
F Volume Benda Uji (C+D)-E Gram 281.7 286.0
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.398 2.400
J Berat Jenis Terkoreksi IxH Gram/cc 2.396 2.398
K
L Rata - rata Gram/cc 2.397

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD

Tanggal Pengujian : 24 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Kadar Bitumen As. Modif JAP-57 : 100.00 % Kadar Mineral As. Modif JAP-57 : 0.00 %
Angka Penetrasi Aspal : - Kalibrasi Proving Ring : 14.238 Bulk Sp.Gr U : 2.573 Temperature : 155 oC
Berat Jenis As. Pen 60/70 : 1.030 Surface Area S : 5.614 Effective Sp Gr V : 2.637 Compaction : 75 Blows

Bitumen Kadar Penyerapan Aspal BJ Berat ( Gram ) Rongga Rongga Rongga Stability Kelelahan Hasil Bitument
Ekstrak Aspal Aspal Terhadap Effektif Maks. Isi BJ Bluk Dalam Terhadap Terhadap Di Plastis Bagi Film
No.
Aspal Modif Total Campuran Total Campuran Di Udara Di Dalam Kering Benda Campuran Campuran Agregat Aspal Di Baca Sesuaikan Marshall Thickness
JAP-57 (%) Campuran Air Permukaan Uji (%) (%) (%) (mm) (Kg/mm)
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U

100. X B - (100-B)C GMM LAB LAB LAB H - G F (E-J)100 100 - (100-B)J (L-K)100 LAB LAB LAB O (B-C)*1000
GMM 100 I E U L P (S*X)*(100-B)

1 4.500 4.5 0.720 3.812 2.452 1195.6 685.0 1205.3 520.3 2.298 44 626 2.60
2 1197.3 686.5 1206.7 520.2 2.302 46 655 2.80
3 1194.8 683.9 1204.6 520.7 2.295 41 584 2.40
Average 2.298 6.28 14.71 57.32 622 2.60 239.1 6.84
1 5.000 5.0 0.811 4.229 2.440 1196.2 684.9 1203.5 518.6 2.307 86 1224 3.10
2 1198.0 685.9 1205.5 519.6 2.306 84 1196 3.00
3 1195.5 683.7 1202.9 519.2 2.303 81 1153 2.60
Average 2.305 5.53 14.90 62.89 1191 2.90 410.8 7.62
1 5.500 5.5 0.889 4.660 2.427 1194.9 683.3 1200.7 517.4 2.309 95 1353 2.80
2 1196.2 685.0 1201.9 516.9 2.314 101 1438 3.30
3 1195.7 683.9 1201.0 517.1 2.312 99 1410 2.90
Average 2.312 4.74 15.09 68.58 1400 3.00 466.7 8.44
Speck 3.0 - 5.0 Min 15 Min 65 Min 1000 2-4 Min 300 Min 8
.
REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD

Tanggal Pengujian : 24 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Kadar Bitumen As. Modif JAP-57 : 100.00 % Kadar Mineral As. Modif JAP-57 : 0.00 %
Angka Penetrasi Aspal : - Kalibrasi Proving Ring : 14.238 Bulk Sp.Gr U : 2.573 Temperature : 155 oC
Berat Jenis As. Pen 60/70 : 1.030 Surface Area S : 5.614 Effective Sp Gr V : 2.637 Compaction : 75 Blows

Bitumen Kadar Penyerapan Aspal BJ Berat ( Gram ) Rongga Rongga Rongga Stability Kelelahan Hasil Bitument
Ekstrak Aspal Aspal Terhadap Effektif Maks. Isi BJ Bluk Dalam Terhadap Terhadap Di Plastis Bagi Film
No.
Aspal Modif Total Campuran Total Campuran Di Udara Di Dalam Kering Benda Campuran Campuran Agregat Aspal Di Baca Sesuaikan Marshall Thickness
JAP-57 (%) Campuran Air Permukaan Uji (%) (%) (%) (mm) (Kg/mm)
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U
100. X B - (100 - B)C GMM LAB LAB LAB H - G F (E-J)100 100 - (100-B)J (L-K)100 LAB LAB LAB O (B-C)*100
GMM 100 I E U L P (S*X)*(100-B)
1 6.000 6.0 0.925 5.131 2.412 1195.9 683.5 1199.6 516.1 2.317 97 1381 3.30
2 1196.3 685.0 1199.8 514.8 2.324 101 1438 3.50
3 1195.4 682.8 1199.0 516.2 2.316 97 1381 3.10
Average 2.319 3.86 15.29 74.74 1400 3.30 424.3 9.34
1 6.500 6.5 0.957 5.605 2.397 1197.4 686.3 1199.7 513.4 2.332 87 1239 3.80
2 1194.9 683.9 1197.6 513.7 2.326 82 1168 3.40
3 1195.1 684.8 1198.1 513.3 2.328 84 1196 3.60
Average 2.329 2.84 15.38 81.50 1201 3.60 333.5 10.25
1 7.000 7.0 1.094 5.983 2.388 1197.4 688.4 1199.7 511.3 2.342 55 783 4.40
2 1194.9 686.4 1197.6 511.2 2.337 51 726 3.80
3 1195.1 687.5 1198.1 510.6 2.341 54 769 4.10
Average 2.340 2.01 15.43 86.97 759 4.10 185.2 10.98
Speck 3.0 - 5.0 Min 15 Min 65 Min 1000 2-4 Min 300 Min 8

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

CURVE MARSHALL TEST


8 Air Void ( % ) Void Filled ( % ) 16 Void Mineral Aggregat ( % )
100
7 90 15.5
6
80
5 15
70
4
3 60 14.5
2 50
1 40 14
4.5 5 5.5 6 6.5 7 4.5 5 5.5 6 6.5 7 4.5 5 5.5 6 6.5 7

1500 Stabillity Marshall ( Kg ) Flow ( mm ) Quotient Marshall ( Kg/mm )


5.00 700
1400
4.00 600
1300
500
1200 3.00 400
1100
2.00 300
1000 200
900 1.00 100
4.5 5 5.5 6 6.5 7 4.5 5 5.5 6 6.5 7 4.5 5 5.5 6 6.5 7

BITUMEN FILM
PRD
SETABILTY
Asphalt Content :
FLOW
VMA
QUOTIEN 5.800 % 5.8 %
VOIDFILE
AIRVOID

4.5 5 5. 6 6.5 7

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD


Tanggal Pengujian : 30 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Kadar Bitumen As. Modif JAP-57 : 100.00 % Kadar Mineral As. Modif JAP-57 : 0.00 %
Angka Penetrasi Aspal : - Kalibrasi Proving Ring : 14.238 Bulk Sp.Gr U : 2.573 Temperature : 155 oC
Berat Jenis As. Pen 60/70 : 1.030 Surface Area S : 5.614 Effective Sp Gr V : 2.637 Compaction : 400 Blows

Bitumen Kadar Penyerapan Aspal BJ Berat ( Gram ) Rongga Rongga Rongga Stability Kelelahan Hasil Bitument
Ekstrak Aspal Aspal Terhadap Effektif Maks. Isi BJ Bluk Dalam Terhadap Terhadap Di Plastis Bagi Film
No.
Aspal Modif Total Campuran Total Campuran Di Udara Di Dalam Kering Benda Campuran Campuran Agregat Aspal Di Baca Sesuaikan Marshall Thickness
JAP-57 (%) Campuran Air Permukaan Uji (%) (%) (%) (mm) (Kg/mm)
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U
100. X B-(100-B)C GMM LAB LAB LAB H - G F (E-J)100 100 - (100-B)J (L-K)100 LAB LAB LAB O (B-C)*100
GMM 100 I E U L P (S*X)*(100-B)
1 5.500 5.5 0.889 4.660 2.427 1196.8 688.3 1200.6 512.3 2.336
2 1196.4 687.7 1200.1 512.4 2.335
3 1194.7 686.0 1198.0 512.0 2.333
Average 2.335 3.80 14.25 73.33
1 6.000 6.0 0.925 5.131 2.412 1195.8 686.9 1198.5 511.6 2.337
2 1197.3 688.3 1199.5 511.2 2.342
3 1196.1 687.3 1198.6 511.3 2.339
Average 2.340 3.00 14.53 79.33
1 6.500 6.5 0.957 5.605 2.397 1194.8 686.3 1196.5 510.2 2.342
2 1197.5 688.6 1198.9 510.3 2.347
3 1195.3 687.3 1197.2 509.9 2.344
Average 2.344 2.20 14.82 85.13
Speck Min.2.0
REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Tanggal Pengujian : 31 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Aspal Modif JAP-57 : 5.800 %

No Nomor Benda Uji I II


A Berat Labu + Benda Uji Gram 1295.8 1321.2
B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 683.6 709.0
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2960.2 2975.5
F Volume Benda Uji (C+D)-E Gram 282.9 293.0
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.416 2.420
J Berat Jenis Terkoreksi IxH Gram/cc 2.414 2.418
K
L Rata - rata Gram/cc 2.416

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD

Tanggal Pengujian : 31 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Kadar Bitumen As. Modif JAP-57 : 100.00 % Kadar Mineral As. Modif JAP-57 : 0.00 %
Angka Penetrasi Aspal : - Kalibrasi Proving Ring : 14.238 Bulk Sp.Gr U : 2.573 Temperature : 155 oC
Berat Jenis As. Pen 60/70 : 1.030 Surface Area S 5.614 Effective Sp Gr V : 2.637 Compaction : 75 Blows

Bitumen Kadar Penyerapan Aspal BJ Berat ( Gram ) Rongga Rongga Rongga Stability Kelelahan Hasil Bitument
Ekstrak Aspal Aspal Terhadap Effektif Maks. Isi BJ Bluk Dalam Terhadap Terhadap Di Plastis Bagi Film
No.
Aspal Modif Total Campuran Total Campuran Di Udara Di Dalam Kering Benda Campuran Campuran Agregat Aspal Di Baca Sesuaikan Marshall Thickness
JAP-57 (%) Campuran Air Permukaan Uji (%) (%) (%) (mm) (Kg/mm)
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U
100. X B - (100-B)C GMM LAB LAB LAB H - G F (E-J)100 100 - (100-B)J (L-K)100 LAB LAB LAB O (B-C)*100
GMM 100 I E U L P (S*X)*(100-B)
1 5.800 5.8 0.877 4.974 2.416 1194.9 684.2 1200.2 516.0 2.316 97 1381 3.00
2 1196.3 685.6 1201.6 516.0 2.318 101 1438 3.40
3 1197.0 686.0 1202.7 516.7 2.317 99 1410 3.20
Average 2.317 4.11 15.18 72.94 1410 3.20 440.5 9.04
1 5.800 5.8 0.877 4.974 2.416 1197.7 686.7 1203.0 516.3 2.320 90 1281 3.30
2 1195.8 684.3 1201.4 517.1 2.313 92 1310 3.50
3 1195.2 684.0 1200.7 516.7 2.313 93 1324 3.40
Average 2.315 4.18 15.25 72.58 1305 3.40 383.9 9.04

Stabilitas Sisa 60 ºC / 24 hours = ( 1305 / 1410 ) x 100 = 92.59 %


Min. 90 %

Speck 3.0 - 5.0 Min 15 Min 65 Min 1000 2-4 Min 300 Min 8

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD

Tanggal Pengujian : 31 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX


Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Kadar Bitumen As. Modif JAP-57 : 100.00 % Kadar Mineral As. Modif JAP-57 : 0.00 %
Angka Penetrasi Aspal : - Kalibrasi Proving Ring : 14.238 Bulk Sp.Gr U : 2.573 Temperature : 155 oC
Berat Jenis As. Pen 60/70 : 1.030 Surface Area S : 5.614 Effective Sp Gr V : 2.637 Compaction : 400 Blows

Bitumen Kadar Penyerapan Aspal BJ Berat ( Gram ) Rongga Rongga Rongga Stability Kelelahan Hasil Bitument
Ekstrak Aspal Aspal Terhadap Effektif Maks. Isi BJ Bluk Dalam Terhadap Terhadap Di Plastis Bagi Film
No.
Aspal Modif Total Campuran Total Campuran Di Udara Di Dalam Kering Benda Campuran Campuran Agregat Aspal Di Baca Sesuaikan Marshall Thickness
JAP-57 (%) Campuran Air Permukaan Uji (%) (%) (%) (mm) (Kg/mm)
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U B-
100. X (100-B)C GMM LAB LAB LAB H - G F (E-J)100 100 - (100-B)J (L-K)100 LAB LAB LAB O (B-C)*100
GMM 100 I E U L P (S*X)*(100-B)
1 5.800 5.8 0.877 4.974 2.416 1197.0 688.8 1200.7 511.9 2.338
2 1194.8 686.4 1198.1 511.7 2.335
3 1196.4 688.0 1200.1 512.1 2.336
2.337 3.30 14.46 77.21

PERCENTASE REFUSAL DENSITY

Speck Min 2.0


REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SIEVE ANALYS AGGREGATE


Date of Test 0 Kontraktor 0
Tipe of Mix 0 Konsultan 0

Kind Of Material : Mineral As. Buton Kind Of Material : Mineral As. Buton

Weight : 423.8 Gram Weight : 396.8 Gram Weight : 0.0 Gram Weight : 0 Gram

SIEVE CUMULATIVE CUMULATIVE Average CUMULATIVE CUMULATIVE Average

SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS

1½" 100
1" 100
3/4" 100
1/2" 100
3/8" 100
# 4. 100 100.0 100 100 100
# 8. #DIV/0! #DIV/0! ### #DIV/0! -92.6 #DIV/0! #DIV/0! 0.0 #DIV/0! #DIV/0! #DIV/0!
# 16. #DIV/0! #DIV/0! ### #DIV/0! -92.6 #DIV/0! #DIV/0! 0.0 #DIV/0! #DIV/0! #DIV/0!
# 30. #DIV/0! #DIV/0! ### #DIV/0! -92.6 #DIV/0! #DIV/0! 0.0 #DIV/0! #DIV/0! #DIV/0!
# 50. #DIV/0! #DIV/0! ### #DIV/0! -92.6 #DIV/0! #DIV/0! 0.0 #DIV/0! #DIV/0! #DIV/0!
# 100. 1.2 0.3 99.7 1.6 0.4 99.6 -92.6 #DIV/0! #DIV/0! 0.0 #DIV/0! #DIV/0! 99.7
# 200. 6 1.4 98.6 6.6 1.7 98.3 0.4 #DIV/0! #DIV/0! 0.0 #DIV/0! #DIV/0! 98.5

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

SULEMAN, ST IDA LESTARI, ST DADANG KOERNIAWAN


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

EXTRACTION ASPAL MODIFIKASI


DENGAN ALAT REFLUG
Date of Test : 21 April 2013 Kontraktor 0
Tipe of Mix : Aspal Buton Panas Konsultan 0

NO I II
A Berat Aspal Buton Panas Gram 80.4
B Berat Filter.1 sebelum Gram 7.0
C Berat Filter.1 sesudah Gram 12.3
D Berat mineral C-B Gram 5.3
E Berat Filter.2 sebelum Gram 7.2
F Berat Filter.2 sesudah Gram 7.6
G Berat mineral F-E Gram 0.4
H Total berat mineral D+G Gram 5.7
I Berat Aspal A-H Gram 74.7
J Kadar mineral H / A x 100 % 7.09
K Kadar Aspal I / A x 100 % 92.91
Kadar mineral 7.09
Rata-rata
Kadar aspal 92.91

REMAKS : BINA MARGA KONSULTAN KONTRAKTOR

SULEMAN, ST IDA LESTARI, ST DADANG KOERNIAWAN


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

EXTRACTION ASPAL MODIFIKASI


DENGAN ALAT REFLUG
Date of Test : 27 Maret 2014 Kontraktor : PT. Wiratama Karya Nugraha
Tipe of Mix : Aspal Buton Konsultan : PT. Surya Perkasa Raya

NO I II
A Berat Aspal Asbuton Gram 177.2
B Berat Filter.1 sebelum Gram 8.2
C Berat Filter.1 sesudah Gram 138.7
D Berat mineral C-B Gram 130.5
E Berat Filter.2 sebelum Gram 8.0
F Berat Filter.2 sesudah Gram 17.2
G Berat mineral F-E Gram 9.2
H Total berat mineral D+G Gram 139.7
I Berat Aspal A-H Gram 37.5
J Kadar mineral H / A x 100 % 78.84
K Kadar Aspal I / A x 100 % 21.16
Kadar mineral asbuton 78.84
Rata-rata
Kadar bitumen asbuton 21.16

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

SULEMAN, ST IDA LESTARI, ST DADANG KOERNIAWAN


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PENGUJIAN BERAT JENIS MAKSIMUM CAMPURAN ( GMM )


( SNI. 03 - 6893 - 2002 )
Tanggal Pengujian : 22 MEI 2017 Kontraktor : PT. LIMANJAYA TRANS MIX
Rancangan Campuran : AC L Konsultan : PT. CATRASENA ENGINERING

Asphalt Content : 7.000 %

No Nomor Benda Uji I II

A Berat Labu + Benda Uji Gram 1295.8 1321.2


B Berat Labu Gram 612.2 612.2
C Berat Benda Uji A-B Gram 683.6 709.0
D Berat Labu + Air Gram 2559.5 2559.5
E Berat Labu + Air + Benda Uji Gram 2957.0 2971.9
F Volume Benda Uji (C+D)-E Gram 286.1 296.6
G Temperatur Air ° C 28 28
H Koreksi Temperatur ° C 0.9992 0.9992
I Berat Jenis C/F Gram/cc 2.389 2.390
J Berat Jenis Terkoreksi IxH Gram/cc 2.387 2.389
K
L Rata - rata Gram/cc 2.388

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
CALIBRATION OF COLD BIN
Tons / Hours.
Tanggal : 19 Maret 2012.
Fine 0 - 5 mm MA 5 - 19 mm CA 10 - 20 mm CA 30 - 50
NO. Open Gate Open Gate Open Gate Open Gate
RPM 25.cm RPM 21.cm RPM 21.cm RPM 7 cm
1 3.22 2.4 ton 3.05 2.6 ton 3.51 6.7 ton 5.0 6.8
2 5.9 7.5 ton 5.64 8.4 ton 5.8 10.10 ton 6.0 9.4
3 8.55 12.6 ton 8.21 14.3 ton 8.01 13.4 ton 6.4 10.6
4 11 16.4 ton 11 18.4 ton 10.8 17.9 ton 7.2 11.9
5 13.48 20.2 ton 13.75 22.6 ton 13.68 22.3 ton 8.6 13.4
6 16 23.9 ton 16.3 26.1 ton 15.9 25.8 ton 12.3 16.5
7 18.57 27.6 ton 18.76 29.5 ton 18.18 29.4 ton 13.6 21.6
8 23.68 30.8 ton 23.85 37.8 ton 23.41 39.1 ton

Fa 0 - 5 Ma 5 - 19 Ca 10 - 20
17
16
15
14
13
RPM

12
11
10
9
8
7
6
5
4
3
2
1
0
0 5 10 15 20 25 30 35 40 45
WEIGHT (Ton )

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

KAPASITAS PRODUK AMP = 100 TON / JAM

PROPORTION AGGREGATE COLD BIN


Total Agg Total Mix
Batu Pecah (10/19) = 25.00 % : 23.55 % 0.942
Batu Medium (5/10) = 38.00 % : 35.80 %
Abu Batu (0/05) = 35.00 % : 32.97 %
Filler (Semen) = 2.00 % : 1.88 %
:
100.00 %
Aspal Pen 60/70 : 5.80 %
100.00 %

BUKAAN PINTU COLD BIN KECEPATAN PUTAR

III Batu Pecah (10/19) = 23.55 % x 100 Ton = 23.55 ton/jam Speed Cold Bin = 14.4 Rpm

II Batu Medium (5/10) = 35.80 % x 100 Ton = 35.80 ton/jam Speed Cold Bin = 22.2 Rpm

I Abu Batu (0/05) = 32.97 % x 100 Ton = 32.97 ton/jam Speed Cold Bin = 23.4 Rpm

Filler (Semen) = 1.88 % x 100 Ton = 1.88 ton/jam

Aspal Pen 60/70 = 5.80 % x 100 Ton = 5.80 ton/jam

100.00 ton/jam

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR

0 0 0
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SIEVE ANALYS AGGREGATE


Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo
Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : HOT - BIN III Kind Of Material : HOT - BIN III

Weight : 1507.0 Gram Weight : 1919.6 Gram Weight : 1986.9 Gram Weight : 1719.4 Gram

SIEVE CUMULATIVE CUMULATIVE Average CUMULATIVE CUMULATIVE Average

SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS

1½" 100
1" 100
3/4" 100 100 100 100 100
1/2" 164.9 10.9 89.1 387.1 20.2 79.8 227.4 11.4 88.6 436.5 25.4 74.6 83.0
3/8" 1050.5 69.7 30.3 1456.7 75.9 24.1 1523.3 76.7 23.3 1253.7 72.9 27.1 26.2
# 4. 1438.8 95.5 4.5 1906.1 99.3 0.7 1976.3 99.5 0.5 1705.6 99.2 0.8 1.6
# 8. 1487.8 98.7 1.3 1910.5 99.5 0.5 1978.5 99.6 0.4 1712.5 99.6 0.4 0.6
# 16. 1498.1 99.4 0.6 1912.7 99.6 0.4 1979.7 99.6 0.4 1715.9 99.8 0.2 0.4
# 30. 1502.5 99.7 0.3 1914.1 99.7 0.3 1980.8 99.7 0.3 1718 99.9 0.1 0.2
# 50.
# 100.
# 200.

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SIEVE ANALYS AGGREGATE


Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo
Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : HOT - BIN II Kind Of Material : HOT - BIN II

Weight : 1290.7 Gram Weight : 1423.2 Gram Weight : 1227.9 Gram Weight : 1386.5 Gram

SIEVE CUMULATIVE CUMULATIVE Average CUMULATIVE CUMULATIVE Average

SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS

1½" 100
1" 100

3/4" 100

1/2" 100 100 100 100 100


3/8" 163.2 12.6 87.4 155.6 10.9 89.1 111.8 9.1 90.9 143.4 10.3 89.7 89.2
# 4. 963 74.6 25.4 1052.4 73.9 26.1 884.8 72.1 27.9 993.2 71.6 28.4 26.9
# 8. 1253 97.1 2.9 1400.2 98.4 1.6 1188.7 96.8 3.2 1367.8 98.7 1.3 2.3
# 16. 1275 98.8 1.2 1404.8 98.7 1.3 1225.9 99.8 0.2 1371.1 98.9 1.1 0.9
# 30. 1280.6 99.2 0.8 1407.1 98.9 1.1 1226.3 99.9 0.1 1373.9 99.1 0.9 0.7
# 50. 1284.2 99.5 0.5 1410.1 99.1 0.9 1226.5 99.9 0.1 1379.5 99.5 0.5 0.5
# 100. 1285.9 99.6 0.4 1415.7 99.5 0.5 1226.7 99.9 0.1 1382.3 99.7 0.3 0.3
# 200. 1286.8 99.7 0.3 1418.6 99.7 0.3 1226.8 99.9 0.1 1383.4 99.8 0.2 0.2

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SIEVE ANALYS AGGREGATE


Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo
Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : HOT - BIN I Kind Of Material : HOT - BIN I

Weight : 972.2 Gram Weight : 1076.7 Gram Weight : 1062.2 Gram Weight : 862 Gram

SIEVE CUMULATIVE CUMULATIVE Average CUMULATIVE CUMULATIVE Average

SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS

1½" 100
1" 100

3/4" 100

1/2" 100
3/8" 100 100 100 100 100
# 4. 100 100 100 100 100.0
# 8. 162.4 16.7 83.3 196.2 18.2 81.8 193.3 18.2 81.8 173.3 20.1 79.9 81.7
# 16. 393 40.4 59.6 520.0 48.3 51.7 485.3 45.7 54.3 410.3 47.6 52.4 54.5
# 30. 613.4 63.1 36.9 679.0 63.1 36.9 655.6 61.7 38.3 537.8 62.4 37.6 37.4
# 50. 712.3 73.3 26.7 757.5 70.4 29.6 750.4 70.6 29.4 593.6 68.9 31.1 29.2
# 100. 785.6 80.8 19.2 869.4 80.7 19.3 826.5 77.8 22.2 663.3 76.9 23.1 20.9
# 200. 839.7 86.4 13.6 935.8 86.9 13.1 913.4 86.0 14.0 740.9 86.0 14.0 13.7

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SIEVE ANALYS AGGREGATE


Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo
Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : Cemen Kind Of Material : Asbuton

Weight : 477.7 Gram Weight : 401.6 Gram Weight : 162.8 Gram Weight : Gram

SIEVE CUMULATIVE CUMULATIVE Average CUMULATIVE CUMULATIVE Average

SIZE WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS WT.RET % RET % PASS

1½" 100 100


1" 100 100
3/4" 100 100
1/2" 100 100
3/8" 100 100
# 4. 100 100
# 8. 100 100
# 16. 100 100
# 30. 100 100 100
# 50. 100 100 100 4.8 1.2 98.8 98.8
# 100. 1.2 0.3 99.7 1.6 0.4 99.6 99.7 23.1 5.8 94.2 94.2
# 200. 6.0 1.3 98.7 6.6 1.6 98.4 98.6 41.2 10.3 89.7 89.7

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SIEVE ANALYS AGGREGATE


Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo
Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

SIEVE HOT - BIN III HOT - BIN II HOT - BIN I Cement Asbuton
TOTAL BATASAN
SIZE
18% 40% 39.5% 2% 0.5%
2" 100 18 100 40 100 39.5 100 2 100 0.5 100

1½" 100 18 100 40 100 39.5 100 2 100 0.5 100

1" 100 18 100 40 100 39.5 100 2 100 0.5 100

3/4" 100 18 100 40 100 39.5 100 2 100 0.5 100 100

1/2" 83.0 14.9 100 40 100 39.5 100 2 100 0.5 96.4 90 ~ 100

3/8" 26.2 4.7 89.2 35.7 100 40 100 2 100 0.5 81.9 72 ~ 90

# 4. 1.6 0.3 26.9 10.8 100.0 40 100 2 100 0.5 52.6 43 ~ 63

# 8. 0.6 0.1 2.3 0.9 81.7 32.3 100 2 100 0.5 35.3 28 ~ 39.1

# 16. 0.4 0.1 0.9 0.4 54.5 21.5 100 2 100 0.5 24.0 19 ~ 25.6

# 30. 0.2 0.0 0.7 0.3 37.4 14.8 100 2 100 0.5 17.1 13 ~ 19.1

# 50. 0.5 0.2 29.2 11.5 100.0 2 98.8 0.5 13.7 9 ~ 15.5

# 100. 0.3 0.1 20.9 8.3 99.7 2 94.2 0.5 10.4 6 ~ 13

# 200. 0.2 0.1 13.7 5.4 98.6 2 89.7 0.4 7.5 4 ~ 10

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

CHART COMBINED GRADING

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING
PERCENT PASSING

200 100 50 30 16 8 4 3/8" 1/2" 3/4"


100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0
0.0 100.0
10.0

0.0 SIEVE SIZE


8.3 8.3 8.3 4
15.5 15.5 15.5

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SPECIFIC GRAVITY AND ABSORPTION

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : Kind Of Material : Hot - Bin III

NO.OF SAMPLE I II NO.OF SAMPLE I II


Weight of sample oven - dry in air (Gram ) A Weight of sample oven - dry in air (Gram ) A 5903 5728
Weight of sample saturated surface dry (Gram ) B Weight of sample saturated surface dry (Gram ) B 5998 5820
Weight of sample in water (Gram ) C Weight of sample in water (Gram ) C 3745 3589
A A 2.620 2.567
Bulk Specific Gravity ( oven dry ) Bulk Specific Gravity ( oven dry )
B-C Average B-C Average 2.594
B B 2.662 2.609
Bulk Specific Gravity ( SSD ) Bulk Specific Gravity ( SSD )
B-C Average B-C Average 2.635
A A 2.735 2.678
Apparent Specific Gravity Apparent Specific Gravity
A-C Average A-C Average 2.707
(B - A) 100 (B - A)100 1.609 1.606
Absorption ( % ) Absorption ( % )
A Average A Average 1.608

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SPECIFIC GRAVITY AND ABSORPTION

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : Hot - Bin II Kind Of Material :

NO.OF SAMPLE I II NO.OF SAMPLE I II


Weight of sample oven - dry in air (Gram ) A 4920 5059 Weight of sample oven - dry in air (Gram ) A
Weight of sample saturated surface dry (Gram ) B 5002 5117 Weight of sample saturated surface dry (Gram ) B
Weight of sample in water (Gram ) C 3069 3137 Weight of sample in water (Gram ) C
A 2.545 2.555 A
Bulk Specific Gravity ( oven dry ) Bulk Specific Gravity ( oven dry )
B-C Average 2.550 B-C Average

B 2.588 2.584 B
Bulk Specific Gravity ( SSD ) Bulk Specific Gravity ( SSD )
B-C Average 2.586 B-C Average

A 2.658 2.632 A
Apparent Specific Gravity Apparent Specific Gravity
A-C Average 2.645 A-C Average

(B - A) 100 1.667 1.146 (B - A)100


Absorption ( % ) Absorption ( % )
A Average 1.407 A Average

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SPECIFIC GRAVITY AND ABSORPTION

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

Kind Of Material : Hot - Bin I Kind Of Material : Cement

NO.OF SAMPLE I II NO.OF SAMPLE I II


Weight of sample saturated surface dry in air (Gram) 500 500 500 Weight of sample saturated surface dry in a (Gram) 200 200 200
Weight of sample oven - dry in air (Gram) A 491.5 491.4 Weight of sample oven - dry in air (Gram) A 200 200
Weight of flask + water to calibration mark (Gram) B 634.2 662.2 Weight of flask + water to calibration mark (Gram) B 125.6 127.1
Weight of sample + flask + water to calibratio (Gram) C 948.8 972.3 Weight of sample + flask + water to calibra (Gram) C 262.2 263.5
A 2.651 2.588 A 3.155 3.145
Bulk Specific Gravity ( oven dry ) Bulk Specific Gravity ( oven dry )
(B+500-C) Average 2.619 (B+200-C) Average 3.150
500 2.697 2.633 200 3.155 3.145
Bulk Specific Gravity ( SSD ) Bulk Specific Gravity ( SSD )
(B+500-C) Average 2.665 (B+200-C) Average 3.150
A 2.778 2.710 A 3.155 3.145
Apparent Specific Gravity Apparent Specific Gravity
(B+A-C) Average 2.744 (B+A-C) Average 3.150
(500-A100 1.729 1.750 (200-A)100
Absorption ( % ) Absorption ( % )
A Average 1.740 A Average

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

THEORETICAL SPECIFIC GRAVITY

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING

% Of Specific Gravity Factor


No Aggregate
Fraction Bulk Apparent Bulk Apparent
A B C D E=B/C F=B/D
1 Hot Bin III 18 2.594 2.707 6.940 6.650
2 Hot Bin II 40 2.550 2.645 15.685 15.122
3 Hot Bin I 40 2.619 2.744 15.271 14.575
4 Cement 2 3.150 3.150 0.635 0.635

38.531 36.983

I Bulk Specific Gravity total Agg 100


: = 2.595 Gr / Cm³
∑E

II Apparent Specific Gravity Total Agg : 100


= 2.704 Gr / Cm³
∑F

III Effective Specific Gravity Total Agg : I + II


= 2.650 Gr / Cm³
2

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

AGGREGATE SURFACE AREA


Ukuran Ayakan Combin Surface
Fuller Daerah Larangan Titik Kontrol Faktor Surface Area
ASTM mm Grading Area
min max A B C=AxB

1½" 37.5 100

1" 25 100

3/4" 19 100.0 100 100 100 1 X 0.41 0.41

1/2" 12.5 392.1 90 100 96.443

3/8" 9.5 346.6 72 83 81.915

#4 4.75 253.7 43 63 52.571 X 0.41 0.216

#8 2.36 185.2 34.6 34.6 28.0 39.1 35.292 X 0.82 0.289

# 16 1.18 135.6 22.3 28.3 19.0 25.6 23.973 X 1.64 0.393

# 30 0.6 100.0 16.7 20.7 13.0 19.1 17.125 X 2.87 0.491

# 50 0.3 73.2 13.7 13.7 9.0 15.5 13.745 X 6.14 0.844

# 100 0.15 53.6 6 13 10.388 X 12.29 1.277

# 200 0.075 39.2 4 10 7.474 X 32.77 2.449

Total : 6.369

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR
MAXIMUM SPECIFIC GRAVITY OF BITUMENOUS PAVING MIXTURE
( AASHTO - T.209 )
Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo
Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING
Asphalt Content : 6.200 %

No SAMPLE No. I II
A Weight Of Flask + Sample Gram 1333.3 1306.9
B Weight Of Flask Gram 812.4 812.4
C Weight Of Sample A-B Gram 529.1 501.5
D Weight Of Flash + Water Gram 2180.0 2180.0
E Weight Of Flask + Water + Sample Gram 2492.1 2475.9
F Volume Of Sample (C+D)-E Gram 217.0 205.6
G Temperature Of Water ° C 28 28
H Corection Of Temperature ° C 0.9992 0.9992
I Max Specific Grafity C/F Gram/cc 2.438 2.439
J Max Specific Grafity Corection IxH Gram/cc 2.436 2.437
K
L Avreage Gram/cc 2.437

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR
PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING
Penetration of Bitumen : 60/70 GMM 2.437 Bulk Sp.Gr U : 2.595 Temperature : 150 º C
Sp.Gr of Bitumen X : 1.033 Surface Area S : 6.369 Effective Sp Gr V : 2.650 Compaction : 75 Blows

Bitumen Bitumen Absorbed Effective Max Sp.gr Weght ( Gram ) Volume Bulk SpGr Air Void Stability Marshall Bitument
No. Extrack Modified Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien Film
Content Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) Thickness
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U B- 100 -
100. X (100-B)C GMM LAB LAB LAB H - G F (E-J)100 (100-B)J (L-K)100 LAB LAB LAB O (B-C)*100
GMM 100 I E U L P (S*X)*(100-B)
1 5.69 6.200 0.835 5.416 2.437 1208.7 695.0 1214.6 519.6 2.326 96 1350 3.34
2 1205.8 692.0 1211.2 519.2 2.322 92 1294 3.46
3 1207.1 696.6 1215.9 519.3 2.324 90 1266 3.42
Average 2.324 4.61 15.99 71.16 1303 3.41 382.6 8.69
1 5.69 6.200 0.835 5.416 2.437 1207.5 694.4 1214.2 519.8 2.323 85 1196 3.56
2 1204.6 691.3 1210.0 518.7 2.322 87 1224 3.68
3 1208.7 693.6 1214.0 520.4 2.323 85 1196 3.56
Average 2.323 4.68 16.05 70.83 1205 3.60 334.7 8.69

Retained strength index 60 ºC / 24 hours = (1205 / 1303) x 100 = 92.45 %

Speck 3.0 - 5.5 Min 14 Min 65 Min 1000 Min 3 Min 300 Min 8

REMARKS : BINA MARGA KONSULTAN KONTRAKTOR


REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

PROPERTIES OF ASPHALT MIXES BY MARSHALL METHOD

Date of Test : 26 April 2013 Kontraktor : PT. Aremix Planindo


Tipe of Mix : AC WC MODIF Konsultan : PT. ARIA JASA REKSATAMA &
PT. SEECONS ENGINEERING
Penetration of Bitumen : 60/70 GMM 2.437 Bulk Sp.Gr U : 2.595 Temperature : 150 º C
Sp.Gr of Bitumen X : 1.033 Surface Area S : 6.369 Effective Sp Gr V : 2.650 Compaction : 400 Blows

Bitumen Bitumen Absorbed Effective Max Sp.gr Weght ( Gram ) Volume Bulk SpGr Air Void Stability Marshall Bitument
No. Extrack Modified Bitumen Bitumen Combine In In Of Combine Void V.M.A Filled Meas Adjust Flow Quotien Film
Content Mix Air Water S.S.D Specimen Mix (%) (%) (%) ( mm ) ( Kg/mm ) Thickness
A B C D E F G H I J K L M N O P Q R
A + X ( 100 - A ) -
U B- 100 -
100. X (100-B)C GMM LAB LAB LAB H - G F (E-J)100 (100-B)J (L-K)100 LAB LAB LAB O (B-C)*100
GMM 100 I E U L P (S*X)*(100-B)
1 5.69 6.200 0.835 5.416 2.437 1205.7 701.6 1208.4 506.8 2.379
2 1201.5 699.9 1204.9 505.0 2.379
3 1200.3 699.8 1204.1 504.3 2.380
Average 2.379 2.35 14.00 83.20

PERCENTASE REFUSAL DENSITY

Speck Min 2.0


REMARKS : BINA MARGA KONSULTAN KONTRAKTOR
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

JOB MIX DESIGN 2


HOT - BIN
TRIAL LABORATORY
AC WC MODIFIKASI
0.944
C
HOT _ BIN III

1609.1 1507 2021.7 1920 2089 1987 1821.5 1719

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

3/4 -102 -102 -102 -102

1/2 267 164.9 489.2 387.1 329.5 227.4 538.6 436.5

3/8 1152.6 1051 1558.8 1457 1625.4 1523 1355.8 1254

4 1540.9 1439 2008.2 1906 2078.4 1976 1807.7 1706

8 1589.9 1488 2012.6 1911 2080.6 1979 1814.6 1713

16 1600.2 1498 2014.8 1913 2081.8 1980 1818 1716

30 1604.6 1503 2016.2 1914 2082.9 1981 1820.1 1718

50

100

200
L L
HOT - BIN II

1392.8 1291 1525.3 1423 1330 1228 1488.6 1387

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

3/4 -102 -102 -102 -102

1/2 -102 -102 -102 -102

3/8 265.3 163.2 257.7 155.6 213.9 111.8 245.5 143.4

4 1065.1 963 1154.5 1052 986.9 884.8 1095.3 993.2

8 1355.1 1253 1502.3 1400 1290.8 1189 1469.9 1368

16 1377.1 1275 1506.9 1405 1328 1226 1473.2 1371

30 1382.7 1281 1509.2 1407 1328.4 1226 1476 1374

50 1386.3 1284 1512.2 1410 1328.6 1227 1481.6 1380

100 1388 1286 1517.8 1416 1328.8 1227 1484.4 1382


200 1388.9 1287 1520.7 1419 1328.9 1227 1485.5 1383
c c
HOT - BIN I

1074.3 972.2 1178.8 1077 1164.3 1062 964.1 862

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

-102 -102 -102 -102

3/4 -102 -102 -102 -102

1/2 -102 -102 -102 -102

3/8 -102 -102 -102 -102

4 -102 -102 -102 -102

8 264.5 162.4 298.3 196.2 295.4 193.3 275.4 173.3

16 495.1 393 622.1 520 587.4 485.3 512.4 410.3

30 715.5 613.4 781.1 679 757.7 655.6 639.9 537.8

50 814.4 712.3 859.6 757.5 852.5 750.4 695.7 593.6

100 887.7 785.6 971.5 869.4 928.6 826.5 765.4 663.3

200 941.8 839.7 1037.9 935.8 1015.5 913.4 843 740.9


L
cemen

516.4 423.8 489.4 396.8 255.4 162.8

-92.6 -92.6 -92.6

-92.6 -92.6 -92.6

-92.6 -92.6 -92.6

-92.6 -92.6 -92.6

-92.6 -92.6 -92.6

3/4 -92.6 -92.6 -92.6

1/2 -92.6 -92.6 -92.6

3/8 -92.6 -92.6 -92.6

4 -92.6 -92.6 -92.6

8 -92.6 -92.6 -92.6

16 -92.6 -92.6 -92.6

30 -92.6 -92.6 -92.6

50 -92.6 -92.6 97.4 4.8

100 93.8 1.2 94.2 1.6 115.7 23.1

200 98.6 6.0 99.2 6.6 133.8 41.2


18% CA 64.7 0.0

40% FA 27.8 0.0

40% FF 7.5 0.0

2% Aspl 5.36 5.36

0% 105.4 5.4

3.1 ±5 4.8 91.6 101

14.5 ±5 4.1 77.8 86.0

29.3 ±5 2.6 49.9 55.2

17.3 ±5 1.8 33.5 37.1

33.3 ±3 0.7 23.3 24.7

2 ±3 0.5 16.6 17.6

±3 0.4 13.3 14.2

±2 0.2 10.2 10.6

±1 0.1 7.4 7.5

100 95.1 80.4 54.3 35.2 24.8 17.8 12 8.7


Fuller Larangan
1½" 100 100 100 100
1" 100 100 100 100
3/4" 100 100 100 100 100 100
1/2" 82.8 82.8 82.8 90 100 96.4
3/8" 73.2 73.2 73.2 72 90 81.9
4 53.6 53.6 53.6 43 63 52.6
8 39.1 39.1 39.1 39.1 39.1 28.0 39.1 35.3
16 28.6 28.6 31.6 25.6 31.6 19.0 25.6 24.0
30 21.1 21.1 23.1 19.1 23.1 13.0 19.1 17.1
50.0 15.5 15.5 15.5 15.5 15.5 9.0 15.5 13.7
100.0 11.3 11.3 11.3 6 13 10.4
200.0 7.3 7.3 8.3 4 10 7.5

0.0 100.0
HOT BIN 1 HOT BIN 2 HOT BIN 3 HOT BIN 4

-93.5 -93.5 -93.5 -93.5

-93.5 -93.5 -93.5 -93.5

-93.5 -93.5 -93.5 -93.5

3/4 -93.5 -93.5 -93.5 1005 911.9

1/2 -93.5 0 -93.5 800.6 707.1 1490 1396

3/8 -93.5 244.5 151 1126 1032 1537 1443

4 112.5 19 1009.9 916.4 1380 1286.7 1540 1447

8 423.6 330.1 1200.2 1107 1383 1289.4 1369 1275

16 695.6 602.1 1209.5 1116 1386 1292.7 1372 1279

30 855.5 762 1215.5 1122 1346 1252.5

50 965.5 872 1218.2 1125

100 1033.6 940.1

200 1079.5 986


HOT BIN 1 HOT BIN 2 HOT BIN 3 HOT BIN 4

-93.5 -93.5 -93.5 -93.5

-93.5 -93.5 -93.5 -93.5

-93.5 -93.5 -93.5 -93.5

3/4 -93.5 -93.5 -93.5 1005 911.9

1/2 -93.5 0 -93.5 800.6 707.1 1490 1396

3/8 -93.5 244.5 151 1126 1032 1537 1443

4 112.5 19 1009.9 916.4 1380 1286.7 1540 1447

8 423.6 330.1 1200.2 1107 1383 1289.4 1369 1275

16 695.6 602.1 1209.5 1116 1386 1292.7 1372 1279

30 855.5 762 1215.5 1122 1346 1252.5

50 965.5 872 1218.2 1125

100 1033.6 940.1

200 1079.5 986


HOT BIN 1 HOT BIN 2 HOT BIN 3 HOT BIN 4

-93.5 -93.5 -93.5 -93.5

-93.5 -93.5 -93.5 -93.5

-93.5 -93.5 -93.5 -93.5

3/4 -93.5 -93.5 -93.5 1005 911.9

1/2 -93.5 0 -93.5 800.6 707.1 1490 1396

3/8 -93.5 244.5 151 1126 1032 1537 1443

4 112.5 19 1009.9 916.4 1380 1286.7 1540 1447

8 423.6 330.1 1200.2 1107 1383 1289.4 1369 1275

16 695.6 602.1 1209.5 1116 1386 1292.7 1372 1279

30 855.5 762 1215.5 1122 1346 1252.5

50 965.5 872 1218.2 1125

100 1033.6 940.1

200 1079.5 986


HOT BIN 1 HOT BIN 2 HOT BIN 3 HOT BIN 4
-93.5 -93.5 -93.5 -93.5

3/4 -93.5 -93.5 -93.5 1005 911.9


1/2 -93.5 0 -93.5 800.6 707.1 1490 1396
3/8 -93.5 244.5 151 1126 1032 1537 1443
8 423.6 330.1 1200.2 1107 1383 1289.4 1369 1275

16 695.6 602.1 1209.5 1116 1386 1292.7 1372 1279

30 855.5 762 1215.5 1122 1346 1252.5


50 965.5 872 1218.2 1125
100 1033.6 940.1
200 1079.5 986
15600

2496
120
130
125

140
145
140

92.45
3.175 12.5

6.2 14.00 83.20 0.00 0 0.00 0.0 2.352


93.3 ### ### ### ### ### ### ###
4.5
0.955

5.0

0.95

5.5

0.945

6.0

0.94

6.5

0.935
93.3 ### ### ### ### ### ### ###
4.5
0.955

5.0

0.95

5.5

0.945

6.0

0.94

6.5

0.935
93.3 ### ### ### ### ### ### ###
4.5
0.955

5.0

0.95

5.5

0.945

6.0

0.94

6.5

0.935
90.4 100

76.4 84.4

54.3 60

34.1 37.7

23.8 25.3

16.9 18

11.7 12.4

6 6.2

5.8
100 100 100 100
90.4 100 100 91.8
76.4 84.4 86.3 76.8
54.3 60 62.2 52.8
34.1 37.7 39.1 31.2
23.8 25.3 25.6 20.6
16.9 18 18.5 12.8
11.7 12.4 14 8.4

6 6.2 7.2 5.3


A
1167 3.30 130
1145 3.18 125
1366 3.05 120
1226 3.18

76 1674
64 1410
60 1322
58 1278
71 1564
68 1498
1457
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR

SUMMARY JOB MIX FORMULA


AC - L
MATERIAL
1 Batu Pecah (10/19) Ex.Paserepan
2 Batu Medium (5/10) Ex.Paserepan
3 Abu Batu (0/05) Ex.Paserepan
4 Filler (Semen) Ex.Gresik
5 Aspal Pen 60/70 Ex.

KOMPOSISI CAMPURAN
0.942
PROPORSI HOT BIN % TERHADAP AGREGAT % TERHADAP CAMPURAN

1 HOT BIN III (Batu Pecah 10/19) 25.00 % 23.55 %


2 HOT BIN II (Batu Medium 5/10) 38.00 % 35.80 %
3 HOT BIN I (Abu Batu 0/05) 35.00 % 32.97 %
4 Filler (Semen) 2.00 % 1.88 %
5 Asphalt PEN 60/70 5.80 %
100.00 % 100.00 %

Kandungan Aspal Modifikasi (JAP-57)

Kadar Aspal Murni 100.00 %


Kadar Mineral 0.00 %
100.00 %

ASPHALT MIXING PLANT

BUKAAN COLD BIN KECEPATAN PUTAR


KAPASITAS PRODUK : 100 Ton / Jam

1 COLD BIN III (Batu Pecah 10/19) 23.55 Ton / Jam : Speed Cold Bin = 14.4 Rpm
2 COLD BIN II (Batu Medium 5/10) 35.80 Ton / Jam : Speed Cold Bin = 22.2 Rpm
3 COLD BIN I (Abu Batu 0/05) 32.97 Ton / Jam : Speed Cold Bin = 23.4 Rpm
4 Filler (Semen) 1.88 Ton / Jam
5 Asphalt Pen 60/70 5.80 Ton / Jam
100.00 Ton / Jam
PROPORSI HOT BIN : 1000 Kg / Batch
%Total agg %Total Mix Accumulative Cummulative
1 HOT BIN. I 35.0 % 32.97 % 329.7 Kg 329.7 Kg
2 HOT BIN. II 38.0 % 35.80 % 358.0 Kg 687.7 Kg
3 HOT BIN. III 25.0 % 23.55 % 235.5 Kg 923.2 Kg
4 FILLER 2.0 % 1.88 % 18.8 Kg 942.0 Kg
5 Asphalt Pen 60/70 5.80 % 58.0 Kg 58.0 Kg
100.0 % 100.00 % 1000.0 Kg 1000.0 Kg

Kandungan Aspal Pen 60/70

Kadar Aspal Murni 100.00 %


Kadar Mineral 0.00 %
100.00 %

COMBINE GRADING
SIEVE SIZE 1" 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 100 # 200

Job Design II (Hot - Bin) 100 100.0 93.2 81.3 58.6 34.5 22.6 17.0 12.9 8.8 6.0
Batasan 100 100 90 - 100 77 - 90 53 - 69 33 - 53 21 - 40 14 - 30 9 - 22 6 - 15 4-9

HASIL PENGUJIAN MARSHALL

NO. JENIS PENGUJIAN HASIL PENGUJIAN SPESIFIKASI

1. Kadar Aspal Total Campuran % 5.80


2. Stabilitas Marshall Kg 1410 Min 1000
3. Hasil Bagi Marshall Kg/mm 440.5 Min 300
4. Kelelahan Plastis mm 3.20 2,0 - 4,0
5. Rongga Dalam Campuran % 4.11 3,0 - 5,0
6. Rongga Terhadap Aspal % 72.94 Min 65
7. Rongga Terhadap Agregat % 15.18 Min. 15
8. BJ Bluk Campuran 2.317
9. Penyerapan Aspal Terhadap
Total Campuran % 0.877 Max. 1.2
10. Retained Strength Index % 92.59 Min. 90
11. Rongga Dalam Campuran (VIM) PRD % 3.30 Min. 90

Disetujui Oleh Diperiksa Oleh Dibuat Oleh


Direksi Konsultan Supervisi Penyedia Jasa
Labuan - Maligano

TOTOK ATMANTO, ST HERI


NIP. 19600319 199101 1 001 CI / QUANTITY QUALITY Quality
Pengawas Lapangan CI / QUANTITY QUALITY Quality
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROPINSI SULAWESI TENGGARA (BUTON)

PENGESAHAN

JOB MIX FORMULA


AC - L

Diperiksa & Disetujui Oleh Diajukan Oleh

KONSULTAN SUPERVISI PENYEDIA JASA

M. HERI NASTOTOK, ST. CANDRA, ST


Site Engineer General Superintendent

Di Setujui
PEJABAT PEMBUAT KOMITMEN
PAKET: PRESERVASI REKONSTRUKSI JALAN ARTERI BARAT SURABAYA-LEGUNDI-BUNDER-SIDOARJO
PAKET : PRESERVASI REKONSTRUKSI JALAN ARTERI BARAT SURABAYA-LEGUNDI-BUNDER-SIDOARJO

SUKARJI, ST.
NIP. 19670702 198810 1 001
REPUBLIK INDONESIA
PEMERINTAH PROVINSI JAWA TIMUR
DINAS PEKERJAAN UMUM BINA MARGA
DPA - SKPD APBD PROVINSI JAWA TIMUR
SATKER PELAKSANAAN JALAN NASIONAL WILAYAH III PROPINSI SULAWESI TENGGARA (BUTON)

JOB MIX FORMULA


AC - L

PAKET :

PRESERVASI REKONSTRUKSI JALAN ARTERI SURABAYA-LEGUNDI-BUNDER-SIDOARJO

KONSULTAN SUPERVISI PENYEDIA JASA

PT. CATRASENA ENGINERING PT. TRIPALINDO TRANS MIX