Sl.

Name of the Circle Total PPs PPs Populated in eCAD


No.

1 2 3 4
Major & Medium
1 ACE, Eastern Circle-I, Cuttack 261 4
2 ACE, Eastern Circle-II, Chandikhole 114 0
3 ACE, Eastern Circle-III, Jajpur 69 0
4 ACE, Central Irrigation Circle, BBSR 307 69
5 ACE, Angul Irrigation Circle, Angul 45 0
6 ACE, Rengali Right Irrigation Circle, DKL 11 30
7 ACE, Rengali Head Works Circle, Samal 126 0
8 ACE, Salapada Irrigation Circle, Salapada 213 0
9 CCE, Lower Indra Irrigation Project, Nuapada 70 0
10 CCE, Ret Irrigation Project, Bhawanipatna
19
0
11 CCE, Subernarekha Irr. Project, Laxmiposi 24 0
12 ACE, Baripada Irrigation Circle, Baripada 77 0
13 ACE, Rushikulya Bahuda Basin, Berhampur 240 0
14 ACE, Vansadhara Nagabali Basin,
39
Parlakhemundi 0
15 ACE, Western Irr. Circle, Bhawanipatna 71 0
16 ACE, Bolangir Irrigation Circle. Bolangir 93 0
17 ACE, Upper Kolab Project, Jaipur 102 0
18 CCE,Upper Indravati Project,Mukhiguda 267 0
19 CCE, Potteru Irr Projcect, Balimela 194 0
20 ACE, Canal Circle, Burla 340 0
21 ACE, JICA Projects Circle, Sukinda
32
0
Sub- Total 2714 103
1.Only Achieved e CAD Data population: 3.8 Percentage