CRS For AC DC Panels Base Design@25-03-2021
CRS For AC DC Panels Base Design@25-03-2021
Calculations Is attached
General
2 Define the rate & type of F1,F2,F3,F4,F5& F6 Clarified and shown in the attached schematics-Sheet B01-1
4 Where’re the lamps for U/V & O/V & earth leakage? (attached) Clarified and shown in the attached schematics-Sheet B01-1
confirmed for the
2) Sheet B01-4,B01-5,B01-8& B01-9 Glands
1
All spare MCB’s must be connected to terminal & also spare cable glands for future All spare MCB’s will be connected via terminal blocks
connection must be added with proportional to No. of spare MCB’s Regarding to the Glands (ENERGYA TO REPLY)
3) Where’s the drawings for:
As shown in the sequence of operation table in sheet B01-1
1 Operation of Q1,Q2 & Q0 (M/A)
And all control wiring showing the attached schematics
2 F64-1, F64-2
1) Sheet B01-1:
2 Define the rate & type of Q50,Q51,Q52&Q53 Shown in the attached schematics
All spare MCB’s must be connected to terminal & also spare cable glands for future All spare MCB’s will be connected via terminal blocks
1
connection must be added with proportional to No. of spare MCB’s Regarding to the Glands (ENERGYA TO REPLY)
as agreed in the last
meeting , the C.Bs
2 Main AC board must have (6) MCB’s of 150A & (6) MCB’s of 100A will be supplied. 3 of ENERGYA TO REPLY
them will be installed
in the panel and 3 will
EGYPTIAN ELECTRICITY TRANSMISSION COMPANY be supplied as loose .
because the Aux.
transformer Is only
0.5MVA
Date:
COMMENT RESPONSE SHEET 31 / 03/ 2021
(CRS)
Document/Drawing No.: Rev. 00 Reference
Review Status: EETC Page 3 of 3
Title: Kindly Refer to Project coordination Procedure CONTRACTOR
Abou Rawsh SS AC/DC Panels Base Design
2 F64-1,F64-2
3 Q1,Q2,Q0 (internal drawing such as: motor,contacts,coils…) Shown in the attached schematics
4) Main AC board must have (2) MCB’S of 150A for outdoor fence (attached) ENERGYA TO REPLY