REHABILITATION

PHOTO PROGRESS
COVER CROPS PLANTING - SOSIS METHOD
SLOPE AREA: PROCESS PLANT & MHR

Mix Matrial Matrial Mix digulung Sosis Siap dipasang

Pertumbuhan Cover Crops Sosis Terpasang di Slope Pemasangan Sosis


Area MHR Area MHR
FLOATING BALL TRIAL @ DAM 2 & DOMESTIC POND
VETIVER SPECIES

Ambil Bibit Vetiver Buat Floating Ball Floating Ball

Floating Ball @ Floating Ball ke DAM 2 Mobilisasi Floating Ball


Domestic Pond
DAM 1 (COVER CROPS PLANTING)

After ± 3 Months
Slope CAR (COVER CROPS PLANTING)

After ± 6 Months
Slope Spillway DAM 5 (COVER CROPS PLANTING)

After ± 4 Months
Slope Spillway DAM 5 (Cover Crops Planting)

After ± 2 Months
Slope SAR Panorama (Cover Crops Planting)

After ± 5 Months
Waste Dump MIA (Cover Crops Planting)

After ± 9 Months
DAM 4 (Cover Crops Planting)

After ± 3 Months