WP 06 WP 12 WP 17 WP 19 WP 24 WP 25 WP 26 WP 29 WP 42 WP 39 WP 78

Date Weekly
Warutas Utara Kuncir Selatan Staging WP 25 Stagging WP 42 Kuncir Selatan Kuncir Selatan BSS Utara Warutas Tengah Kuncir Selatan Warutas Tengah
Sump Kuncir Selatan-Utara
SP Warutas Utara K. Selatan-Utara Sp. Crusher 5 Utara Sp. Crusher 5 Utara Stagging WP 17 Sedpond Cr 5 Utara Sp Warutas Utara Stagging WP 19 M16 (WP.29) Sump BSS Utara
01-Feb-23 WK1 21.50 STB 20.83 16.75 Schedule Replace 20.60 23.00 11.90 16.81 STB (digantikan
Sleeve Shaft WP06)
Schedule Replace
02-Feb-23 WK1 STB 18.83 16.33 9.25 18.00 19.50 21.50 10.08 5.50
Sleeve Shaft
Schedule Replace
03-Feb-23 WK1 18.55 6.83 24.00 10.67 Sleeve Shaft 12.00 23.17 22.50 10.58 6.50

Schedule Replace
04-Feb-23 WK1 21.75 13.67 24.00 24.00 Sleeve Shaft 20.88 23.00 24.00 24.00 17.25

Schedule Replace
05-Feb-23 WK1 12.00 STB 12.00 12.00 Sleeve Shaft 12.00 24.00 12.00 12.00 4.00

Schedule Replace
06-Feb-23 WK2 20.50 9.88 22.45 16.16 Sleeve Shaft 22.41 22.33 10.80 16.15 3.83 22.58

Schedule Replace
07-Feb-23 WK2 23.33 18.50 STB STB Sleeve Shaft 12.00 23.25 5.00 STB STB 21.00

Total 117.63 67.71 119.61 88.83 0.00 117.89 158.25 107.70 89.62 37.08 43.58
Average 19.61 13.54 19.94 14.81 0.00 16.84 22.61 15.39 14.94 7.42 21.79