You are on page 1of 128

Materi Pelatihan Maximo 7.

6
WPC
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or distribute this document
without permission of PLN NUSANTARA POWER, PT 1
Profil Instruktur

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Komitmen Bersama

1/1

ANTUSIAS, AKTIF, POSITIF, OPEN MIND


The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
APLIKASI EAM MAXIMO 7.6 STREAM WPC

TUJUAN
Mampu memahami alur proses dan pengaplikasian EAM (Maximo 7.6) pada praktek WPC di pembangkit

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 4
APLIKASI EAM MAXIMO 7.6 STREAM WPC

KRITERIA PEMBELAJARAN
1. Memahami dasar pemahaman pengoperasian aplikasi (penjelasan fitur)
2. Memahami proses dan alur pembuatan Work Group
3. Memahami proses dan alur pembuatan Standar Job / Job Plan
4. Memahami proses dan alur pembuatan Preventive Maintenance
5. Memahami proses dan alur pembuatan Work Order, Down Time, Job code / Failure Code Actual cost, Safety Plan
6. Memahami proses dan alur pembuatan PRK
7. Memahami proses dan alur pembuatan PR & IR (Ellipse)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 5
1. Fitur Maximo
Area WPC

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 6
or distribute this document without permission of PLN NUSANTARA POWER, PT
APLIKASI EAM MAXIMO 7.6 STREAM WPC

Fitur – fitur Maximo di WPC


1. Service Request
2. Work Order
3. Activities and Tasks
4. Quick reporting
5. Job Plan
6. Preventive Maintenance
7. Labor
8. Project Control

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 7
2. Work Group

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 8
or distribute this document without permission of PLN NUSANTARA POWER, PT
APLIKASI EAM MAXIMO 7.6 STREAM WPC

Work Group Maximo 7.6

No Work Group Deskripsi


1 RENHARU Rendal Pemeliharaan PLTU, PLTG, PLTGU, PLTA, PLTD, PLTMG
& CNG
Assistant
STAF RENDAL Route Flow Manager Rendal
HAR HAR

2 RENMOU Manajemen Outage PLTU, PLTG, PLTGU, PLTD, PLTMG & CNG
Assistant
Route Flow
STAF MO Manager MO

3 RENOPU Rendal Operasi PLTU, PLTG, PLTGU, PLTA, PLTD, PLTMG &
CNG

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 9
3. Job Plan

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 10
or distribute this document without permission of PLN NUSANTARA POWER, PT
APLIKASI EAM MAXIMO 7.6 STREAM WPC
JOB PLAN
• Job Plan adalah kegiatan untuk merencanakan pemeliharaan mulai dari aktivias pemeliharaan, material, dan
jasa yang dibutuhkan, tool yang diperlukan hingga jumlah tenaga kerja yang akan melakukan aktivitas
tersebut
• Job Plan biasanya digunakan untuk melakukan perencanaan pemeliharaan yang bersifat rutin meski tidak
menutup kemungkinan Job Plan digunakan untuk pemeliharaan korektif

Plan
Tasks
Plan
Materials

Plan
Labor Safety
Plan Plan
Tools
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 11
APLIKASI EAM MAXIMO 7.6 STREAM WPC

PENOMERAN JOB PLAN

 Karena belum ada SK Standarisasi Job Plan di Maximo PT PJB maka pada training ini trainer mencontohkan standar
penomoran Job Plan yang ada pada Maximo PLN

PENOMORAN CONTOH
Segment 1 [4 Digit] : Nama Unit Pembangkit Segment 1 [4 Digit] : MK02
Segment 2 [2 Digit] : Tipe Pembangkit Segment 2 [2 Digit] : GU
Segment 3 [2 Digit] : JP (Singkatan dari Job Plan) Segment 3 [2 Digit] : JP
Segment 4 [4 Digit] : Tipe dari bidang pemeliharaan Segment 4 [4 Digit] : MECH
Segment 5 [3 Digit] : Equipment Segment 5 [3 Digit] : MAV
Segment 6 [2 Digit] : No Urut Segment 6 [2 Digit] : 01
Segment 7 [2 Digit] : Frekuensi dari aktivitas pemeliharaan Segment 7 [2 Digit] : 07

AAAA-BB-JP-XXXX-YYY-ZZ-RR MK02-GU-JP-MECH-MAV-01-07

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 12
Pendaftaran Master Job Plan
Planning -> Job Plan

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Klik tanda (+)

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Isikan field mandatory (yang di bintang merah)

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Job Plan Header

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Job Plan Tasks

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Job Plan Tasks

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Isikan Long Description pada Job Plan Tasks

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Pengisian Labor pada Job Plan

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Pengisian Materials pada Job Plan

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Pengisian Tools pada Job Plan

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pendaftaran Master Job Plan
Tekan tombol Save

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Aktivasi Job Plan
Change Status

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Aktivasi Job Plan
Pilih Active

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Aktivasi Job Plan
Job Plan sudah Active

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Revisi Job Plan
Klik Revise Job Plan

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Revisi Job Plan
Masukkan alasan revisi

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Revisi Job Plan
Lakukan Revisi Job Plan -> pada training ini revisi dilakukan pada deskripsi -> klik save

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Revisi Job Plan
Akan terbentuk revision 1 pada Job Plan -> change status Revision Job Plan menjadi Active

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Aktivasi Revisi Job Plan
Job Plan revision 1 Active

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
History Revisi Job Plan
Terdapat 2 Job Plan yang sama dengan revision 0 status REVISED dan revision 1 status ACTIVE

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
History Revisi Job Plan
Klik View Revision History

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
History Revisi Job Plan
Pelaku revisi tercatat

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Penghapusan Job Plan
Klik Delete Job Plan

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
4. Preventive
Maintenance

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 36
or distribute this document without permission of PLN NUSANTARA POWER, PT
Penomoran Preventive Maintenance

 Karena belum ada SK Standarisasi Preventive Maintenance di Maximo PT PJB maka pada
training ini trainer mencontohkan standar penomoran Preventive Maintenance yang ada pada
Maximo PLN

Penomoran Preventive Maintenance di Maximo PLN menggunakan konsep 4


segment dengan format sebagai berikut:
Segment 1 [6 Digit] : Nama Unit dan Tipe Pembangkit
Segment 2 [2] : PM (Singkatan Preventive Maintenance)
Segment 3 [2-3] : Urutan Unit, misal U1 (Unit 1), 10 (GT 10)
Segment 4 : No Urut. Digit menyesuaikan kebutuhan
Contoh:
MK02GU-PM-U2-MAV01 -> PM Auxiliary Turbin #1 7D
This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pembuatan Preventive Maintenance

Preventive Maintenance -> Preventive Maintenance

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pembuatan Preventive Maintenance

Klik tombol (+)

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pembuatan Preventive Maintenance

Isikan field mandatory Preventive Maintenance

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pembuatan Preventive Maintenance
Isikan field mandatory Preventive Maintenance

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Pembuatan Preventive Maintenance

Isikan field mandatory Preventive Maintenance

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Frekuensi Preventive Maintenance

Klik tab Frequency

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Frekuensi Preventive Maintenance

Isikan field mandatory

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Seasonal Dates Preventive Maintenance

Klik tab seasonal dates -> hilangkan centang pada Sunday dan Saturday

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Seasonal Dates Preventive Maintenance
Klik Save

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Job Plan Sequence
Tambahkan Job Plan yang akan
muncul setiap sequence-nya
dengan klik “New Row”

CONTOH

14D SKUP . A

14D SKUP . B
Berikutnya
Input Job Plan

14D SKUP . C
Berikutnya

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 47
PM Hierarchy
Tambahkan PM Number yang
termasuk pada lingkup pekerjaan
dengan klik “New Row”

CONTOH

PARENT
WO

Input PM

CHILD WO- CHILD WO-


1 2

CHILD WO- CHILD WO-


3 4
Note :
Biasanya juga dipakai untuk mengakomodir main scope OH

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 48
Aktivasi Preventive Maintenance
Change status -> Active

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Generate Work Order Preventive Maintenance

Klik generate work order -> masukkan rentang waktu penerbitan WO

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Generate Work Order Preventive Maintenance

Work Order terbentuk

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Generate Work Order Preventive Maintenance

Work Order terbentuk

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Modifikasi Preventive Maintenance

Lakukan revisi pada deskripsi -> klik Save

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
Modifikasi Preventive Maintenance
Klik Delete

This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
5. Work Order

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 55
or distribute this document without permission of PLN NUSANTARA POWER, PT
WORK ORDER
PENGERTIAN

Work Order adalah perintah pekerjaan dari perencanaan pemeliharaan kepada


pelaksana pemeliharaan berupa dokumen yang berisi perencanaan aktivitas yang
dilaksanakan, lengkap dengan material, jasa maupun tools yang dibutuhkan serta
terdapat jangka waktu pekerjaan serta target pekerjaan yang perlu dicapai.

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 56
Proses Work Order

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Perencanaan Work Order
Start & finish date Post Maintenance
Special Skills/
Estimated Time & Man Hours

Special Tools

Primary
Parts

Job Scope
Safety Repair
Technical Data History
Checklists (Failure Code)
Procedures

Work Order

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Planning Vs Actual

Safety
Plan

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Type WO
Service Daily meeting WO CM Temuan PM WO PAM
Request

• Operator • All Bidang • Rendal HAR • Teknisi HAR • Rendal HAR


• Project yang • PRK
tidak masuk mengggunakan
RKAP CM
• GL Account
CM
Service Request Daily meeting WO PDM

• CBM • All Bidang • Rendal HAR


(Rekomendasi) Permintaan non- WO EJ
• I-Core Rendal HAR
(Rekomendasi)
• Project yang • Rendal HAR
sudah
tercantum pada
RKAP
Quick WO EM
Reporting

•Operator •Tanpa
melalui
Rendal HAR ECP WO EJ
•Rendal HAR
(Closing)
• Bidang • Rendal
Engineering HAR

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 60
Pembuatan Work Order
Work Order -> Work Order Tracking
User mengisikan/memperbarui informasi yang dibutuhkan, seperti:
1. Nomor dan Deskripsi Work Order
2. Asset dan Location yang dikenai Work Order
3. PRK
4. Work Type
5. Work Priority
6. GL Account (defaultnya akan otomatis terisi)
7. Failure Class dan Problem Code
8. Apakah membutuhkan Safety Approval
9. Person yang ditugasi untuk Work Order tersebut
10. Lead

CATATAN :
1. Setiap Work Type di Maximo sudah terdapat mapping ke GL Account dan Project Control (PRK)

• This presentation is strictly confidential, do not copy anything on this presentation without permission of PEMBANGKITAN JAWA BALI, PT.
WORK TYPE
PRK DAN GL
ACCOUNT

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 62
INTEGRASI GAGAL

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 63
INTEGRASI BERHASIL

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 64
PEMBUATAN WORK ORDER
Tab List
Modul WO Tracking
Tab List digunakan
untuk menampilkan
seluruh data Work
Order di dalam sistem

KLIK
ADD Untuk
membuat
Work Order
baru

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
PEMBUATAN WORK ORDER
Lengkapi Kolom Tab Work Order
1. Nomor WO
2. Deskripsi Work Order
3. Asset dan Location
4. PRK
5. Work Type
6. Work Priority
7. GL Account (defaultnya akan otomatis terisi)
8. Target Start dan finish date
Isikan pada saat
9. Schedule Start dan Finish date peralatan mati /
10. Duration downtime
11. Failure Class (Otomatis muncul sesuai failure
class asset)
12. Problem Code
13. Cek Need LOTO dan Downtime status
14. Person yang ditugasi untuk Work Order
tersebut
15. Isi Job Plan (Bila ada)
16. Lead
17. Work Group
18. Isi Owner group
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
PEMBUATAN WORK ORDER
Tab Plans
Modul WO Tracking
Tab Plans digunakan
untuk menambahkan dan
menampilkan informasi
rencana pekerjaan (tasks)
yang akan dikerjakan oleh
sebuah work order. Pada Skup Pekerjaan
tab Plans ini juga dapat
diinformasikan rencana
penggunaan materials,
labor, tools, services

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
PEMBUATAN WORK ORDER
Tab Safety Plan

Lengkapi kolom
1. Hazard
2. Precaution

Catatan :

1. Precaution akan muncul bila sudah ditambahkan pada


itum hazard di masing-masing unit

2. Apabila ada kekurangan hazard / precaution bisa


menambahkan secara manual dengan klik “New Row”

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
ROUTE FLOW WORK ORDER

APPROVAL WORK ORDER

Status WAPPR Route Status WAPPR Route Status Print JOB Card Menu Activities
APPR (Integration and Tasks
)
• Staf Rendal • SPV Rendal • Staf Rendal • Proses
HAR HAR HAR pekerjaan
dilakukan di
activities and
task
• Kecuali WO
dengan Type
PM langsung
Close di menu
WO

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 69
PRINT WORK ORDER DAN JSA
Langkah Print WO dan JSA
pada WO Tracking :
1. Pilih WO yang akan diprint
2. Pilih Run Reports pada More
Action

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 70
PRINT WORK ORDER DAN JSA
Langkah Print WO dan JSA
pada WO Tracking :
1. Pilih WO yang akan diprint
2. Pilih Run Reports pada More
Action
3. Filter “PNP”
4. Pilih “(PNP) Job Card with
JSA”
5. Akan muncul Print Preview

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 71
PRINT WORK ORDER DAN JSA
Langkah Print WO dan JSA
pada WO Tracking :
1. Pilih WO yang akan diprint
2. Pilih Run Reports pada More
Action
3. Filter “PNP”
4. Pilih “(PNP) Job Card with
JSA”
5. Akan muncul Print Preview
6. Klik icon Printer
7. Isi “PDF” ( Actual Size) dan
All Page
8. OK

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 72
PRINT WORK ORDER DAN JSA
Langkah Print WO dan JSA
pada WO Tracking :
1. Pilih WO yang akan diprint
2. Pilih Run Reports pada More
Action
3. Filter “PNP”
4. Pilih “(PNP) Job Card with
JSA”
5. Akan muncul Print Preview
6. Klik icon Printer
7. Isi “PDF” ( Actual Size) dan
All Page
8. OK
9. Maka terdapat file PDF siap
download

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 73
ACTIVITIES AND TASKS
Tab List Activities and tasks

Work Order  Activities and tasks

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 74
ACTIVITIES AND TASKS

Catatan :
1. Pastikan Need Loto? Apabila tercentang maka Task akan masuk ke PTW Officer (SPV Operasi) dan Status
WPTW
2. Pastikan Safety Plan apakah ada hazard khusus (FMZ). Apabila ada hazard khusus (selain FMZ-ISO) maka
lakukan print PTW (Run Report  Pilih Hazard  Submit  Print Out PTW Hazard Khusus)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 75
ROUTE FLOW ACTIVITIES AND
TASKS

TANPA ISOLASI (FMZ-ISO)


Status APPR Route Status INPRG Route Status COMP Route Status CLOSE

•Staf Rendal •Staf Rendal •Staf Rendal •Staf Rendal


HAR HAR HAR HAR

ISOLASI (FMZ-ISO)
Status APPR Route Status WPTW Route Status INPRG Route Status PTWR Status COMP Route Status CLOSE

• Staf Rendal • PTW Officer / • PTW Officer / • Staf Rendal • Staf Rendal • Staf Rendal
HAR SPV Operasi SPV Operasi HAR HAR HAR
• Dibuatkan • Print PTW
Permit Isolasi Isolasi yang
telah di buat

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 76
CLOSING WORK ORDER
Lengkapi Kolom Tab Work Order
1. Actual Start
2. Actual Finish
3. On Hand Repair Time (Hours)
4. Time Remaining
5. Inputkan Downtime sesuai
Job Card Kembali (Langkah
input downtime)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
CLOSING WORK ORDER
Tab Actuals
Lengkapi Kolom

1. Actual Labor (Nama


Pelaksana)
2. Cek Actual Cost (Otomatis
ketika ditransaksikan)
3. Cek Actual Materials
(Otomatis ketika
ditransaksikan)
4. Cek Actual Tools (Otomatis
ketika ditransaksikan)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
CLOSING WORK ORDER
Tab Log
Modul WO Tracking
Tab Log dapat
digunakan sebagai sarana
komunikasi terkait informasi
tentang Work Order. Tab Log
terdiri dari 2 subtab yaitu
subtab Work Log dan subtab
Communication Log.
Work Log diisi dengan proses
perbaikan atau proses monitoring
pengadaan material atau jasa.

Contoh :
1 Januari 2023 : Berkas
diserahkan ke bidang inventory

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
CLOSING WORK ORDER
Tab Failure Reporting
Lengkapi Kolom

1. Pastikan Failure Class


2. Isi Problem
3. Isi Cause
4. Isi Remedy

Catatan :
Apabila Problem / Cause / Remedy
tidak ada maka dapat dicatatkan
pada Remarks

REMARKS

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
ROUTE FLOW CLOSING WORK
ORDER

CLOSING WORK ORDER

Status APPR Route Status COMP Route Status


CLOSE
•Staf Rendal •Staf Rendal •No-Assignment
HAR HAR
•Pastikan •Pastikan
Task Close material /
jasa sudah
selesai

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 81
6. Safety Plan

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 82
or distribute this document without permission of PLN NUSANTARA POWER, PT
WORKFLOW ALUR PROSES DI MAXIMO
WORKORDER
CREATE
SERVICE REQUEST DAILY MEETING CREATE WO PLANNING TASKS

SPV PROD RENDAL RENDAL

WO APPROVAL REVIEW JSA MAKE JSA

SPV RENDAL RENDAL + COMPETENT PERSON RENDAL

ACTIVITY AND TASKS


WMATL
WO WO
WUNSHUT MAKE PTW
APPR INPROGRES
WPROC, ETC
STAF RENDAL PTW OFFICER

POST
- WO COMPLETE
- WAIT FOR JOB CARD
PTW CLEARENCE MAINTENANCE
TEST
The information contained in this document is strictly confidential. It is strictly
STAF forbidden to use, disclose, copy, modify,
RENDAL PTW OFFICER
PTW OFFICER
or distribute this document without permission of PLN NUSANTARA POWER, PT 83
Isolation
Bertujuan untuk memberi perlindungan dalam pekerjaan yang menuntut suatu
bagian tubuh berada dalam posisi dimana gerakan yang tidak disengaja atau
lepasnya energi berbahaya yang tersimpan dapat menimbulkan cedera atau sakit.

Radiasi

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 84
Hot Work
• Pekerjaan apapun yang bisa menjadi sumber pengapian ketika material yang
mudah terbakar tersedia, atau yang bisa menjadi sumber bahaya itu sendiri jika
material yang mudah terbakar itu tidak tersedia
• Pekerjaan yang melibatkan/menimbulkan api dan percikan bunga api baik
berasal dari gesekan atau obor las, perlu dilakukan pelaksanaan kontrol
terhadap aktivitas tersebut.
• Ijin kerja panas merupakan ijin kerja untuk pekerjaan yang menghasilkan api
atau menggunakan api, dimana lokasi pekerjaan tersebut berdekatan dengan
bahan yang mudah terbakar.
• Setiap pekerjaan dengan menggunakan api terbuka atau sumber panas yang
menghasilkan nyala api atau menimbulkan percikan bunga api pada material di
area kerja

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 85
Working at Height
Aktifitas yang dilakukan pekerja yang membutuhkan pergerakan secara vertikal
naik maupun turun dari suatu platform, yang memiliki resiko jatuh dari atas
ketinggian yang apabila diukur dari base elevation/lantai dasar ke titik jatuh
- Mendirikan Scaffolding
- Bekerja di atas atap bangunan
- Pemasangan cladding/ roofing
- Pekerjaan pemasangan electrical mechanical
- Dll

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 86
Confined Space
Pekerjaan pada suatu tempat yang memiliki konfigurasi yang cukup luas untuk
seseorang melakukan aktivitas/melakukan pekerjaan didalamnya tetapi dengan
ruang akses keluar masuk yang terbatas dalam konteks baik pekerja, peralatan
dan perlengkapannya yang masuk-keluar terbatas dan didesain untuk pekerjaan
yang sifatnya sementara.

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 87
Excavation / Digging
Pekerjaan pada setiap pembuatan rongga atau aktivitas penumbukan di
permukaan tanah dengan memindahkan tanah dan menyebabkan kondisi tanah
menjadi tidak stabil dan beresiko mengenai instalasi didalamnya (jaringan kabel,
pipa gas, pipa air, dll).

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 88
Working Near & Under Water
Pekerjaan yang berhubungan dengan instalasi, konstruksi, atau maintenance yang
dilakukan di atas air atau berdekatan dan pekerjaan di bawah air yang bersifat
khusus, yaitu penggunaan peralatan bawah air yang dioperasikan dari permukaan
air

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 89
Vicinity
Suatu pekerjaan yang berkontak langsung / berdekatan dengan instalasi / jaringan
listrik aktif yang dapat menyebabkan tersengat arus listrik ke dalam tubuh manusia
dan dapat menyebabkan kerusakan pada organ tubuh manusia, terutama kerja
jantung, kontraksi otot, otak, kerusakan jaringan, bakar, bahkan fatality

• Area travo, panel listrik, peralatan/ equipment yang bertegangan dialiri listrik, dll.
• Area terbuka/ tertutup dan di bawah/ di dekat sekitar aliran listrik tegangan tinggi.
• Jaringan kabel yang mengalir tegangan listrik.

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 90
Apa itu JSA?
Suatu program kerja yang terdapat proses mengenali berbagai macam bahaya
dan resiko pada suatu aktivitas pekerjaan dan membuat pengendaliannya
terhadap resiko, bahaya yang telah teridentifikasi.

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 91
Contoh JSA

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 92
Data Master
HAZARD DESCRIPTION
HZCWPPUMP Hazard dari CWP Pump
HZASMSULFAT HAZARD ASAM SULFAT
HZPRMSWITCH Hazard Primary Switch PRECAUTION DESCRIPTION
HZKIMIA RESIKO AREA KIMIA APDBELT Safety belt
HZPANAS RESIKO AREA TERKENA PANAS
HZTINGGI RESIKO AREA KETINGGIAN
APDBRTHG Breathing Aparatus
HZTBKAR RESIKO AREA MUDAH TERBAKAR (RINGAN) APDCLTHG Baju safety
HZLISTRIK RESIKO TERSENGAT TEGANGAN LISTRIK
APDEAR Safety Earplug
HZOPERASI UNIT RESIKO OPERASI UNIT
HZRTUTUP RESIKO RUANGAN TERTUTUP APDFLOAT Pelampung Safety
HZRMASKER GUNAKAN MASKER POLUSI TINGGI APDGLVS Safety gloves
HZDGASBUANG Hazard terhadap kebocoran gas buang
SSKNFSH Sesak Nafas
APDHLMT Safety helmet
MARSKER GUNAKAN MASKER APDMSKRG Masker gas
HZDLICIN AREA LICIN
APDMSKRS Safety Masker
HZDEXP AREA LEDAKAN
HAZARD2 contoh hazard 2 APDRSPTR Respirator protection untuk debu
HZDPOI AREA BERACUN APDSHOES Safety shoes anti slip
HZRDBAU HAZARD BAU
NGOPI HAZARD BELUM NGOPI
MTRCRUSH MOTOR CRUSHER
ARTINGGI AREA TINGGI
HZDTINGI AREA TINGGI
HZDDEBU Hazard debu air inlet filter
HZDBISING Hazard Bising
HZDHTMP HAZARD HIGH TEMPERATURE AREA
HRZCAHAYA INTENSITAS CAHAYA TINGGI
The information contained in thisHZDLMTRL HAZARD AREA
document is strictly confidential. It is LEMPARAN MATERIAL
strictly forbidden BUANGAN
to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA
MILL POWER, PT 93
Pengisian JSA

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 94
Specific Precaution

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 95
Pengisian Permit To Work
• Description
• PTW Status
• Asset atau
Location atau
Asset/Location Non
Maximo (jika
asset/location tidak
ada di Maximo)
• Precautions Taken
• Isolated By
• LOB Key
• Apply Sequence
• Remove Sequence

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 96
Print Out Isolation Permit (LOTO)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 97
6. Downtime

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 98
or distribute this document without permission of PLN NUSANTARA POWER, PT
Report Downtime
• Mencatatkan downtime dan uptime sebuah Equipment
• Bisa dilakukan melalui dua aplikasi, yakni Asset pada Service Request dan Work Order

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Langkah Report Downtime (1)
 Masuk pada modul
Service Request (SR)
 Buat SR baru atau cari SR
yang sudah dibuat pada
list
 Pilih SR yang akan
dimasukkan Downtime
nya

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Langkah Report Downtime (2)
 Masuk ke Go To Assets

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Langkah Report Downtime (3)
 Pada modul
Assets pilih More
Action
 Pada list yang ada
pilih Report
Downtime

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Langkah Report Downtime (4)
 Akan muncul
tampilan pop up
sesuai gambar
disamping
 Masukkan data
Report Downtime
sesuai dengan
kondisi di lapangan

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Manage Report Downtime (1)
 Untuk melakukan
revisi maupun input
Report Downtime
yang baru
 Pilih menu More
Action
 Pilih Manage
Downtime History

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Manage Report Downtime (2)
 Masukkan data yang
diperlukan pada
tampilan pop up
yang muncul
 Kalau sudah selesai
tinggal klik OK

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Work Order
Yang perlu
diperhatikan untuk
Work Order (WO)
 Centang pada Need
Down Time
 WO tidak akan bisa di
complete atau closed
bila Downtime tidak
diisi penyelesaiannya
dulu

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Report Downtime For Asset Up (1)
 Masuk pada modul
Work Order (WO)
 Pilih WO yang akan
dimasukkan
Downtime nya

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Report Downtime For Asset Up (2)
 Akan muncul
tampilan pop up
sesuai gambar
disamping
 Masukkan data
Report Downtime
sesuai dengan
kondisi di lapangan

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Manage Downtime For Asset Up (1)
 Untuk melakukan
revisi maupun input
Report Downtime
yang baru
 Masuk modul Work
Order
 Pilih menu Select
Action
 Pilih Manage
Downtime History

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Manage Downtime For Asset Up (2)
 Masukkan data
yang diperlukan
pada tampilan pop
up yang muncul
 Kalau sudah selesai
tinggal klik OK

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Report Downtime Back Date (1)
Untuk melakukan input
Report Downtime
kondisi back date dapat
dilakukan dengan cara
berikut:
 Masuk pada modul
Service Request (SR)
 Pilih Asset
 Pilih Go To Assets

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Report Downtime Back Date (2)
Pada modul Assets
dipilih:
 Pilih More Action
 Klik Report
Downtime

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
Report Downtime Back Date (3)
Pada pop up
Report Downtime:
 Pilih
Report Downtime
sesuai dengan
gambar disamping
 Masukkan Start dan End
Date sesuai kondisi
real di lapangan
 Klik OK jika data
sudah sesuai

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
7. PRK

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 114
or distribute this document without permission of PLN NUSANTARA POWER, PT
REVIEW PROJECT CONTROL
REVIEW PROJECT CONTROL
Langkah review PRK pada maximo
Klik menu Project Based
Work Order Enter
garis 3 Control

Catatan :
Pastikan PRK yang tercantum atau yang dipakai sudah terdaftar pada Project Based Control

Langkah mendaftarkan nomer PRK


Bidang keuangan unit
Siapkan data PRK Laporkan ke bidang akan berkoordinasi
yang belum terdaftar keuangan unit dengan Divisi
Anggaran PLN NP

Bila disetujui maka


Nomer PRK
akan upload PRK di
muncul di Maximo
Ellipse

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 115
8. IR & PR Ellipse

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 116
or distribute this document without permission of PLN NUSANTARA POWER, PT
Pembuatan Issue Requesitition (IR)
Review Work Order dapat dilakukan dengan membuka program MSEWOT pada Page Navigation

Pada search method, Pilih Exact Match dan masukkan Nomor Work Order yang akan direview. Klik Search, Maka WO akan tertampil pada table hasil pencarian

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 117
Pembuatan Issue Requesitition (IR)
3. Kemudian Klik tombol Expand di sebelah Nomor Work Order hasil pencarian.

4. Klik tombol action --> klik Requisition untuk mengkases program Requisition (MSE140)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 118
Pembuatan Issue Requesitition (IR)
5. Layar dibawah ini berfungsi untuk membuat Requisition. Melengkapi field yang tersedia dan juga pada Tab “General”
 Requisition Type
 District Code
 *Issue Requisition Number
 Date Required By
 Requested By
 Request By Position
 Issue Transaction Type
 Priority Code
 Original Warehouse
 Delivery location
 Work Order

catatan :
* akan tergenerate oleh system ketika Requisition
6. Pada Tab “Issue Details” dapat mengisikan field sebagai berikut selesai dibuat

 Protected Indicator
 Inventory Category
 Delivery Instruction A-B

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 119
Pembuatan Issue Requesitition (IR)
7. Pada Tab “Items”, pilih Lookup MSEWTR untuk memunculkan Plan Material pada Work Order

8. Program MSEWTR akan terbuka untuk memunculkan Plan Material dari Work Order Task. Klik Search

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 120
Pembuatan Issue Requesitition (IR)
9. Pilih Plan Material yang akan dilakukan permintaan dan klik Select and Return

10. Apabila proses diatas selesai dilakukan, maka akan menghasilkan layar seperti berikut. Klik Submit untuk menyelesaikan permintaan

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 121
Pembuatan Issue Requesitition (IR)
11. Nomor Issue Requisition akan otomatis tergenerate dari system. Klik Finalize untuk mengajukan proses Approval sesuai limit Approval yang
sudah ditentukan. Apabila ingin menambahkan material klik pada +Add.

12. Status Requisition berubah menjadi Unauthorised

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 122
Pembuatan Purchase Requisition (PR)
Review Work Order dapat dilakukan dengan membuka program MSEWOT pada Page Navigation

Pada search method, Pilih Exact Match dan masukkan Nomor Work Order yang akan direview. Klik Search, Maka WO akan tertampil pada table hasil pencarian

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 123
Pembuatan Purchase Requisition (PR)
3. Kemudian Klik tombol Expand di sebelah Nomor Work Order hasil pencarian.

4. Klik tombol action --> klik Requisition untuk mengkases program Requisition (MSE140)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 124
Pembuatan Purchase Requisition (PR)
5. Pada tampilan berikut, pilih “Purchase Requisition” pada requisition type

6. Pada tahap selanjutnya, lengkapi field Pada Tab “General”


 Requisition Type
 District Code
 * Purchase Requisition Number
 Date Required By
 Requested By
 Request By Position
 Original Warehouse
 Priority Code
 Delivery location
 Cost Code

catatan : ​
* akan tergenerate oleh system ketika
Requisition selesai dibuat
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 125
Pembuatan Purchase Requisition (PR)
7. Pada Tab “Items” dapat melakukan Klik button (+Add) untuk penambahan item. Terdapat 2 tipe pembelian, yaitu pembelian material (Goods) dan jasa
(Service). Permintaan dapat mengakomodir lebih dari 1 jenis item

Unit Of Measure
Quantity Required
Item Description
Estimated Price

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 126
Pembuatan Purchase Requisition (PR)
8. Apabila proses di atas selesai dilakukan, maka akan menghasilkan layar seperti berikut. Klik Submit untuk menyelesaikan permintaan, Nomor
Purchase Requisition akan otomatis tergenerate dari system

9. Klik Finalize untuk mengajukan proses Approval sesuai limit Approval yang sudah ditentukan. Status Requisition berubah menjadi
Authorised jika user pembuat requisition memiliki limit approval lebih dari total nilai estimasi.

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 127
THANK YOU
TERIMA KASIH

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT

You might also like