PENSWASTAAN PENYELENGGARAAN JALAN-JALAN PERSEKUTUAN

SEMENANJUNG MALAYSIA

ZON : SELATAN
DAERAH : TAMPIN
NEGERI : NEGERI SEMBILAN

PERAKUAN DAN TUNTUTAN BAYARAN BAGI KERJA-KERJA KECEMASAN (KERJA-KERJA SEMENTARA)

BULAN :Disember TAHUN : 2021

NO SEKSYEN NOMBOR TARIKH KEJADIAN/INSIDEN KOS ANGGARAN


BIL NAMA JALAN DAERAH SST 6%(RM) SKOP KERJA
LALUAN (RM)
MULA HINGGA MULA HINGGA

JLN UTAMA FELDA


1 FT1279 JALAN FELDA JELAI 1-4 TAMPIN 08 Disember 2021 15 Disember 2021 RM9,816.00 RM588.96 KERJA-KERJA MEMBERSIHAKAN CERUN RUNTUH
JELAI 1

JLN UTAMA FELDA MEMBAIKI PERMUKAAN BAHU JALAN BERLUBANG


2 FT1279 JALAN FELDA JELAI 1-4 TAMPIN 13 Disember 2021 15 Disember 2021 RM6,362.12 RM381.73 AKIBAT SINKHOLE
JELAI 1

5
JUMLAH DISEMBER 2021 RM16,178.12 RM970.69
JUMLAH DISEMBER + 6% SST RM17,148.81
Saya ingin membuat tuntutan dan mengesahkan bahawa kerja-kerja kecemasan yang Adalah dimaklumkan bahawa saya telah memberikan arahan

spesifikasi di dalam perjanjian dan semua tuntutan mengikut 'Appendix VII- - Schedule langkah sementara. Saya mengakui kerja-kerja tersebut telah siap
of Rates' yang dikemukakan adalah benar dan betul. dilaksanakan dengan sempurna dan menyokong bayaran dibuat

…………………………………………………………………….. …………………………………………………………………
Tandatangan Tandatangan

Nama : TALIB BIN SHANSUDIN Nama :


Jawatan : PENGURUS KANAN KAWASAN NEGERI SEMBILAN Jawatan :
No Kad Pengenalan : 690415-05-5363

Cop Syarikat : Cop Jabatan :


SELIA SELENGGARA SELATAN SDN BHD
Summary Dayworks Record

Project : Penswastaan Penyelenggaraan Jalan - Jalan Persekutuan Di Semenanjung Malaysia Bagi Zon Selatan
State / District : Negeri Sembilan / Tampin Month Dec-21 State / Distric
Route No / Sect. / Road Name : FT 1279/ SECT.JALAN UTAMA JELAI 1/ JALAN FELDA
Date 8.12.2021/15.12.2021
JELAI 1-4

Type of Works : Emergency - Kerja-kerja Membersihkan Cerun Runtuh Time Type of Work

Item Description SOR Unit Per Hour Per Day Qty Rate Amount
LABOUR
1 Ganger 1/1 Day 8 2 3 92.00 552.00

2 General Labourer 1/6 Day 8 2 7 58.00 812.00

3 Flagman 1/8 Day 8 2 2 50.00 200.00


Sub Total 1,564.00
PLANT
1 Low Loader 40 Tonne 1/3 Day 8 2 1 1000.00 2000.00

2 Pick-Up 2/28 Day 8 2 1 330.00 660.00

3 5 Tonne Lorry 2/1 Day 8 2 1 400.00 800.00

4 Long Arm Excavator 3/50 Day 8 2 1 820.00 1640.00

Sub Total 5,100.00


MATERIALS

Supply ONLY Canvas Sheeting "16 x 16 PE


Blue-Orange" or approved equivalent together
with the necessary tools and equipment for the
1 10/a m2 - - 400.00 5.60 2240.00
proper installation(Workmanship measure
seperately and to follow schedule of daywork
rate).

Sub Total 2,240.00


SCOPE OF WORK

Sub Total

TRAFFIC MANAGEMENT EQUIPMENT


1 Guidance Cone 4/59 Per Day 8 2 10 0.90 144.00

2 Temporary Signboard 4/60 Per Day 8 2 6 8.00 768.00

Sub Total 912.00


Grand Total 9,816.00
SST 6% 588.96
Grand Total + SST 6% 10,404.96
Prepared & Certified by ; Verified by ;

………………………………………………………. ……………………………………………………….
Selia Selenggara Selatan Sdn Bhd Jabatan Kerja Raya
F
T

0
8
SELIA SELENGGARA SELATAN SDN BHD 6
Summary Dayworks Record
/
Project : Penswastaan Penyelenggaraan Jalan - Jalan Persekutuan Di Semenanjung Malaysia Bagi Zon Selatan
S
State / District : Negeri Sembilan / Tampin Month Dec-21 State / Distric
e
c
Route No / Sect. / Road Name : FT 1279/ JALAN UTAMA FELDA JELAI 1 DAN JELAI 3 /
Date 13.12.2021/16.12.2021 t
JALAN UTAMA FELDA JELAI 1-4
i
Type of Works : Emergency - Membaiki Bahu Jalan Berlubang Akibat Sinkhole Yang o
Time Type
n of Work
Mendatangkan Bahaya Kepada Pengguna Jalan Raya.

5
Item Description SOR Unit Per Hour Per Day Qty Rate Amount 0
LABOUR .
3
1 Ganger 1/1 Day 8 2 1 92.00 184.00 0
2 General Labourer 1/6 Day 8 2 2 58.00 232.00 /
3 Flagman 1/8 Day 8 2 2 50.00 200.00
L
Sub Total 616.00 a
PLANT l
u
1 Backhoe Excavator 2/10 Day 8 2 1 450.00 900.00 a
n
2 3 Tonne Lorry 4/49 Day 8 2 1 330.00 660.00
S
3 5 Tonne Lorry 2/1 Day 8 2 1 400.00 800.00 e
r
4 Chain Saw - 24" 3/31 Day 8 2 2 110.00 440.00
e
Sub Total 2,800.00 m
b
MATERIALS
a
1 Ditto-Greade 20 concrete(1:2:4)as bedding 2/c m3 - - 10.00 250.40 2504.00 n
Sub Total 2,504.00 -
SCOPE OF WORK
S
i
Sub Total m
p
TRAFFIC MANAGEMENT EQUIPMENT a
n
1 Guidance Cone 4/59 Per Day 8 2 10 0.90 18.00
g
2 Temporary Signboard 4/60 Per Day 8 2 4 8.00 64.00
P
Sub Total 82.00
e
Grand Total 6,002.00 r
t
SST 6% 360.12
a
Grand Total + SST 6% 6,362.12 n
g
Prepared & Certified by ; Verified by ;

………………………………………………………. ……………………………………………………….
Selia Selenggara Selatan Sdn Bhd Jabatan Kerja Raya