Professional Documents
Culture Documents
CORRIGENDUM-01
Extension of Bid Submission Due Date, MSA(Mining Services Agreement) & Clarifications
1. Bid submission due date of the above referred Tender for “Selection of MDO for
Plant” has been extended up to 08.05.2023 1130 hrs IST. Tenders shall be
Srl Docu
ment
Existing Provision Revised Provision
/Pg/
Cl
1. MSA/11 “Effective Date” means the “Effective Date” means the date of signing of
/1.1.25 date of signing of the Mining the Mining Services Agreement(MSA) or 60
Services Agreement or 60 days days from the date of issue of the Letter of
from the date of issue of the Acceptance (LoA), whichever is earlier.
Letter of Acceptance(LoA) However, if CTE (Consent to Establish) is not
whichever is earlier. available on the Effective Date, then the
“Effective Date” shall be considered as the
date on which the valid CTE is made
available.
Page 1 of 3
STEEL AUTHORITY OF INDIA LIMITED
(A Govt. of India Enterprise)
BOKARO STEEL PLANT
TENDER & CLAIMS DEPARTMENT (PROJECTS DIVISION)
ISPAT BHAWAN, BOKARO STEEL CITY – 827001
BOKARO, JHARKHAND (INDIA)
Telephone: +91 6542-240375, Fax: +91 6542-240375/163
Email: bsl.proj.tenders@sail.in
Srl Docu
ment
Existing Provision Revised Provision
/Pg/
Cl
2. MSA/94 The Contractor shall use steel The Contractor shall use such items of
/33 manufactured by Steel Authority steel as are manufactured by Steel
Authority of India Limited (SAIL) and which
of India Limited (SAIL) and which are required for execution of all civil and
are required for execution of all building structural work including sheeting,
technological structures, pipelines, etc.
civil and building structural work Such items of steel as are made by SAIL
including sheeting, technological and required for the work shall be
procured from SAIL-Stockyards / Plants.
structures, pipelines, etc. Such
To ensure availability of steel items
items of steel as are made by required for the Facilities, the Contractor
has to give at least 1(one) month advance
SAIL and required for the work
intimation of such requirement. However,
may be procured from SAIL- in case of non-availability of steel from
SAIL-Stockyards, the contractor shall be
Stockyards / Plants. To ensure
free to procure steel materials from
availability of steel items various other integrated Steel producers by
giving 04 weeks’ notice to SAIL.For
required for the Facilities, the
technological structures, no clearance is
Contractor has to give at least required from SAIL before procuring steel
from other integrated steel producers.
1(one) month advance intimation
of such requirement. However,
in case of non-availability of
steel from SAIL-Stockyards, the
contractor shall be free to
procure steel materials from
various other integrated Steel
producers by giving 04 weeks’
notice to SAIL.
Page 2 of 3
STEEL AUTHORITY OF INDIA LIMITED
(A Govt. of India Enterprise)
BOKARO STEEL PLANT
TENDER & CLAIMS DEPARTMENT (PROJECTS DIVISION)
ISPAT BHAWAN, BOKARO STEEL CITY – 827001
BOKARO, JHARKHAND (INDIA)
Telephone: +91 6542-240375, Fax: +91 6542-240375/163
Email: bsl.proj.tenders@sail.in
2 Last date and time for submission of Proposal 08.05.2023 1130 hrs
IST
CGM(P)/ Commercial
SAIL/BSL
Page 3 of 3
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
1 Clause 8.1 8.1 Commencement of Commercial The commercial production date is 37 months from To mitigate, the following amendment can be undetaken Given the scope of work, Project will involve major Gua Iron Ore Mine is a working mine having production capacity No change from NIT.
MSA, Pg. No. 37 Production effective date of MSA. The Milestones of Project are in the agreement: capital investment. In the current scenarion there is of 4 MTPA. Crushed ROM is transported through a series of
(a) Commercial Production period Crushing Plant, Beneficiation Plant, Palletizations Plant no scope for MDO to generate any revenue during downhill conveyor to loading plant and subsequenlty loded in to Clarification Only
shall start from 37th month from the with interconnecting conveyors from Primary stockpile. I. The commercial production date can be split into Three intial construciton period of 3 years which is very Wagons.There is no alternate evacuation transport road form the
“Effective date”. During this construction Period, MDO has no obligation Milestones without changing the overall construction risky from project financing point of view. MDO earmarked mining area to new loading siding. Also the
for interim Mining at GOM and hence it will have no period. present EC does not have permission for interim mining with road
revenue during this period. Milestone 1: MIning of suitable quantity and product size transportation.Hence option of Interim mining for MDO is not
Consequently, MDO is exposed to very high Working after mutal discussion, feasible logistically as well as statutorily.Further mining fee "M1 &
Capital requirement. This may lead bidder to quote Milestone 2: Construction of Crushing Plant and M2 " will not be applicable in case of interim mining as it also
higher. Milestone 3: Construction of Beneficiation Plant & covers Beneficiation and loading .
Hence, for the fair price discovery, we suggest to add Pelletization Plant
provision of interim mining in the agreement wherein
during construction Period, MDO may undertake the II.During construction of crushing plant, the Mining,
MIning and supply Iron Ore at Mine Pit to SAIL. crushing & Screening to be allowed with HEMM and
Mobile Crushing & Screening Plant for which Mining Fees
(M1 & M2) as described in clause 9.2 will be applicable.
2 Clause 25.1 Delay in Commencement of We understand that the total period of construction The total construction period is 36 months from the Effective No change from NIT.
MSA, Pg. No. 76 Commercial Production shall be 6 years including extension for whatsoever Date of Contract. In case extension of Constrcution Period beyond
reasons as mentioned in the agreemnt. 36 months due to non-performance on part of MDO, SAIL shall be Clarification Only
Please confirm. Further, indemnification of Loss of indemnified for the damages including Loss of Profit.
profit is not on euitable basis and hence we request you - -
to please remove such condition.
It is requested to remove the word “Loss of Profit”. Clarification provided above No change from NIT.
- -
3 Clause 6.1 6.1.1.3 Indenting of Railway Wagons We understand that the payment of mining fee is linked Request you to Include following provisions for Project requires huge capital investment and hence SAIL is operating five integarted steel plants and is commited to No change from NIT.
MSA, Pg. No. 20 with quantity of lumps, fines and pellets dispatched. compensating the MDO in case of non take-off: to make the agreement equitable and financial off take iron ore lumps & fines and pellets, comensurate with
and Since, MDO does not have control over dispatch, bankable it is prudent to include clauses which Production plan (Annexure -3 of Draft MSA). Clarification Only
therefore SAIL should take full responsibility for 1. If the MDO meet the quarterly target and GOM fails to balance the obligations of SAIL and MDO.
Clause 9.5.2 9.5.2 Liquidated Damages for shortfall dispatch. provide sufficient rake/buyers truck for final dispatch, 90%
MSA, Pg. No. 54 in Quantity of the respective Fees to be paid based on weighment at Further, Liquidated Damages are already applicable
Further in case of non-offtake by SAIL, MDO is exposed stockpile for the un dispatched ore and remaining 10% to on the MDO as per Clause 9.5.2 of MSA for shortfall
to huge financial burden considering the investment be adjusted during final dispatch. in quantity, the costing of the project has to take
requirement for the project. Hence to make the this into consideration and accordingly, the capex
agreement financially banakble it is suggested to include 2. Further in any case, If SAIL offtakes less than 90% of the deployment is done considering certain level of
the provisions for damages on SAIL in case of scheduled quarterly quantity in any quarter, then SAIL will revenue realization at certain production levels.
nonofftake. pay 35% of the Mining fee (towards fixed cost) for the
difference of quantity between 90% of the scheduled In case of non-offtake, MDO receives zero payment.
quarterly quantity and quantity actually offtaken by SAIL Therefore, we request you to incorporate
in that quarter. compensation for reduction in offtake.
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
Additionally We request to amend the Supplied quantity % No change in NIT No change in NIT
criterias as follows:
>If the Supplied quantity is 90%, LD NIL
>If the supplied quantity is 80% to < 90%, LD – 5%.
>If the supplied quantity is < 80%, LD – 10%.
(Common for Fines, Lumps, Pellets)
5 Clause 9.5.2.1 9.5.2.1: Damages for failure to We understand that natural occurance will dictate the Request you to redraft the clasue as follows: At the start of every commercial production year, SAIL and MDO No change from NIT.
MSA, Pg. No. 55 remove Overburden/Inter-burden: mining of OB/IB/SG and during operation unforeseen During the course of Mining, encountering OB/IB/SG will shall jointly draw out the annual operational plan outlining the
circumstances may arises due to which quantities of be based on Mining Plan. The stripping ratio of OB:ROM Quantity of Overburden/ inter burden removal & Dumping Clarification Only
OB/IB/SG may vary compared to what is stated in Mine will be reviewed on actual basis and therefore, variation of Schedule for GOM (Refer Clause 8.3.2.1 (ii)). Since the Quantity
Plan. Hence we request you to please consider ±10% quantity from the quarterly target should not of Overburden/ inter burden will be mutually agreed between
amending this clause and allow variation of atleast 10%. attract any Liquidated Damage. SAIL and MDO on yearly basis, the occurrence of the waste rock
i.e. variation of ±10% quantity from the quarterly target If the variation is more than 10%, approval of Mines will be fairly known to both the parties. Further, MDO can make
should not attract any Liquidated Damage on MDO. Manager GOM shall be obtained on the recommendation up the shortfall within 9(nine) months immediately following the
of local committee constituted by Mines Manager. The year in which the relevant shortfall occurred (refer clause 9.5.2.1).
committee should have member of GOM & MDO.
6 Clause 9.5.3 & Penalty for shortfall in Chemical Request you to Include following provisions in this clause: As per current LD clauses, MDO will incur heavy Lumps , Fines & pellets are to be used in our steel plants. So, No change from NIT.
9.5.4 Quality Parameters Rakewise penalty for shortfall is very stringent Rake wise Liquidated Damage collected from MDO for penalties for not meeting the quality criteria for maintaining rake wise quality is almost importance for mainating
MSA, Pg No. 55-59 considering the the Clause 8.7.2 where we know as a Slippage in Physical and Chemical Parameter, shall be every individual rake dispatched from its loading optimun blast furnace productivity. Accordingly intensive Clarification Only
fact that ore characterization and beneficiation test reconciled on the weighted avergae basis for the total plant. beneficiation has been envisaged to get the desired quality of
work was done in year 2009. Selective mining of high supplied quantity at the end of each quarter and However if the MDO makes up for the deviation in lumps, fines & pellet grade concentrate. So, reconcilation of
grade continued thereafter, which has resulted in accordingly any additional Penalty/ LD shall be refunded entire quarter, it shall not be penalized. quality on the weighted avergae basis at the end of each quarter
dilution of average ROM feed grade. Hence we request to MDO. can not be considered.
you to please consider reconcilation of quality on the
weighted avergae basis for the total supplied quantity at
the end of each quarter. Kindly amend the clause
accordingly.
7 ANNEXURE-1 General Query Please clarify that during area grading work- Iron ore having Fe grade less than 45% shall be considered as No change from NIT.
SCOPE OF WORK 1. If Iron Ore is encountered, can it be stacked waste. Ore having Fe % more than or equal to 45% will be fed to
ITT, Pg. No. 90 separately and considered as Direct Ore. plant for subsequent beneficiation . The encountered ore can be Clarification Only
2. The OB/SG encountered can be considered as Mine considered as DO , if its Fe grade conforms to required quality
- -
Handling quantity. norms as per MSA clause8.3.4 (a). Subgrade generated will be
3. What will be the location for storage of OB/SG etc. blended with high grade ore and will be fed to beneficiation plant.
waste will be dumped in the earmarked waste dumps as per the
approved mining plan.
8 EC Amendment_ General Query As per latest EC Dt. 06/11/2020 approved EC sanctioned As per current EC conditions and tender terms SAIL SAIL-3.0 MTPA of ROM. No change from NIT.
Duarguiburu_ capacity is 12.5 MTPA (7.5 MTPA ROM + 5 MTPA fines). will have to mine 3 MTPA (0.5 MTPA ROM + 2.5 MDO-7.0 to 9.5 MTPA of ROM & 2.5 MTPA of Dumps fines.
SAIL_06.11.2020 As per tender MDO mining Target is 9.5 MTPA (7 MTPA MTPA Fines) Quantity of ROM ore to be mined by MDO will vary from 7.0 to Clarification Only
ROM + 2.5 MTPA Dump Fines) and SAIL Departmental Which will increase the dump fines quantity in 9.5 MTPA depending upon quntity of dump fines available for
and mining target is 3 MTPA overall material to be processed by MDO at its mining by MDO. So, the present EC will be required to be modified
screening, beneficiation plant. for 12.5 MTPA of ROM.
ANNEXURE-1 If the same EC conditions are to be followed, then please Responsibility of design and engineering is with the MDO.
SCOPE OF WORK clarify the distribution of the SAIL departmental mined Detailed material balance chart is required to However, design, location alignment etc have to be in line with
MSA, Pg. 100 ore (ROM + Dump Fines) understand the exact project requirements i.e., approved documents/ drawings of environment clearance, mining
capacities of Dump hopper, C&S Plant, Screening Plan, forest clearance etc.
Detailed material balance chart is required to plant, Beneficiation plant MDO shall comply with the terms and conditions stipulated in the
understand the exact project requirements i.e., Mining Lease, Approved Mining Plan, Environment Clearance and
capacities of Dump hopper, C&S Plant, Screening plant, Forest Clearance.
-
Beneficiation plant. All the capacity parameters mentioned in MSA have to be
complied with by MDO.
For the requested information, kindly refer to the documents
provided as per NIT e.g approved mining plan, Geological report.
DPER prepared by MECON/FR prepared by CET can be referred
(Only Technical Portion). The MECON DPER/CET FR will be treated
as indicative and for guidance of the bidder only. Kindly note that
,in the envisaged MDO scope, there is slight deviation from the
scheme as mentioned in MECON DPER. The location of primary &
secondary crushing plant is shifted located towrds MDO area ,
according conveyor routing changed up to primary stock pile.Also
Dry disposal of tailing has been envisaged in MDO scope.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
9 Clause 6.1.3 Non-Obligation We understand that if the agreement is terminated We request you to please amend the clause and provide This project will require immense captial investment. For extension of mining lease, there is provision for Govt No change from NIT.
MSA, Pg. No. 22 & It is further clarified that SAIL shall not under this clause then SAIL shall purchase the MDO's reference to the termination payment to be received by Since renewal of the lease is in SAIL scope and MDO companies under MMGC rule.
Clause 19.2 Page be held responsible or liable to the Asset as per clause 28. the MDO. has no control over it. Clarification Only
no. 73 MDO for any termination or SAIL should provide confidence to MDO for its
revocation or non-renewal of the Further, we request you to please amend the clause 28 19.2 In case of premature termination of lease for any investment security.
mining lease by the competent as mentioned in our queries reason but no fault on the part of MDO, this agreement
authority. shall also stand terminated without any financial
implication to either party. In this case MDO shall receive
19.2 In case of premature termination Termination Payment as mentioned Clause 28.
of lease for any reason but no fault on
the part of MDO, this agreement shall
also stand terminated without any
financial implication to either party.
10 Clause 6.2.1.1 Approvals It is understanding that charges related to FC, EC, CTO, Already confirmed vide clauses 1.1.61, 6.2.1.1 of MSA. No change from NIT.
MSA, Pg. No. 24 …...................... CTE and any other statutory approvals, shall be
SAIL will reimburse lease renewal reimbursed to MDO. Clarification Only
charges, license fees for obtaining Please confirm
CTO and any other statutory fees
11 Clause 18 18 MDO’s ACCESS TO MINE SAIL should ensure that the departmental mining and No change from NIT.
MSA, Pg. No. 73 crushing activities of SAIL should not hinder the SAIL departmental mining will ensure 3 MTPA ROM as mentioned
obligations of MDO under this agreement. Please in MSA. Further, the area of operation for both MDO and SAIL will Clarification Only
- -
confirm. be separate.
12 Clause 6.2.1.7 List of New Equipments/ Health of It is requested to remove the condition of new equipment.
MSA, Pg. No. 24 Equipment / facilities Instead MDO undertakes to always maintain the plant and
machinery in good and safe operational conditions for the
New equipment / facilities shall be - fulfillment of obligations under this agreement as per - NO change from NIT. NO change from NIT.
installed by MDO for Crusher with clause 22.2
drives, Screens with drives, Conveyor
System….....
13 Clause 6.2.3.2 Obligations to Change in Ownership We request you to please remove the clause 6.2.3.2 (i) &
MSA, Pg. No. 33 i. The MDO shall not undertake or (ii) which states that MDO shall not undertake or permit
permit any Change in Ownership in it any change in ownership in it except with the prior written
except with the prior written approval - approval of SAIL instead initimation to SAIL should be - NO change from NIT. NO change from NIT.
of SAIL. considered sufficient.
14 Clause 8.4.2 & Physical Parameters Please clarify, what is the meaning of MDO'S Plant In GUA mine , SAIL is operating 4.0 MTPA capcaity Ore handling No change from NIT.
8.4.3 Chemical Parameters mentioned in this clause ? plant. SAIL will continue to operate its crushing plant up to
MSA, Pg. No. 40 secondary crushing stage . The secondary crushed product of SAIL Clarification Only
The Lumps and Fines produced from plant will be subsequently fed to MDO beneficiation plant. So,
the MDO’s plant - - product from MDO plant means product generated from
beneficiation plant installed by MDO.
15 Clause 8.7.1 …................................... The cost incurrered by SAIL towrds beneficiation Clause should be amended as following -
MSA, Pg. No. 43 The cost incurred by SAIL towards amenability test should not be adjusted in the mining 8.7.1.…...............The cost incurred by SAIL towards
beneficiation amenability test will be fee Since it can not be foreseen at the time of bidding beneficiation amenability test will be adjusted in mining
adjusted in mining fee.. and should be termed as unforeseen circumstances. fee for respective product of MDO. Based on the
…................................ Beneficiation amenability test, the chemical quality
Also the clause is unjustified when on the one side SAIL parameter of Lumps, fines and pellets as mentioned in
is requiring adjustment in mining fee based on clause 8.4.3 may be reviewed by SAIL.
amenability test, it is not willing to provide any price 8.7.2 The ore characterisation and beneficiation test work - NO change from NIT. NO change from NIT.
implcation in case of any variation in the confirmatory was done in year 2009. Selective mining of high grade
test as mentioned in Clause 8.7.2. continued thereafter, which has resulted in dilution of
average ROM feed grade. Therefore.............Price
Hence the clause should be amended suitably. implication, if any, on account of results of confirmatory
test work will not be allowed based on the mutual
discussion. Implication on quality of products will be
mutually agreed between MDO and SAIL.
16 Clause 8.7.1 The ore characterisation and The mechanism as detailed in this clause shall be done Area like Gojaphar, allocated to MDO is unexplored at present. No change from NIT.
MSA, Pg. No. 43 beneficiation test work…............ pre bidding stage or post bidding stage? SAIL is in process of getting the exploration done. Hence, this
Please clarify. - - clause is applicable post bidding stage. Clarification Only
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
17 Clause 8.4.3 Chemical Parameters Request you to please tie up the quality of the the Minimum quality of pellet shall depend on the feed grade Intensive beneficiation plant has been envisaged for processing of No change from NIT.
MSA, Pg. No. 41 The finished pellets from the MDO’s Pellets with the quality of the feed grade of Iron Ore of the Iron ore and hence must not be constant ROM to get the desired quality of lumps, fines & pellet grade
pellet plant shall conform to following instead of keeping the pellet quality parameters fixed for throughout the life of project and the chemical concentrate. Additionally quality parameters can be review as per Clarification Only
chemical parameters the entire duration of the agreement. There should be a parameters provided for pellet in the tender is indicative MSA clause no. 8.7.
provision of quarterly declaration of the quality of Feed only.
material basis quality of ROM and accordingly Quality of
the Pellets may be declared. Please modify the clause
accordingly. -
18 Clause 9.2 (x) cost towards procurement of the Since Explosives shall be provided by SAIL and the cost For Project cost estimation Explosive procurement rate is Rs. 76087.10/Ton of SME/SMS No change from NIT.
MSA, Pg. No. 49 explosives of procurement of the explosives shall be recovered exclusive of accessories like detonators, boosters etc.
from MDO, we request SAIL to please share the current - Refer copy of present PO enclosed. Clarification Only
explosive contract or procurement rate.
20 Clause 9.5.1 Liquidated Damages for delay in LD for delay in completion of project shall be computed No change from NIT.
MSA, Pg. No. 53 completion of project daily basis? Please clarify
Regarding LD for delay in completion of project, kindly Refer MSA
Additionally, LD for delay in completion of project and Clarification Only
clause 9.5.1.2 . LD for delay in complertion of project and shortfall
shortfall in quanity must not be applicable
in quanity is not applicable simultaneously.
simultaneously. - -
LD for project delay i.e. delay in start of commercial production
and LD during commercial production on shortfall quantity are
separate.
21 Clause 9.5.4.6 SAIL Supplied ROM No penalty should be applicable on MDO in case Any deviation in Physical and chemical parameters SAIL will only supply crushed ROM, which will be subsequenlty No change from NIT.
MSA, Pg. No. 59 departmental material do not conform the quality, of SAIL supplied ROM will alter the weighted average beneficiated by MDO. MDO has to ensure that
physical and chemical parameters and quantity. Please quality of the material to be loaded by MDO in rakes. beneficaitionshould be carried out to such extent to achieve the Clarification Only
confirm. Which will be the base for payment to MDO desired grade of products. Also, Quality of SAIL ROM will also be
measured at the recipt end by MDO. So low grade SAIL ROM can
-
be discarded prior to feeding in to MDO beneficiation plant.
Hence, on account of quality there can not be any change from
NIT. However, concern regarding shortfall in quantity of SAIL ROM
is addressed under MSA clause 9.5.4.6.
23 Clause 15.4 SAIL shall hold lien against the This clause is ambiguous about having lien against the
MSA, Pg. No. 67 properties of MDO for its claim. properties of MDO, Which in our view should be limited to
concerned project only.
No change in NIT No change in NIT
- Hence we request to amend this clause as following- -
15.4 SAIL shall hold lien against the properties of MDO
(particular to this project only) for its claim.
24 Clause 17.2 Insurance Cover As per this clause MDO has to take insurance for goods. No change from NIT.
MSA, Pg. No. 70 (d) liability to third parties for goods Please clarify if the goods means products such as
or property damage lumps, fines and pellets and if so please suggest the Clarification Only
Products i.e. lumps, fines and pellets should not be considered
mechanism of insuarance since the ownership of the - -
under preview of goods.
products lies with SAIL.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
25 Clause 19.1 Suspension of work If the reason for suspension is not attributable to MDO If the reason for suspension is not attributable to MDO No change from NIT.
Clause 19.1 of MSA is amply clear regarding the responsibility and
MSA, Pg. No. 73 then MDO must be excused from its obligation under then MDO must be excused from its obligation under this
it only says about the applicabilty of this clause on default of
this agreement and LDs should not be applicable. Please agreement and LDs should not be applicable. Clarification Only
MDO.
confirm
26 Clause 20.1 Variations to be approved by SAIL variation if any as directed by SAIL, then the financial
MSA, Pg. No. 74 implications of such variation should be evaluated and any
- - No change in NIT No change in NIT
additional scope shall be suitably compensated to MDO
27 Clause 26.1 No Fault Termination Clause 26.1 is not acceptable and must be removed
- - No change in NIT No change in NIT
MSA, Pg. No. 74
28 Clause 26.3 Termination due to Force Majeure Instead of other party, either party should be able to No change from NIT.
MSA, Pg. No. 78 ….............................. terminate the contract if the force majeure exceeds a
"Other party" has been used with refernce to the affected party.
the other Party may immediately - continous period of 6 months in a year - Clarification Only
terminate
32 ANNEXURE-1 MDO has to install, operate and SAIL is insisting on only straight grate technology, we Since, MDO has to carry out test studies before EC has been granted for travelling grate techology i.e. Straight No change from NIT.
SCOPE OF WORK, maintain 4 MTPA Pellet plant based may face limitations in achieving the quality parameters commencement of the project, MDO shall install the grate technology.
MSA, Pg. No. 110 on straight grate technology like CCS, SIZE, Porosity, and other metallurgical pellet plant utilizing the suitable technology on the basis Clarification Only
properties of test results.
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
33 ANNEXURE-1 Dry disposal of tailings in to tailing Disposal of tailings may be allowed in paste form also. Dry disposal has been considered to minimise the make up water No change from NIT.
SCOPE OF WORK, dam…...... Please confirm requirement with due consideration of the available water
MSA, Pg. No. 103 withdrwal permission at GOM. Further availability of land and EC Clarification Only
permission for disposal of paste is not there.
34 ANNEXURE-1 Furnace Oil MDO may be allowed to install producer gas plants in No change from NIT. No change from NIT.
SCOPE OF WORK, place of furnace oil, as alternate fuel.
MSA, Pg. No. 112 Please confirm
35 Clause 12.2.2 Process Description Pellet plant requires additives like limestone, antharasite Rake transportation of Additives will not only save For surface lease there is no land use plan. No change from NIT.
MSA, Pg No. 111 The additives (limestone, bentonite coal/ coke fines, bentonite, and furnace oil. on transportation cost but also reduce the carbon
and coke breeze) will be received by MDO proposes to bring these materials by rake and footprint of the project As per railway approved DPR, no tippling or track hopper has been Clarification Only
truck….... MDO to be allowed to install wagon tippler in the considered. On an average about 5 rakes (BOXN wagons) of
…........................ railway yard. fluxes will be received every month for which manual unloading
Also we propsoe to bring the furnace oil by rake, MDO has been considered.
shall make necessary arrangement to decant the
furnace oil rake. Further, as per railway approved DPR, due to space constraints, it
Please clarify is not feasible to set up Fuel Oil decanting terminal at the
identified site and the volume of traffic is very low, movement of
LSHS by rail is not considered.
36 Clause 8.7.2 MDO shall carry out confirmatory ore Bidder to share the bench as well as pilot scale test work report. No change from NIT.
MSA, Pg No. 44 characterization, its beneficiation and
pelletising test works …................... Clarification Only
-
MDO shall demonstrate the pilot scale
studies….... Test work for beneficiation and pellet of lab tests can be
shared, not pilot scale.
37 Minimum quantity of pellet as asked The target and penalties for quality and quantity can be Quality may be reviewed based on test work (refer MSA clause No change from NIT.
under Annexure-3 shall be adhered to. - accepted only after testwork. 8.7.2) , but bidder has to meet the minimum quantity of pellets
as per Annexure-3. Clarification Only
38 Clause 12.2.2 …...............................will be MDO shall not be compelled to reimburse the charges fr No change from NIT.
MSA, Pg No. 62 reimbursed by MDO to SAIL-BSL-GOM the overseas expert deployed by SAIL
in case it is payable by the Employer The clause is amply clear. Unless the payment is mandatorily Clarification Only
(SAIL-BSL-GOM) for deployment of required to be paid by the Employer i.e. SAIL on behalf of MDO for
such overseas experts. engagement of Foreign expert for the said project, then only it will
be liable to be reimbursed by MDO to SAIL.
39 Clause 8.4.3 The Lumps and Fines produced from The reduction in Fe is acceptable limit is 63%, No change in NIT No change in NIT
MSA, Pg No. 40-41 the MDO’s plant shall conform to accordingly the gaunge content should be 6.5% instead
following chemical parameters of 5.5%
40 Clause 4.9.3 MDO will withdraw water from … What is the existing water requirement of the GOM? For required information, Kindly refer feasibility report for No change from NIT.
ITT, Pg No. 48 …...................................... How much water will be available out of 4.16MCM to availability of water as provided with NIT documents. Design and
Water withdrawal permission from MDO? engineering is the responsibility of bidder. Water requirement for Clarification Only
Karo River for 4.16 MCM on annual MDO is to be accessed by bidder.
basis has been granted by Govt. of Present water consumption enclosed.
Jharkhand.
41 6.2.1.13 Land for Township Till MDO constructs their own township, We request to No change from NIT.
MSA, Pg. No. 27 Land for township/ accommodation provide the accomodation at the SAIL township.
shall be arranged by MDO We request SAIL to spare some flats that can be Clarification Only
provided to MDO on chargeable basis. As of now there is no availability of quarter ans MDO has to make
its own arrangement.
Additonally, if possible any vacant land parcel land
available with SAIL-GOM can be provied for MDO's
township and other facilities.
42 6.2.1.14 Land for Infrastructure facilities at GIOM has to give the clear land including forest No change from NIT. No change from NIT.
MSA, Pg. No. 129 GOM clearance for any facility which fall beyond mine lease
area to MDO for installing their facilities.
43 6.2.1.16 MDO Responsible for Mine Closure MDO to adhere to the Mine plan for the purpose of MDO has to adhere to approved mining plan. Regading No change from NIT.
MSA, Pg. No. 28 progressive Mine closure. However, any new law, rules applicability of change in law ,refer MSA clause 31 .
- and regulation, notification, policy or any new order shall Clarification Only
be considered as change in law.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
44 6.2.1.17 Security & Safety Security of the project is the sole responsibility of the MDO liability will be limited to its working area allocated within No change from NIT.
MSA, Pg. No. 28 MDO, instead since SAIL has department working and the leasehold & surface rights of GOM and its own assesst .
assets within the mining lease Clarification Only
-
We request SAIL-GOM to consider changing this clause
and restricting the security obligation of MDO to its own
assets only.
45 Clause 4.7.1 Selection of Mining Block As per EC and Mining Plan, the in-pit mining for ROM is For required information, Kindly refer approved mining plan and No change from NIT.
ITT, Pg. No. 44 concentrated in Durgaiburu Iron Ore Mining Lease geological report, as provided with NIT documents.
(1443.756 Ha). However, as per scope of work, Mine planning & Design, is the responsibility of bidder. Yearwise Clarification Only
Production @ 3.0MTPA of ROM from existing working development and production plan as well as waste dump
pit located in OT Hill & North Eastern part of HD Buru management plan has to be prepared by MDO.
and Rajaburu area of the Durgaiburu lease hold of GOM Refer Demarcated working area of SAIL and MDO enclosed.
to be continued by SAIL departmentally with existing
infrastructure. HD Buru area (South Eastern Part), Bai
Hill, Ranichua, Darbarburu, and Gojaphar to be given to
MDO for expansion of GOM.
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
47 Clause 4.8.1 4.8.1 Mining Plan 1.Current Mining Plan is approved up to the year 2023- Responsibility of Approval of mining plan lies with SAIL. MDO has No change from NIT.
ITT Pg. No. 45 24. Please clarify whether MDO will be allowed to to approach SAIL for modification if required. The required
modify the mining plan if need arises. modification has to be mutually agreed by SAIL & MDO. Clarification Only
2.Any future modifications in Mining Plan will be Mining plan will be prepared Jointly by SAIL & MDO.
carried out jointly by MDO and GOM or will be done Selection and sizing of HEMM will be done by SAIL & MDO for
solely by MDO or SAIL. Please Clarify. their respective mining area. SAIL & MDO mining area
Also, GOM will give notice to MDO whenever, any are clearly demarcated, so mine illumination has to be
modification to the approved Mining Plan is envisaged. maintained by SAIL & MDO separately for their exclusive mining
3.The size, capacity of HEMM selection will be done by area. Regarding power connection, Kindly
MDO or GOM. refer Scope of work (Annexure-1) "the battery limits for electrical
4.If there is delay in approval in Mining Plan and supply".
thereby fresh area allotment (from Forest Department) Refer land use plan and plan demarcating areas for SAIL and MDO
for lateral development of Pit is delayed. The shortfall in enclosed.
production or excess production of OB will be
compensated or target will be revised for subsequent
month/quarter.
5.Illumination survey of the Pit, Haul Road etc. will be
scope of MDO or GOM. Kindly share illumination plan of
GOM.
6.The electricity/Power connection up to mine pit is
available or fresh overhead line is required to be laid.
7.Please provide location of (marked on map) nearest
point from where power can be sourced for mine
lighting.
8.Will there be common infrastructure for the area
where GOM will work and MDO area of work.
9.Please clarify whether the GOM have exemption of
48 Clause 4.8.2 4.8.2 Forest Clearance Please Clarify : 1) The entire Durgaiburu lease is segregated in two portions, No change from NIT.
ITT Pg. No. 45 1.Obtaining FC till handover of Forest area will be in the Northen side area will be operated by GOM and the Southern side
scope of GOM during the LOM. In case of delay, in area will be operated by MDO as per land use plan. Presently out Clarification Only
obtaining FC, how the impact on project will be of 1443.756 Ha, FC for 635.986 Ha have already been obtained.
evaluated. Out of 635.986 Ha a portion has been deputed for MDO
2.The various schemes required to be maintained as per operation however, remaining aea i.e., 807.77 Ha (out of
the condition of FC is implemented or under 1443.756 Ha) is alloted to MDO in which presentlmy GOM is
implementation. preparaing for exploration which will take around 1one and half
3.In future, the implementations of various scheme years, After completion of exploration MDO will have to take all
stipulated in FC conditions will be the responsibility of necessary clearances and approval in onbtaining FC, EC & MP and
MDO or GOM. other statutory permission through SAIL-BSL/GOM. In the existing
635.986 for which the FC has been obtained, necessary phase
wise land release , tree enumeration , tree felling has to be
obtained for the portion alloted to MDO through SAIL-BSL/GOM.
2) THe condition in connection with 635.986 Ha for which FC-2
has been obtained, and most of them have been complied and
some of the conditions like reclamation and rehanbilitation ,
safety zone fencing are under process.
3) In future all the statutory conditions related to safety format,
environment and other statutory bodies are to be complied by
MDO through SAIL-BSL/GOM.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
49 Clause 4.8.3 4.8.3 Environment Clearance 1.Please confirm that Obtaining EC including Public 1. EC is obtained. No change from NIT.
ITT Pg. No. 45 Hearing etc. will be scope of GOM. 2. Topographical map is shared.
2.Please share information regarding, any area which 3.CTE / CTO is already obtained and provided. Modifications, if Clarification Only
has been identified for establishment of infrastructure required in CTE/CTO will be done by MDO through GOM.
required for expansion of the project. Please share the 4. At present in surface lease we have installed three nos. of water
contour map. harvesting system. However, MDO has to make a detail plan for
3.CTE/CTO applied or awaited – Please provide status of water harvesting and also implement the same within mining
the same. lease or surface lease.
4.Rainwater Harvesting Scheme approval copy along 5. Presently we are doing these through JSPCB quaterly. In future
with Map showing the no. of ground water charging all the quality study as desired in statutory conditions will be done
pond. The map showing the well/hand pump station, by MDO.
piezometer installation. 6. Already certain measure have been taken by GOM if addtionally
5.Please share the details of the external agency doing require, MDO to take up.
the Air quality study, downstream water quality study. 7. Grid S/S, Ulijhari, Chaibasa, Jharkhand
In future, whether this study will be done by MDO or
GOM, please clarify.
6.If by the condition of MOEF&CC, any Scientific study
required to be done for downstream sediments traps,
dump slope study, pit slope study to determine the
factor of safety will be under the scope of MDO or GOM.
7.220 KV Power allotment approval is from which Grid.
51 Clause 6.1.5 6.1.5 SAIL’s Rights More clarification required on quantum of CSR No change from NIT.
MSA Pg no. 23 activities, to assess cost implications. CSR Policy and activity Plan will be shared annually wherein MDO
(a) Assistance and guidance in CSR has to assist SAIL in implementing the same. Clarification Only
activities. Request you to Please share the CSR Plan of SAIL
pertaining to GOM
52 Clause 6.2.1.4 MDO Responsible for conveying of Please Clarify : Primary stock pile shall remain fix through out the life of project. No change from NIT.
MSA Pg no. 25 crushed ore from MDO’s & existing 1.The location of Intermediate Stockpile shall remain For the reqiured information, kindly refer DPER prepared by
departmental crushing plant to fix throughout the life of Project or may change. MECON/FR prepared by CET, which may be shared by BSL/SAIL on Clarification Only
intermediate stockpile Please Provide Location map of Intermediate stockyard. request .The MECON DPER/CET FR is indicative and for guidance
2.The CLO and Fines shall be maintained separately at of the bidder only.
the same location or crushed ore will be homogenous
(+6-75mm)
3.The MDO and GOM (Departmental) material can be
conveyed through same conveyor or separate
4.The mechanism that will be adopted record the
tonnage.
53 Clause 6.2.1.6 6.2.1.6 Loading of Products (Lumps, Kindly give more clarifications on number of dispatch LUMP, fines and pellets to be despatched through rapid loading No change from NIT.
MSA Pg no. 25 Fines& pellets) into Railway wagons points to maintained, as there are several products i.e., sysytem. For the reqiured information, kindly refer DPER prepared
BO, DO, Pellets (being generated at different locations) by MECON/FR prepared by CET, which may be shared by BSL/SAIL Clarification Only
which are to be delivered by MDO as part of its on request .The MECON DPER/CET FR is indicative and for
obligation. guidance of the bidder only.
We request you to provide location of the product wise
54 Clause 6.2.1.8 6.2.1.8 Compliance with conditions di h iof conditions
Compliance d l kindML, MP,
h EC, FC is in the Compliance of conditions in ML, MP, EC, FC is in the scope of No change from NIT.
MSA Pg no. 26 stated in the Mining Lease, Mining scope of MDO however, the compliances which remain MDO however, the compliances which remain not completed
Plan, Environment Clearance and not completed prior to appointment date of MDO shall prior to appointment date of MDO shall automatically become Clarification Only
Forest Clearance. automatically become MDO scope or with GOM. MDO scope. No violations as on date.
Additionally, Copy of ML, MP, EC, FC compliance may
be shared with along with past Violations.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
55 Clause 6.2.1.14 6.2.1.14 Land for Infrastructure SAIL shall provide land for Constructing Infrastructures Already clarified at Point No. 2 above No change from NIT.
MSA Pg. No. 28 facilities at GOM facilities Within and outside the mining lease.
Clarification Only
Please clarify, whether the project milestones
commencement date shall begin from the land hand
over date or signing of the Mining Service Agreement vis-
à-vis commercial production date.
In case there is any delay in handing over of land to
MDO, which is not attributable to MDO, please clarify
that the timelines will be moved forward accordingly?
57 Clause 6.2.1.17.1 6.2.1.17.1 Security Any SOP needs to be developed and linked with the After award of work, MDO in consultation with SAIL and CISF(or No change from NIT.
MSA Pg. No. 28 reporting structure of CISF (SAIL Security). Security Agency) will formulate SOP for smooth operation within
Please share, existing security plan/SOP, if available. the working area. Clarification Only
58 Clause 6.2.1.17.2 6.2.1.17.2 Safety First Aid Station, Hospital, Ambulance shall be Facility at GOM is not sufficient to cater MDO requirement. No change from NIT.
MSA Pg. No. 28 maintained independently by MDO or the existing
infrastructure of GOM can be used on payment Clarification Only
basis/free of cost.
Please clarify
59 Clause 6.2.3.1 6.2.3.1 General Obligations 1.The mechanism for approval of Engineering Drawings 1) Design and engineering is the responsibility of bidder. No change from NIT.
MSA Pg. No. 30 for establishing the project. 2) Mobile Crushing and Screening unit can be engaged depending
2.In Mines, Mobile Crushing and Screening unit can be on its suitability, high volume handling and statutory conditions, if Clarification Only
engaged if required for Inpit crushing & Screening. any.
60 Clause 6.2.3.1 (iv) 6.2.3.1 (iv) The MDO shall, at its own As Lease Owner all the regular returns will be filed by No change from NIT.
MSA Pg. No. 31 cost and expense, in addition to and GOM and data will be provided by MDO. Further, MDO to prepare and submit through GOM
not in derogation of its obligations whether the returns which needs to be submitted by Clarification Only
elsewhere set out in this Agreement. contractor as per 10th Conference shall be submitted to
DGMS directly by MDO or GOM as per the data
submitted by MDO, Please clarify.
61 Clause 6.2.3.9 6.2.3.9 Obligations to Mining Plan Will the MDO have contribution and input to any Responsibility of Approval of mining plan lies with SAIL. MDO has No change from NIT.
MSA Pg. No. 36 modifications of Mining Plan. to approach SAIL for modification if required. The required
A suitable SOP may be derived to jointly take up the modification has to be mutually agreed by SAIL & MDO. Clarification Only
Mining Plan modification, wherein MDO can also lend
their technical experties along with SAIL.
62 Clause 6.2.3.11 6.2.3.11 Obligations in relation to Please clarify, if MDO is required to shift any existing Public infrastructure falling within the MDO allocated space which No change from NIT.
MSA Pg. No. 36 public infrastructure infrastructure which is being utilized by SAIL and will be required to be used in future either by SAIL or in General
continues to do so after relocation, whether MOD will will preferably not allowed to be shifted. So, MDO should Clarification Only
be reimbursed for this activity. accordingly design and plan.
Additionally, what is the process to be adopted in case If in any case, MDO is requied to shift the same, it is to be done on
the MDO has to shift the infrastructure which does not its own cost.
belong to SAIL?
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
64 Clause 8.4.2 8.4 Quality of Iron Ore & Pellets The guaranteed values range for undersize and oversize No change from NIT. No change from NIT.
MSA Pg. No. 40 of 5% to 7% (max) each for fines and Lumps during
8.4.2 Physical Parameters monsoon will be very difficult to maintain.
We recommend that a range of 8% to 10% shall also be
included in this clause specifically for monsoon season
only, considering the operational difficulties which are
beyond the control of MDO.
65 Clause 8.4.3 8.4.3 Chemical Parameters Please provide- For the required information, Kindly refer approved mining plan No change from NIT.
MSA Pg. No. 40 1.The average grade of ROM of Gua Mines? and Geological report provided with NIT.
2.Ratio of Fines to Lumps Clarification Only
3.Ratio of Hard ore to Laminated soft friable ore.
66 Clause 8.5.3 8.5 CHEMICAL AND PHYSICAL Please Clarify Refer clause 8.5.1, The lab will be set up and maintained by MDO, No change from NIT.
MSA Pg. No. 42 ANALYSIS OF IRON ORE (LUMPS & 1.The Lab built by MDO shall be operated by GOM however sample preparation & testing will be done by SAIL.
FINES) AND PELLETS independently or with representative of MDO. Usable/ consumables (running Expenses) shall be provided by Clarification Only
2.The chemicals, spare parts shall be procured by MDO MDO. The Lab should be NABL accredited. All the
8.5.3 The chemical laboratory to be or GOM – Running Expenses. returns/compliances related to Lab shall be the responsibility of
established by MDO 3.The Lab should be NABL accredited. GOM.
4.All the returns/compliances related to Lab shall be
the responsibility of MDO or GOM.
67 Clause 9.5.2.1 Liquidated Damages The Overburden/Interburden to be removed as per the At the start of every commercial production year, SAIL and MDO No change from NIT.
MSA Pg. No. 55 agreed OB removal Plan. shall jointly draw out the annual operational plan outlining the
9.5.2.1 Damages for failure to remove However, while operation, due to geological conditions Quantity of Overburden/ inter burden removal & Dumping Clarification Only
Overburden/Inter-burden (Dyke, intrusions, pinching etc.), if there is variance in Schedule for GOM (Refer Clause 8.3.2.1 (ii)). Since the Quantity
actual quantity. How the shortfall or excess can be of Overburden/ inter burden will be mutually agreed between
managed? SAIL and MDO on yearly basis, the occurrence of the waste rock
will be fairly known to both the parties. Further, MDO can make
up the shortfall within 9(nine) months immediately following the
year in which the relevant shortfall occurred (refer clause 9.5.2.1).
Excavation of overburden/ waste rock/ inter burden is within the
scope of MDO. As it is a long term contract, excess excavation in a
particular year will ultimately benefit MDO in subsequent years.
Hence, there won’t be any compensation for additional volume.
68 Clause 16.2 OCCUPATIONAL SAFETY AND HEALTH Kindly provide the copy of Approved Safety Management Plan Safety Mgmnt Plan enclosed for reference purpose only. No change from NIT.
MSA Pg. No. 68
16.2 Compliance with Laws and DGMS MInes Rules 1955, MMR 1961 and related circulars & Clarification Only
Policies safety conferences are to be abided by.
69 Clause 18 18 MDO’s ACCESS TO MINE In case SAIL wish to deploy agency in other block, can No change from NIT.
MSA Pg. No. 73 the first refusal right may be given to MDO before No
engaging other suitable agency by SAIL. Clarification Only
70 General Geotech report & Contour detail Please share detail of Geotech report & contour details Design & engineering is the responsibility of bider. Geo-technical No change from NIT.
of mine study has to be carrried out by bidder. However, Geo technical
report is enclosed for reference. Reagrding contour deatil , refer Clarification Only
approved mining plan.
71 General Infrastructure Please share AutoCAD file of the Surface master plan Enclosed No change from NIT.
showing Detail of exiting & proposed infrastructure at
the mine site Clarification Only
72 General Rehabilitation and Resettlement A mine service agreement doesn't provide any list of PAF No change from NIT.
No R&R colony construction envisaged as per LARR Act 2013
within the mine lease area. It is assumed that no R&R
colony construction envisioned in MDO scope. Please Clarification Only
confirm.
73 Clause 6.2.1.13 6.2.1.13 Land for Township As Noamundi town is very near to mine site (appx 25km) Without hampering to fulfill their liabilities under the contract, No change from NIT.
MSA, Pg. No. 27 MDO shall opt out for construction of colony for its own the township for general manpower can be put at any suitable
employee. Please confirm location for smooth operation of the mines. However, for Clarification Only
statutory manpowers accomodation has to be provided at a
suitable location as per DGMS guidelines.
74 Clause 6.2.3.1 (I) 6.2.3.1 (I) Shifting of all existing public Please provide detail of existing road passing through No change from NIT.
MSA, Pg. No. 32 and private infrastructure, if any and the block like the width of the road, length of the road, There is no existing road in the block. However, an approach road
diversion of road from within the Site. RCC or bituminous road. of 7.5 m width and 7 km length is existing for reaching the block Clarification Only
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
75 Annexure - 1 ANNEXURE-1 SCOPE OF WORK Please share Approved mine plan. Also Approved Mining plan already provided to bidder along with No change from NIT.
1.0 (C) 1. Provide condition of any existing road. Tender documents. Approach road is required to be made for
ITT, Pg. No. 106 1.0 Pre Development Activities 2. This road is from gau village (downhill) to up hill. virgin mining area like Goja phar & darbarburu, proposed plant Clarification Only
(C) Construction of approach roads to Approach road outside mine lease boundary not location e.g. crushing plant plant, PSP, Beneficiation & pellet
the deposit as per approved mine required. Please confirm. plant, tailing disposal, loading plant etc. Approach road outside
plan. mine lease boundary , but within the surface right area will be
required for facilites loacted in this area.
76 Annexure - 1 ANNEXURE-1 SCOPE OF WORK Please provide hydrogeological report and nala diversion Refer EIA-EMP Report No change from NIT.
2.0 (i) study report. It shall contain details like HFL detail, route
ITT, Pg. No. 107 2.0 Development Activities of diverted nala etc. Clarification Only
(i) Stream diversion.
77 Clause no.8.7.2 8.7.2 Selective mining of high grade Please furnish ore characteristics which shall be Please refer Ore characterisation and beneficiation test report No change from NIT.
MSA. Pg No. 44 continued thereafter, which has processed in the proposed scheme. provided along with tender documents.
resulted in dilution of average ROM Clarification Only
78 feed grade. Please provide beneficiations test reports which can be Ore characterisation and beneficiation test report already No change from NIT.
referred for design of proposed plant as part of this provided along with tender documents.
tender Clarification Only
79 General As per tender total plant capacity envisaged 12.5 MTPA Bidder to decide. Design and engineering is the responsibility of No change from NIT.
including 9.5 MTPA beneficiation plant. What is the bidder. For required information, bidder may refer Approved
desired peak capacity to be envisaged for DO processing Mining plan and Geological report . Bidder may also refer DPR Clarification Only
section. prepared by MECON/FR prepared by CET(Technical Part Only).
The MECON DPER/CET FR is indicative and for guidance of the
bidder only.
80 General Kindly clarify the grade range of BO and DO Quality desired is given in the tender documents. No change from NIT.
Clarification Only
81 General Please provide detailed flowsheet of proposed Design and engineering is the responsibility of bidder. So No change from NIT.
beneficiation and pellet plant, if available responsibility of flow sheet development for beneficaition and
pellet plant lies with MDO. However, DPR prepared by MECON/FR Clarification Only
prepared by CET (Technical Portion Only), can be refered. The
MECON DPER/CET FR is indicative and for guidance of the bidder
only.
82 Approved Provided list of major equipment in Can the bidder make a few improvisations to the YES, subject to statutory permission granted to GOM like EC , FC, No change from NIT.
Modification of crushing & Beneficiation Plant provided equipment list by adopting latest available CTO, approved mining plan etc.
mining plan, technologies, wherever applicable ? Clarification Only
Chapter-3
83 Approved Tailing disposal The clause indicates tailing disposal by both the Dry disposal through filter press. No change from NIT.
Modification of methods -
mining plan, a)Dry method through filter press, b)slurry form Clarification Only
Chapter-3 (Pg No- through pumping.
50/94)
Please clarify which method has to be adopted by the
bidder.
84 Annexure -16 Proposal for utilization of actual area Is it mandatory to use specific size/area of land for Bidder to adhere to approved land use plan. No change from NIT.
(Pg No - 505/661) for mining, Plant, Infra, tailing pond, proposed facilities? Or the bidder can modify, if needed.
etc., Clarification Only
85 General Please provide palletization studies data(Test work Design and engineering is the responsibility of bidder. For required No change from NIT.
report) information, bidder may refer DPR prepared by MECON/FR
prepared by CET (Technical Portion Only). The MECON DPER/CET Clarification Only
FR is indicative and for guidance of the bidder only.
86 General Kindly furnish list of equipment with technical Design and engineering is the responsibility of bidder. For required No change from NIT.
specifications for pellet plant, if available information, bidder may refer DPR prepared by MECON/FR
prepared by CET (Technical Portion Only). The MECON DPER/CET Clarification Only
FR is indicative and for guidance of the bidder only.
87 Annexure -16 (Pg Please confirm that for what duration shall the 4-5 years. No change from NIT.
No - 505/661) designated tailing area will store the tailings generated
from the plant, If any evacuation is not done. Clarification Only
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
88 Battery Limit “Battery Limit” for Water Supply will 1. Please provide tentative pipe route from intake well Design and engineering is the responsibility of bidder. For required No change from NIT.
MSA Pg. No. 6 be withdrawal of water from Karo to mine site. information, bidder may refer DPR prepared by MECON/FR
River near existing intake well & pump 2. Kindly provide detailed project report for water prepared by CET(Technical Portion Only). The MECON DPER/ CET Clarification Only
hose…........................ drawal from Karo river. FR is indicative and for guidance of the bidder only. Bidder may
3. Please provide three season's water quality report for also refer water withdrawal report provided with tender
existing water drawal arrangement. documents.
Recent three season water quality may be referred.
89 (b) MDO shall construct, maintain and Rain water harvesting structure as per CMA to be Raifall data to be referred. No change from NIT.
MSA Pg. No. 6 operate the rain water harvesting furnished.
facilities in compliance to water with Clarification Only
drawl agreement of SAIL-BSL-GOM
from Karo River.
90 Annexure - 1 Services/auxiliaries facilities MDO will consider only fire extinguisher for iron ore MDO may require to install and maintain fuel farm for storage of No change from NIT.
1.0 (C) > Fire protection and safety system. mine. Any other system is to be considered shall be HSD and furnace oil, lube oils etc as per statutory conditions. So
MSA, Pg. No. 111 indicated. MDO has to adhere to all the safety protocols as required for Clarification Only
complicane as per the granted licence, which may not be limited
to fire extinguisher.
91 Clause no. 6.2.1.12 6.2 MDO’s RESPONSIBILITIES, MDO will have access to existing water reticulation No change from NIT.
MSA. Pg No. 27 LIABILITIES AND OBLIGATIONS system during construction stage and till the permanent
infrastructure for water drawl from Karo river is With respect to power during construction period, MDO has to Clarification Only
6.2.1.12 Utilities constructed. Please confirm. arrange on its own. If excess power is available to GOM, the same
on chargeable basis may be allowed to be tapped. However, the
MDO shall also arrange for utilities Construction power may be provided by SAIL GOM on same is not an obligation of SAIL.
including power and water during chargable basis
construction period at its own cost. With respect to water drawal from the existing infrastructure of
SAIL during the construction period may be allowed to be tapped
on chargeable basis to the extent possible without hampering
SAIL's own requirement.
However, MDO to prioritise construction of their own facilities for
power and water drawal to facilitate during the construction
period and to minimise dependancy on SAIL.
92 Clause no. 6.2.3.11 6.2.3 MDOs Obligations Client shall furnish the details of diversion required No change in NIT No change in NIT
MSA. Pg No. 36 along with the diverted route.
6.2.3.11 Obligations in relation to
public infrastructure
93 Water Feasibility Thus 4.16 MCM or 475 M3/hr of 2.222 MCM capacity of water storage reservoir is No change from NIT.
Report by M/s. water could be easily made available proposed. The location of same shall be provided for
Sona Engineering at proposed site for operating the Iron mine water management. location is Gojha pahar nalla Clarification Only
5. Ore Mining lease area with a storage
Recommendation : intervention of 2.222 MCM capacity
for the month of November to May to
meet the water demand for mining
activities.
94 General Please clarify for any existing Transmission line diversion No shifting of existing transmission line is required. No change from NIT.
within the scope of MDO with following details.
1) Existing length Clarification Only
2) voltage level of line
-
3) single circuit/double circuit
4) Existing pole/tower type
5) Re-route length
95 ANNEXURE-1 Installation and operation of new Please inform the tentative availability date for 220 kv Expected commissioning by Dec'24 No change from NIT.
SCOPE OF WORK 220/ 11 kV MRS, for which power at line at GOM end.
ITT, Pg.No. 94 220 kV is being taken to GOM by SAIL- Clarification Only
96 BSL-GOM for which double circuit MDO may be allowed to purcase power through No change in NIT No change from NIT.
Transmission line job is in progress. excahnges or do the wheeling from any of their power
plants.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
97 1) Location coordinates of Mine end transmission line No change from NIT.
Installation and operation of new shall be furnished. 1) Location is adjacent to the existing MRSS. The proposed
220/ 11 kV MRS and downstream 2) The distance to furnished between the MDO MRS to location & coordinates are marked in the map showing facilities. Clarification Only
HT/LT Sub-Stations for meeting the existing GOM MRS for considering length of 2) The distance between the MDO MRS to existing GOM MRS is
entire power requirement of transmission line/no.of runs of cables. approx. 200 - 300 mtrs.
................... 3) Seeing the scope of MDO and associated electrical 3) No change in NIT
load, the power distribution will be at 33kV hence the 4) No change in NIT
switch yard will be 220/33kV instead of 220/11kV. 5) Redundant
Kindly allow and confirm.
4) With reference to above point, kindly allow 33kV
feeders to feed existing GOM MRS instead of 11kV.
5) Kindly confirm whether power distribution inside
plants shall also be redundant or single circuit.
98 ANNEXURE-1 Provision of primary stockpile for Minimum capacity of stockpile of SAIL-BSL-GOM of MDO to decide. However, the same should be within the No change from NIT.
SCOPE OF WORK stacking secondary crushed ore from least 50000 Tonnes will be kept however What is the approved land use plan.
ITT, Pg.No. 91 both departmental crushing plant minimum capacity MDO should keep for their plant as Clarification Only
(SAIL-BSL-GOM) & from MDO Plant primary stockpile ,Pls. clarify.
separately.
The minimum capacity of stockpile of
SAIL-BSL-GOM should be at least
50000 Tonnes. Moreover there
should also be earmarked space in the
stockpiles for BO & DO.
99 ANNEXURE-1 The secondary crushed ROM of SAIL- SAIL-BSL-GOM secondary crusher technical details like Kindly refer clause 6.1.2.5 and 8.4.1 of MSA. No change from NIT.
SCOPE OF WORK BSL-GOM will be supplied to MDO for efficiency and percentage of oversize material which
ITT, Pg.No. 90 further processing. will be supplied to bidder shall be provided. Clarification Only
100 4.9 OTHER RELEVANT INFORMATION Please provide the said DPER for Expansion of Gua Ore DPR prepared by MECON/ FR by CET (Technical Portion Only) may No change from NIT.
Clause 4.9 National Metallurgical Laboratory Mines by MECON Limited be referred. The MECON DPER/ CET FR is indicative and for
ITT, Pg.No. 48 (NML), Jamshedpur has conducted guidance of the bidder only. Clarification Only
the bench scale and
...............................March 2009 for
preparation of DPER for Expansion of
Gua Ore Mines by MECON
Limited…....................
101 installation and operation of conveyor Existing departmental crushing facilities drawing where The clause given in page 101/129 holds good. The clause given in No change from NIT.
ANNEXURE-1 system for tapping of secondary tapping will be done shall be provided to bidder, to page 117/129 should be read as " Supply of secondary crushed
SCOPE OF WORK crushed ROM from existing understand the modification required. ROM, size (-75 mm), @ 3.0 Mtpa from existing GOM Crushing Clarification Only
MSA, Pg.No. 101 departmental crushing plant to plant up to tapping point of MDO".The scope of MDO will starts
primary Stockpile. Page 101/129 and page 117/129 clause are from tapping of SAIL crushed ROM from its existing departmental
contradictory clarify the scope of conveying from downhill conveyor of SAIL crushing plant.The scope covers the
existing crushing unit to primary stockpile . required modification for tapping along with installation and
operation of conveyor system for conveying of seconadry crused
ROM to primary stock pile.SAIl scope is limited up to conveying of
crushed ROM to tapping point.
102 Clause 5.0, (d) 5.0 Responsibilities of SAIL- BSL-GOM The clause given in page 117/129 should be read as " Supply of No change from NIT.
ANNEXURE-1, secondary crushed ROM, size (-75 mm), @ 3.0 Mtpa from existing
SCOPE OF WORK (d.) Supply of secondary crushed GOM Crushing plant up to tapping point of MDO ". Clarification Only
Pg. No. 117 ROM, size (-75 mm), @ 3.0 Mtpa from
existing GOM Crushing plant to
primary stock pile of MDO.
103 Installation and operation of online Can bidder install Weigh scale and iron ore cross belt No change from NIT. No change from NIT.
ANNEXURE-1 weighing as well as quality sampling system to take the iron ore for moving belt
SCOPE OF WORK measurement system to measure the conveyor and further quality measurement will be done
MSA, Pg.No. 101 quality and quantity of reclaimed ore as per requirement ,pls confirm
from primary stockpile of SAIL-BSL-
GOM and MDO separately.
104 Reclamation of dump fines @2.5 Clause 106 (2b) of MMR, 1961. request to elaborate the Refer approved mining plan. No change from NIT.
ANNEXURE-1 MTPA from dump fines stockpile if equipment to be utlized reclamation of dump fines.
SCOPE OF WORK available/permitted, are to be done in Clarification Only
MSA, Pg.No. 102 line with Clause 106 (2b) of MMR,
1961.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
105 Installation and operation of Intra- Kindly clarify the Quantity of silo and capacity of storage Design and engineering is the responsibility of bidder. For required No change from NIT.
ANNEXURE-1 Plant conveying system & silos for dumped fines or can bidder decide the capacity information, bidder may refer DPR prepared by MECON/FR
SCOPE OF WORK construction of Storage silos for . prepared by CET. The MECON DPER/CET FR is indicative and for Clarification Only
MSA, Pg.No. 102 intermediate storage of dumped fines. guidance of the bidder only.
106 The proposed capacity expansion of We are considering 5000 working hour for OHP plant Design and engineering is the responsibility of bidder. For required No change from NIT.
ANNEXURE-1 GOM is envisaged to be achieved design, information, bidder may refer DPR prepared by MECON/FR
SCOPE OF WORK through mine development & Please confirm. prepared by CET. The MECON DPER/CET FR is indicative and for Clarification Only
MSA, Pg.No. 100 operation, utilization of existing guidance of the bidder only. working in 3 three shift allowed.
crushing facilities, …................ Working in 3 shift is allowed? Please confirm.
107 Installation and operation of suitable 3 number of wagon loading silo of 500 T capacity steel MDO to consider rapid loading sysytem . One can be used for No change from NIT.
ANNEXURE-1 loading plant along with dedicated silo is considered (1 for lumps, 1 for fines and 1 for loading of lumps as well as pellets. The other one can be used for
SCOPE OF WORK rapid loading system, each for loading pellets). loading of fines. Clarification Only
MSA, Pg.No. 103 of lumps, fines and pellets produced Please confirm ?
from the MDO’s crushing, screening,
beneficiation &pellet plant and SAIL-
BSL-GOM departmental production,
into Railway wagons.
108 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI PLATE_19_LACATION_OF_PROPOSED_PLAN drawing 2 MDO to consider rapid loading sysytem . One can be used for No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G silo is shown but as per document " dedicated rapid loading of lumps as well as pellets. The other one can be used for
AN_TOPAILORE UA_ORE_MINES_SAIL loading system, each for loading of lumps, fines and loading of fines. Clarification Only
pellets" is mentioned,
pls clarify 2 silo to be considered or 3 silo to be
considered by bidder.
109 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI PLATE_19_LACATION_OF_PROPOSED_PLAN is scanned Enclosed No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G pdf document and not legible .
AN_TOPAILORE UA_ORE_MINES_SAIL For better clarify and understanding of bid drawings Clarification Only
request to provide the original pdf/AutoCAD file.
110 General OHP Flow diagram for both existing and proposed plant Existing OHP may be seen in the mining plan. Proposed flow sheet No change from NIT.
shall be provided for bidder's clarity to be developed by bidder.
Clarification Only
111 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI All facility shall be numbered and abbreviation shall be Bidder has to do this for their own clarity. No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G provided to each facility for bidder's clarity and
AN_TOPAILORE UA_ORE_MINES_SAIL consideration Clarification Only
plate_19_location of proposed_plan
112 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI As per drawing many Existing ore handling Production from existing plant is continue, thus MDO will not be No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G infrastructure like downhill conveyor, stockpile permitted to use SAIL's infrastructure.
AN_TOPAILORE UA_ORE_MINES_SAIL conveyor are available, can bidder utilize the available Clarification Only
infrastructure . Pls clarify.
Scope of Modification /dismantling of existing
infrastructure shall also to be clarified.
113 Installation and operation of Conveyor Bidder shall construct new downhill conveyor from hill Bidder to constuct new downhill conveyor of adequate capacity. No change from NIT.
ANNEXURE-1 System including downhill conveyors top to hill bottom or Existing down hill conveyor for SAIL-
SCOPE OF WORK up to screening plant. BSL-GOM Departmental 3 MTPA plant material as per Clarification Only
MSA, Pg.No. 114 PLATE_4_SURFACE_PLAN shall be utilised for the same ,
please clarify.
114 Installation and operation of Conveyor Any survey data for proposed long distance conveyor Survey data not available. No change from NIT.
ANNEXURE-1 System including downhill conveyors route available ? If yes pls share ,and also share the
SCOPE OF WORK up to screening plant. AutoCAD for contours required for planning of Long Clarification Only
MSA, Pg.No. 114 distance conveyors
115 ANNEXURE-1 General 1. contour map of mines, proposed land of benificiation, A no. of documents along with tender documents such as No change from NIT.
SCOPE OF WORK pellet plant, primary stock pile, approved mining plan, test report, landuse plan, water withdrawal
MSA 2. Autocad format of the plant layout and rail loading report has been provided. Bidder to refer these documents for the Clarification Only
system of the present and the proposed expansion of desired information. Bidder may also refer DPR prepared by
rail loading system with rapid loading system. MECON/FR prepared by CET (Technical Portion Only) . The
3. Any soil investigation report available for benificiation MECON DPER/CET FR is indicative and for guidance of the bidder
and pellet plant area (non binding) only.
4. KML file of project area of MDO and surface lease
area.
5. Report of test work done for benificiation and pellet.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
116 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI Dump fines material shall feed to tertiary crushing Bidder may refer DPR prepared by MECON/FR prepared by No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G building or it can be feed directly to Beneficiary plant CET(Technical Portion Only). The MECON DPER/CET FR is
AN_TOPAILORE UA_ORE_MINES_SAIL please clarify, as connection is not seen in the drawing indicative and for guidance of the bidder only. Clarification Only
PLATE_19_LACATION_OF_PROPOSED
_PLAN
117 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI We presume that two conveyors from tertiary crushing One conveyor from tertiary crushing plant to silos can be used No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G to beneficiation plant /silo is shown in the drawing. Shall either for BO or DO on time sharing basis. Bidder to decide.
AN_TOPAILORE UA_ORE_MINES_SAIL bidder consider single conveyor on time sharing basis. Pl Another one dedicated for reclaimation of dump fines to dump Clarification Only
PLATE_19_LACATION_OF_PROPOSED Clarify. fines silos.
_PLAN
118 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI As per the drawing, there is no screening arrangement Decision on close circuit may be driven by oversize/undersize in No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G for tertiary crushing is shown, we recommend closed products. Bidder to decide.
AN_TOPAILORE UA_ORE_MINES_SAIL circuit for achieving 100% -30 mm product. Kindly Clarification Only
PLATE_19_LACATION_OF_PROPOSED clarify.
_PLAN
119 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI Tender document mentioned facility and drawing not Bidder has to make their drawing as per Scope of MSA and No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G matching provide updated drawing as per Mine service approved land use plan.
AN_TOPAILORE UA_ORE_MINES_SAIL agreement. Clarification Only
PLATE_19_LACATION_OF_PROPOSED
_PLAN
120 ANNEXURE-1 Finished pellet stockpiles Can MDO propose an alternative ways of stockpile YES, subject to statutory permission granted to GOM like EC , FC, No change from NIT.
SCOPE OF WORK The different product (lumps, fines & preparation, equipment and decide on number of EIA-EMP, CTO, approved mining plan etc.
MSA, Pg.No. 113 pellets) obtained after beneficiation& stacking and reclaiming equipment ? Please clarify. Clarification Only
palletization, will be conveyed to their
respective product ….......................
121 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI Infrastructure like conveyor route ,crushing plant Location can not be changed as stage-2 FC has been accorded No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G location ,stockyard location are provided in the drawing accordingly.
AN_TOPAILORE UA_ORE_MINES_SAIL ,However can MDO plan an alternate conveyor route, Bidder has to adhere to approved land use, EC, FC etc. Clarification Only
PLATE_19_LACATION_OF_PROPOSED with different stockyard, crushing, screening, Train load
_PLAN out location? please confirm
122 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI Can MDO has a option to plan number of conveyor YES. (land use plan may also be seen) No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G streams, capacity, belt width, speed and length as per
AN_TOPAILORE UA_ORE_MINES_SAIL layout requirement without compromising overall Clarification Only
PLATE_19_LACATION_OF_PROPOSED performance.
_PLAN
123 General Kindly confirm the conveyor shall be closed gallery or Bidder to decide as per conditions of EC & FC. No change from NIT.
open gallery with hood.
Clarification Only
124 General we presume covered shed for open primary stockpile is Bidder to decide. No change from NIT.
not envigesed. Kindly confirm
Clarification Only
125 APPROVED_ANNEX ANNEXURE_GUA, The entire Document is scanned pdf document , Enclosed No change from NIT.
URE_GUA_ORE_MI Proposed flow diagram For better clarity and understanding please provide
NES legible pdf document . Clarification Only
page:429/661
126 APPROVED_REVIE APPROVED_DRAWINGS_GUA_MODIFI For Dump fines material and 3 mtpa SAIL-BSP-GUA No. No change from NIT.
W_OF_MINING_PL CATION_OF_REVIEW_OF_MINING_G departmental production can we use existing conveyor ?
AN_TOPAILORE UA_ORE_MINES_SAIL Please clarify Clarification Only
PLATE_19_LACATION_OF_PROPOSED
_PLAN
127 Clause 30 B (5) B. CONCILIATION Please provide the said Scheme as mentioned in this Enclosed No change from NIT.
MSA, Pg. No. 88 …............................................. clause.
Conciliation shall be held through "SAIL's Scheme for Settlement of Clarification Only
SAIL's Scheme for Settlement of Contractual/Commercial Disputes through Mechanism
Contractual/Commercial Disputes of Outside Expert Committee (OEC)"
through Mechanism of Outside Expert
Committee (OEC).
128 Clause 30 B (6) In Clause 30 (B) (6) it is provided that in case of dispute Request to amend the clause as follows: No change in NIT No change from NIT.
MSA, Pg. No. 88 involving claim amount more than Rs.250 crores, either In case of dispute involving claim amount more than
party can approach the court of competent jurisdiction Rs.250 crores, matter can be referred to Arbitration or
including commercial court, whereas Clause 30 (B) (1) either party can approach the court of competent
provides that in the event of failure of Conciliation the jurisdiction including commercial court.
dispute can be referred to Arbitration or Commercial
Court.
So, in Clause 30 (B) (6) as well both Arbitration or
Commercial Court are to be incorporated.
Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA OF PRODUCT CAPACITY WITH MATCHING BENEFICIATION FACILITIES, 4 MTPA PELLET PLANT AND 10 MTPA LOADING PLANT
Section ref no. and Existing SAIL's Reply Changes from NIT
S. No. Clarification Required Suggested Text for Amendment, if any Rationale for Clarification or Amendment
Page no. Provision
129 Clause 30 C (2) …......................................... the The Clause (C) is for arbitration, therefore mentioning No change in NIT No change from NIT.
MSA, Pg. No. 89 Dispute is to be decided by Court of of Arbitral Tribunal in this clause is required.
Competent Jurisdiction including
Commercial Courts Act, 2015 (as
amended time to time).
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 1 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 2 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 3 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
ICP etc.
Page 4 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
equipment/ facilities
in good and safe
operational condition.
New equipment /
facilities shall be
installed by MDO for
Crusher with drives,
Screens with drives,
Conveyor System with
drives, Stacker
&Reclaimer, Jigs,
WHIMS/HGMS,
Grinding Mills, Filter
press, Thickeners,
Slurry
pumps, Rapid Loading
System, Induration
machine, Exhauster,
ESP, Disc pelletiser,
transformers,
switchgears,
automation systems
etc. The above
mentioned new
equipments are not
exhaustive and MDO
may further decide on
installation of other
equipments/facilities
to fulfill their
contractual
Page 5 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
obligations.
Page 6 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
execution of this
Agreement. The
validity of the
Performance Bank
Guarantee furnished
by MDO should be for
entire Mining Services
Agreement period
plus additional 90
days. Alternatively, a
bank guarantee of
shorter validity of
minimum 5 years may
be submitted, which
has to be renewed
successively at least
six months before the
expiry of such bank
guarantee submitted.
If the Successful
Bidder fails to sign the
Mining Services
Agreement or to
submit the
Performance Bank
Guarantee within 45
(Forty Five) days from
the date of execution
of Mining Agreement,
then EMD of the
Successful Bidder
Page 7 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
shall be forfeited.
Page 9 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 10 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 11 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 12 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 13 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
screening plant.
Page 14 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
No. 102 if the dump fines needs to be to be decided by the bidder Only.
available/permitted, processed (screening) before as per their process design &
are to be done in line sending to the storage silos. requirement.
with Clause 106 (2b)
of MMR, 1961. Whether the
Installation and screening/processing of
operation of dump dump fines required or
fines reclaiming directly we can reclaim as
conveying system per the scope? Kindly clarify
complete with
dumping platform and
hopper for
reclamation of
dumped fines.
Installation and
operation of Intra-
Plant conveying
system & construction
of Storage silos for
intermediate storage
of dumped fines.
Please refer the proposed No change in
Land Use Plan. The NIT.
Annexure- Kindly confirm whether the
considered dam area is Clarification
1 Scope of tailing dam area is sufficient
30 Tailing Dam sufficient for storage of Only.
work & Pg. to accommodate all the
tailings for about 4-5 years.
No. 103 tailings.
Regular evacuation will be
done by SAIL.
Annexure- Whether the Direct ore can Secondary crushed ore (-75 No change in
31 1 Scope of Despatch of Direct Ore be dispatched from the mm ROM) is stacked at NIT.
work & Pg. primary stockpile? Kindly Primary stock pile. Bidder Clarification
Page 15 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 16 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 17 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 18 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
of ROM .
Page 19 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 20 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
transportationshallbe
bornebyMDO.
Page 21 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
sole responsibility
ofthe MDO.
The railway siding Area levelling for siding No change in
construction is in scope of construction is in SAIL scope. NIT.
Clause 2.0
Proposed Railway SAIL. Whether the area Clarification
42 .(e) MSA &
siding levelling for siding Only.
Pg. No. 115
construction should also in
SAIL scope? Kindly clarify.
Annexure- Yes No change in
Construction of mine Kindly clarify, whether the
1 Scope of NIT.
43 water discharge proposed plant is a zero
work & Pg. Clarification
treatment. discharge effluent plant?
No. 115 Only.
Construction of Does any minimum Design & engineering is No change in
residential buildings, dimension required for responsibility of bidder. So, NIT.
Annexure-
community building, workshop, residential MDO to design on its own as Clarification
1 Scope of
44 roads, sewage and its buildings for MDO, office, Lab per applicable standards. Only.
work & Pg.
treatment, water and other administrative
No. 115
supply etc. for building for construction of
employees of MDO. MDO comes under the scope.
Construction of Design & engineering is No change in
residential buildings, responsibility of bidder. So, NIT.
Annexure- The construction type of
community building, MDO to design on its own as Clarification
1 Scope of buildings are RCC structure,
45 roads, sewage and its per applicable standards. Only.
work & Pg. PEB structure or steel
treatment, water
No. 115 structure? Kindly clarify.
supply etc. for
employees of MDO.
Annexure- Any diversion of nala Bidder to assess as per the No change in
1 Scope of required with in thelease site visit. NIT.
46 Stream diversion
work & Pg. area? Kindly provide the Clarification
No. 115 length for the diversion of Only.
Page 22 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Limestone
(BF Grade)
Coke
Breeze
Total 48.42 39.
(variable)
Page 23 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 24 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 25 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 26 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 27 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 28 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 29 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 30 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 31 of 31
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 1 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 2 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Govt. of Odisha
(whichever is higher).
Kindly consider the same
For your reference
below:
1. OMC – Dubna-
Sakradihi, Guali,
JillingLangalota
tenders
2. SAIL – Kalta
Tender
For the escalation/de- No change in
For escalation/de-
Annexure – escalation, for the given NIT.
escalation of coke breeze,
5 of MSA coke breeze is not
4 Escalation for coke Breeze WPI index of coal shall be Clarification
&Pg.No: mentioned in the WPI considered. Only.
124 index as published by
OOEA. Kindly clarify
In the table the No change in
escalation given for the No change from NIT. NIT.
Mining (M2)
Is 39.48% which seems
Annexure – to be substantially low,
5 of MSA further the we observed
5 Escalation for mining
&Pg.No: from the table provided
122 in page no. 122 of MSA
pertaining to escalation
components are not in
line with the industry
standards as well as
Page 3 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
abnormality in the
component %
distribution. Requesting
you to kindly re look into
it and make necessary
corrections.
Odisha Mining
Corporation Limited
(OMCL) Bhubaneswar
tenders for your
reference for the Mining
(M2):
Jillin
Component
ota
Bid submitted date 28.0
Fuel & Power
Wages
Spares & Lubes
Tyre & tube
Explosives
Fixed
TOTAL 1
Kindly provide No change in
illustration with NIT is amply clear NIT.
Annexure- examples for the regarding escalation
6 5 of MSA & Annexure-5 annexure-5 Clarification
Pg. No. 122 (escalation/de-escalation Only.
for each M1, M2, M3, M4)
for the bidders
Page 4 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
understanding.
Page 5 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 6 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 7 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 8 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
applicable IS standards
and in line with the
conditions of
environmental clearance
granted to GOM.
Whether there shall be Firefighting system shall No change in
firefighting system to be be considered for NIT.
considered for the crushing, beneficiation Clarification
Crushing, beneficiation & and pellet plant. Only.
Pellet plant. If yes, then Designing of firefighting
whether we have to system shall be the
23 General Firefighting system follow MVWS system for responsibility of MDO.
conveyors along with
hydrant system or only
hydrant system at
transfer points & other
strategic locations.
Please Clarify.
1. Conveyor Power and No change in
MDO to engage all
Tension will be designed NIT.
equipment and facilities at
as per IS-11592. Please the Mines and operate and Clarification
confirm. maintain in accordance Only.
with the Specifications and
24 General Conveyor design
Standards, Maintenance
Requirements, Safety
Requirements and
Standard Industry
Practice.
Page 10 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 11 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 12 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 13 of 14
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Page 14 of 14
Serial Clauses of Reasons to modify SAIL-RSP draft Suggestion and SAIL Reply Changes from NIT
SAIL-Bokaro Service Agreement SAIL-BSP or SAIL-RSP
clause description
No change in
Tender no: 1) Impact of tender conditions on – Possible Solution The project has four NIT.
T&C(m)/bsl- competiveness of bid causing 1) Hence, we suggest to major elements Mining,
1 JGOM/Gua/BKD/360 fragility of consortium appropriately amend clauses
dated 23-dec-22 Beneficiation, Pellet Plant Clarification
6.2(ii), 6.2(iii) and 6.2(iv) to and Loading beside Only.
The bidder would need to invest reflect the commercial reality. others. Proportionate
significantly, which on a ballpark
Modification in capex may not be as
clause 6.2.(i), (ii), basis might be split as follows: 2) In our view, a balanced
stated.
(iii), (iv) a) 10%-15% of total investment approach can be achieved
might go towards Mining simply by –
(Eligible Bidder) capacity
a) deleting the clause 6.2.(iv)
b) 10%-15% of total investment, and
might go towards Beneficiation
and loading capacity b) requiring each member to
meet minimum 10% of
c) 70%-75% of total investment, financial criteria in clause
or around Rs. 1800-2000 crores, 6.2(ii) and
will go towards Pellet plant of
capacity 4.0 MTPA c) in clause 6.2(iii), introducing
words “…or atleast one of
Clearly, major investment will go the members must meet
towards 4.0 MTPA pellet plant, out Technical Qualification
of total project cost. Criteria in clause 6.1.1.A.
Page 1 of 10
meet 40% of financial criteria Refer Tender number
and; CET/01/BH/4803/TD/ME/01/R=0,
b) Lead Member to meet Technical dated dec’21 of BSP clauses, 1.8 at
qualification of clause 6.1.1.A, page 12 – which does not have such
complex criteria and yet is robust.
ie. Lead Member must be from
mining experience ONLY and
finally;
c) Lead Member to hold minimum
51% stake in consortium, while
non-lead member is limited to
hold maximum 49%.
Page 2 of 10
unmitigated risks to objectives of SAIL
No change in
Tender no: The words “…Letter of support from pellet Possible Solution No change from NIT. NIT.
T&C(m)/bsl- vendor” 1) make clause 6.1.1.A subject to
2 JGOM/Gua/BKD/360 clause 6.1.2
dated 23-dec-22 Mere, letter of support from a pellet vendor
that too to a multiple eligible bidder is,
Page 3 of 10
clause 6.1.1.B clause 6.4.1 of “multiple bids”;
Page 4 of 10
4 more than 2 quarters will trigger 1) Termination clause can be Please refer clause 25.8 of NIT.
(EOD for MDO) Termination clause triggered, only if, such draft MSA. Clarification
instances are repeated 2nd time
No change from NIT. Only.
2) Continued shortfall due to Suspension of
work beyond 90 days trigger Please align the clause 16.2.1 at page –
Termination clause 22, Article 12 of SAIL-BSP Draft
Agreement for 1 MTPA Pellet plant
After making substantial investment for
project of tenure 23 years or more, the “It give option to first mutually resolve
micro events must NOT lead to Termination. issues and only after repeated failures
an option of termination to SAIL-BSP”
Page 5 of 10
Draft Service Agreement of SAIL-RSP
for 2 MTPA Pellet plant clause12.4.2 at
page 47, says that
“…penalty is 0.5% of performance
security pm and capped to maximum of
10% pf performance security.…“
No change in
6 Clause 9.5.2 Since, this is low margin business of Please align as per the clause 12.2 at No change from NIT. NIT.
conversion fee only, with high instance of page 19 of draft SAIL-BSP Service
(Liquidated fixed cost, any liquidated damages in range Agreement for 1 MTPA Pellet plant.
Damages for off 15% of Conversion Fees on shortfall
shortfall in quantity quantity, will make the project completely “0.5% of the conversion Fees of Pellet
of monthly unviable and commercially unsustainable for the shortfall quantity”
production by
Contractor)
Draft Service Agreement of SAIL-RSP
for 2 MTPA Pellet plant clause 31.3.1
have been amended with a
corrigendum dated 16-sep-22 refer
point #1 ,of corrigendum, which says
that
“…penalty has been reduced - nil for first
10% shortfall, 5% only for shortfall of
10-20% …“
No change in
Clause 9.5.3 Since, this is low margin business of Please align as per the clause 12.1 page No change from NIT. NIT.
7 conversion fee only, with high instance of 9 of draft SAIL-BSP Service Agreement
(Liquidated fixed cost, any liquidated damages beyond a for 1 MTPA Pellet plant
Damages for maximum cap will make the project
slippage in quality completely unviable and commercially “0.5% of the conversion Fees of Pellet
by Contractor) unsustainable for the shortfall quality”
Page 6 of 10
“10% of the conversion Fees of Pellet for
the shortfall quality
2) There is a provision in clause 25.1, 2) Please consider, to make clause 5, 2) Both the clauses
allowing cure period of 1-3 years, only subject to clause 25.1 for are different. Clarification
post that EOD and consequential completeness and clarity Clause 25.1 comes Only.
Termination is triggered. Clause 5, is in to effect only
untied to 25.1
when there is
event of default.
Page 7 of 10
SAIL-BSP draft agreement
“…BSP has guaranteed minimum 60,000
tons per month off-take”
Please refer to clause 7.2.2(b) page 28
of SAIL-RSP draft agreement
“…RSP has assured off-take of entire
production”
1) Restricting change in composition of No change in
Clause 6.2.3.2(iii)(c ) board of members of consortium, when No change in NIT NIT.
11 the contract is with a new JVC and when Please, consider deleting this condition.
(Obligation to clause 6.2.3.2(ii) (a) permits SAIL to issue
change in ownership written NOC prior to change in
- Power to change shareholding ratio of JVC is over-
board of directors of regulation
member of 2) Moreover, this is not a take-over or
Consortium) merger or a purely financial transaction,
hence such over-regulation of drilling
down to board of respective boards of
members of consortium is unnecessary.
Chapter 2, Bidding 1)Sl. No.3 - Gua Ore Mine visit duration –the 1) Please extend the date since the date Refer Corrigendum
Schedule scheduled date 17/01/2023 is already is already crossed.
crossed
12
2) Sl. No. 4 – the scheduled date for Last 2) Please extend the date since the date
date for receipt of pre-bid queries is already crossed.
(queries to be submitted by bidder to SAIL
through emails to (bsl.proj.tenders@sail.in)
-22/01/2023 is already crossed.
13 Chapter 7, Annexure 1) The given 36 months time period is too 1) Please provide 44 months time No change from NIT. No change in
1, scope of work short to complete the project including pilot period for project completion. NIT.
scale studies of pellet and beneficiation. The
beneficiation circuit can be designed after
pilot scale studies only which may take 6 to
8 months.
Page 8 of 10
2) Please consider to dispose tailings in Tailings to be disposed in No change in
2) Tailings can’t be dry. cake form through filter press. the form of cake and cake NIT.
should be transportable Clarification
through conveyor/truck. Only.
6) Provision of natural gas in burners will 6) Please consider the provision of No change from NIT. No change in
affect the burner efficiency till we don’t use natural gas in burners if required. NIT.
natural gas.
Low Sulphur Heavy Stock Clarification
(LSHS) shall be used as Only.
fuel for burners and Light
Page 9 of 10
Diesel Oil (LDO) shall be
used for start-up and
flame stabilisation of
indurating furnace.
Provision for, use of
Natural Gas in future, as
fuel shall be kept.
14 Clause 7.22.1.vi In the last 7 (seven) years, reckoned from We request you to add “except when No change in NIT No change in
the last date of submission of Proposal as the bidder has received new contract NIT.
declared in the Section 2 Bidding Schedule, from any State /Central Government or
with respect to any tender related to mining Public Sector Undertakings”
issued by, or mining contract entered with,
any State /Central Government or Public
Sector Undertakings, the Bidder itself, or its
direct or indirect Subsidiary or Holding
Company or Subsidiary of Holding Company,
Promoter or Affiliate:
• has suffered forfeiture of the
earnest money deposit/bid security
• has suffered forfeiture of the
performance security for that contract, or
• has suffered termination/
cancellation/ foreclosure of any contracts
due to its/their default.
15 Clause 8.4.3 (b) 3 Maintaining 250 kg/pellet CCS continuously Please consider the required CCS as 220 No change from NIT. No change in
is very tough and also not required for Blast kg/pellet. NIT.
furnace operations.
16 Clause 8.4.4 Maintaining the <45 Fe in tailings/ore is Please consider the % Fe in rejection No change from NIT. No change in
highly tough. based on the Beneficiation test results. NIT.
Page 10 of 10
SELECTION OF MDO FOR EXPANSION OF GUA ORE MINES TO 10 MTPA
(Tender No.: T&C(M)/BSL-JGOM/GUA/BKD/630 Date: 23.12.2022)
Clause No
S. Comments
and Current Clause SAIL Reply Changes
No.
Document from NIT
Clause 1.1 of This Tender Document along with No change in
ITT at Page its Annexure and Schedule is not NIT.
No.4 of 223 transferrable to any third party. It is requested to considered Clarification
one of Consortium Member Any one member may Only.
“Bidding Consortium”: Bidding
purchased the Tender purchase the tender
1 Consortium shall mean a group of
Clause 3.7 of Document and the same can document.
not more than 02 (two) members
ITT at Page be used for Bidding the
which have formed consortium for
No.29 of 223 Consortium.
submission of the Bid in response to
this Document.
The Bidder shall be deemed to have We have Purchased the
visited the mining site and its Tender Document by Paying
surroundings, carefully examined Tender Fee for Rs.5.90 Lakhs
and satisfied himself about the on 19-01-2023 and the Total
Clause 12.3
existing site conditions, availability Bid documents received by us
of ITT at
of local facilities, land requirement on 27-01-2023 through
Page No.13
etc. and to have quoted rates, taking Registered Post. We have not
of 223
into consideration all such visited the site as on date and
2 conditions and matters, which may, further time is required for Refer Corrigendum
in any manner, affect the work and detailed study of the proposal
the cost thereof. and its estimations by the
Site Visit: Bidder.
Clause 13.2 13.2.1 The Bidders are encouraged In view of the above, it is
of ITT at to familiarize themselves with local requested to extend the
Page No.15 conditions and take them into following due dates:
of 223 account in preparing their
Proposals. To obtain first-hand 1. Gua Ore Mine visit duration:
Page 1 of 5
information on the proposed up to 22-02-2023.
assignment and on the local 2. Last date for receipt of pre-
conditions, Bidders are encouraged bid queries :up to 22-02-
to pay a visit to the mine site before 2023.
submitting a Proposal as per the
dates specified in the Bidding 3. Responses to pre-bid
Schedule specified in Chapter 2; queries, Addendum/
13.2.2 It shall be noted that only Corrigendum to be issued
those Bidders who have purchased by SAIL: Suitable date by
this Tender Document through SAIL SAIL.
shall be allowed to make a Site visit 4. Last date for submission of
and the Bidder must carry proposal one month after
documentary evidence/ receiving replies for the
authorization provided by SAIL queries from SAIL.
against purchase of this Tender
Document on the day of Site visit, 5. Opening of Bid Security and
failing which the Bidder shall not be Techno-Commercial
allowed to perform Site visit; Proposals submitted by
13.2.3 It shall be further noted that a bidders: Suitable date by
maximum of 5 members from each SAIL.
Bidder shall be allowed for Site visit.
Bidding
schedule of
Bidding schedule
ITT at Page
No.26 of 223
It is requested the SAIL to No change in
accompany the Bidder for Site Necessary help will be NIT.
Clause Considering Site being a restricted visit to give more clarity on with provided at GOM.
13.2.4 of ITT area, SAIL have right but not local conditions for consider on Clarification
3 preparing Bidding Proposals Only.
at Page obligation to accompany the Bidder
No.15 of 223 for such Site visit by the Bidders; and to obtain information on the
proposed assignment and on
the local conditions etc.,
Page 2 of 5
No change in
The project has four NIT.
major elements Mining,
Beneficiation, Pellet Plant Clarification
and Loading beside Only.
others. The project lies
within the Reserve forest.
The EC has been
prepared considering the
above aspects and a
rationale has been
“Lead Member of the Bidding developed based on
Consortium”: “Lead Member” in probable bidder profiles.
case of Bidding Consortium shall
mean the Member of the
Consortium who is designated by
Clause 3.24
the Consortium Members to It is requested to consider the
of ITT at
4 represent the Consortium in every Lead member who meets the
Page No.31
transactions and decisions and entire financial criteria.
of 223
fulfils Technical eligibility criteria.
The Lead Member shall necessarily
have minimum 51% holding in the
SPV for the entire period of the
Mining Services Agreement.
No change in NIT
Page 3 of 5
Technical Criteria: Experience in No change in
mining operation: Same as replied in point NIT.
4 above.
The Bidder should have performed It is requested to consider the Clarification
the necessary activities of drilling average ROM of minerals for Only.
excavation and hauling, of Run of the last two financial years and
Mine (ROM) of atleast 5.0 (five) current financial year as on the
Million Tonnes (MT) of minerals on date of NIT.
an average annual basis in any 03
(three) financial years in last 06 (six)
years as on date of NIT out of which
at least 3.0 MT, on an average
annual basis in any 03 (three)
Clause 6.1.1
financial years, should be from a
(A) of
single mine.
ITT at Page
No.53 of 223 AND Requested to consider the
Bidder should have developed experience of installation of
(i.e.,installed on its own or through mine infrastructure projects
subcontracting)mining infrastructure (completed or ongoing) that
project(s) that includes Ore includes Ore Handling
Handling Plant/CHP/Mineral Plant/CHP/Mineral Processing
Processing Plant/Coal Plant/Coal Washery/Rapid
Washery/RLSin above mentioned Loading System of 3 MTROM
single mine which has been capacity on its own or through
considered for credentials of at least subcontracting in any of the
3 MTROM mined on an average mines during last Six financial
annual basis in anythree financial years as on the date of NITby
years. any of Consortium member.
Page 4 of 5
It is requested to consider the No change in
following: Same as replied in point NIT.
4 above.
Eligible Bidder: Clarification
ii. The Lead member who Only.
ii. Each member would meet at meets the entire financial
least 40% of the financial criteria.
criteria and both the members
Clause 6.2 of together will meet 100% of the
6 ITT at Page financial criteria.
iii. The experience and
No.55 of 223
iii. In case of bidder being a credentials of the
Consortium, the Lead Member consortium members shall
has to meet the entire be added up and
Technical Qualification Criteria considered for meeting the
as per Clause 6.1.1 A. Technical Criteria instead
of meeting entire technical
criteria by a lead member
alone.