Professional Documents
Culture Documents
Product Management
Product Management
- Scope
- Resources
=Team
- Budget
3. The project you are managing has nine stakeholders. How many channel of communications are there
between these stakeholders?
-9
-8
- 45
= 36
- Contract
- Status meeting
5. A Project with a total funding of $100,000 finished with a BAC value of $95,000. What term can BEST
describe the difference of $5,000?
- Cost Variance
- Management Overhead
- Schedule Variance
7. Which of the following is the most important element of Project Management Plan that is useful in HR
Planning process:
9. Which of the following is not true for a Responsibility Assignment Matrix (RAM):
- Performance Analysis
- Quality Metrics
= Process Analysis
- Quality Audits
- Performance Measurements
12.A planning phase for an engineering component generated 80 engineering drawings. The QA team
randomly selected 8 drawings for inspection. This exercise can BEST be described as example of:
- Inspection
=. Statistical Sampling
- Flowcharting
- Control Charting
13. Andrew has joined as the Project Manager of a project. One of the project documents available to
Andrew lists down all the risks in a hierarchical fashion. What is this document called?
- List of risks.
14.During which stage of Risk planning are risks prioritized based on probability and impact?
- Identify Risks
- Project Officer
- Project Stakeholder
16.Which of the following does NOT generate changes to the Project documents:
= Define Activities
- Sequence Activities
= Define Activities
- Sequence Activities
18.A schedule activity may begin 10 days before the predecessor activity finishes. This is an example of:
= Finish-to-Start
- Start-to-Finish
- Start-to-Start
- Finish-to-Finish
19.Sam Consultancy is planning to buy ten desktops for $1500 each from a leading computer store.
Which type of contract will get signed in this case?
= Purchase Order
-. Fixed cost
20.Alice is a Project Manager. She is coordinating a bidder conference to allow vendors to get
clarification on the work that needs to be performed. Which phase of Project Management is in
progress.
=Conduct Procurements
-. Plan Procurements
-. Control Procurements
-. Close Procurements
39. Which one of the following is NOT a part to study under Market Appraisal?
=Government
-Customers
-Competitors
-Middlemen
40. What is to be prepared as a first step to avail finance for a new project?
-Promoter’s bio-data
=Project Repor
-Detailed Report
-Summary
41. Projected Cash flow is mentioned in which part of the Project Report?
=Financial Details
-Summary
-Technical Arrangements
-Production Process
42. New Project Idea may be generated by thinking along_____
-Rearrangement
-Reversal
-Modification
=All of the above
43. Traditionally Indian Business had shortage of inputs like Power, Foreign Exchange,
Important Raw Material, Supply of Agricultural Raw materials etc.
-False
=True
44. With respect to a project resources refer to____________
-Machinery
-Man power
-Materials
=All of the above
51. Which of the following is NOT considered while making choice of technology?
=Mineral Product
-Principle Inputs
-Ease of Absorption
Plant Capacity
52. Which of the following is not a Causal Method for Demand Forecasting?
= Exponential Smoothing Method
- Leading Indicator Method
- Chain Ratio Method
- Econometric Method
53. Delphi Method is which type of Demand Forecasting Method?
-Time Series Projection
=Qualitative
-Causal
-None of these
54. Which of these is not a method of Demand Forecasting?
-Time Series Projection Methods
-Qualitative Methods
=Financial Methods
-Causal Methods
=
55. Which of the following is NOT a Processed Industrial Material and Component?
-Manufactured Parts
-Spare parts
-Base Metals
=Jute
56. Which of the following is NOT a Demographic Characteristic of a Consumer?
=Response
-Income
-Gender
-Age