This document contains a bill of quantities for a two storey residential project. It lists 7 structural components - site/civil works, foundation works, column works, beam works, slab works, stair works, and roofing works. For each component, it specifies materials, quantities, units of measurement, costs, and markups. The document was prepared by 5 students for a quantity surveying course, and submitted to their professor. It provides a breakdown of estimated costs for the structural elements of the residential building but does not include actual costs.

Uploaded by

Claire Matnog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
140 views1 page

Quantity Surveying Student Project

This document contains a bill of quantities for a two storey residential project. It lists 7 structural components - site/civil works, foundation works, column works, beam works, slab works, stair works, and roofing works. For each component, it specifies materials, quantities, units of measurement, costs, and markups. The document was prepared by 5 students for a quantity surveying course, and submitted to their professor. It provides a breakdown of estimated costs for the structural elements of the residential building but does not include actual costs.

Uploaded by

Claire Matnog
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project Name : Two Storey Residencial

Location : (this should be complete address)


Total Floor Area : (it depends on the plans you have)
Course : CE 207 - QUANTITY SURVEYING
Section : CE22S__
Professor : Engr. Jerica Lyn P. Cruz

Bill of Quantities

Item Description Quantity UOM Material Labor Unit Price Total Amount Mark-up Selling Amount
I. Site/Civil Works
a . Site Clearing lot N/A - - 15% -
b . Excavation m3 N/A - - 15% -
c . Backfill m3 N/A - - 15% -
d . Gravel Bedding (1/4") m2 - - 15% -
e . Hauling and Disposal lot N/A - - 15% -
Subtotal: Site/Civil Works - -
II. Foundation Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Foundation Works - -
III. Column Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Column Works - -
IV. Beam Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Beam Works - -
V. Slab Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Slab Works - -
VI. Stair Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Stairs Works - -
VII. Masonry Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 40) kgs - - 10% -
d . Stiffener column lm - - 10% -
e . Stiffener Beam lm - - 10% -
Subtotal: Masonry Works - -
VIII. Roofing Works
a . Roofing Sheet (Please specify what sqm
material: GI Sheet/ Rib Type/
Spandrel/etc.) - - 10% -
b . Steel (for trusses) kgs - - 10% -
c . Concrete (if the beam is made of RCB) m3 - - 10% -
d . Formworks m2 - - 10% -
e . Rebarworks (grade 60) kgs - - 10% -
f . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Roofing Works - -
Total - Structural Works - -
Vat (12%) - -
Grand Total Amount - -

Prepared by:

Student Name #1(Surname, Given Name Middle Initial) Student Number Signature
Student Name #2(Surname, Given Name Middle Initial) Student Number Signature
Student Name #3(Surname, Given Name Middle Initial) Student Number Signature
Student Name #4(Surname, Given Name Middle Initial) Student Number Signature
Student Name #5(Surname, Given Name Middle Initial) Student Number Signature

Submitted to:

Engr. Jerica Lyn P. Cruz

You might also like