Project Name : Two Storey Residencial
Location : (this should be complete address)
Total Floor Area : (it depends on the plans you have)
Course : CE 207 - QUANTITY SURVEYING
Section : CE22S__
Professor : Engr. Jerica Lyn P. Cruz
Bill of Quantities
Item Description Quantity UOM Material Labor Unit Price Total Amount Mark-up Selling Amount
I. Site/Civil Works
a . Site Clearing lot N/A - - 15% -
b . Excavation m3 N/A - - 15% -
c . Backfill m3 N/A - - 15% -
d . Gravel Bedding (1/4") m2 - - 15% -
e . Hauling and Disposal lot N/A - - 15% -
Subtotal: Site/Civil Works - -
II. Foundation Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Foundation Works - -
III. Column Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Column Works - -
IV. Beam Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Beam Works - -
V. Slab Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Slab Works - -
VI. Stair Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 60) kgs - - 10% -
d . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Stairs Works - -
VII. Masonry Works
a . Concrete m3 - - 10% -
b . Formworks m2 - - 10% -
c . Rebarworks (grade 40) kgs - - 10% -
d . Stiffener column lm - - 10% -
e . Stiffener Beam lm - - 10% -
Subtotal: Masonry Works - -
VIII. Roofing Works
a . Roofing Sheet (Please specify what sqm
material: GI Sheet/ Rib Type/
Spandrel/etc.) - - 10% -
b . Steel (for trusses) kgs - - 10% -
c . Concrete (if the beam is made of RCB) m3 - - 10% -
d . Formworks m2 - - 10% -
e . Rebarworks (grade 60) kgs - - 10% -
f . Rebarworks (grade 40) kgs - - 10% -
Subtotal: Roofing Works - -
Total - Structural Works - -
Vat (12%) - -
Grand Total Amount - -
Prepared by:
Student Name #1(Surname, Given Name Middle Initial) Student Number Signature
Student Name #2(Surname, Given Name Middle Initial) Student Number Signature
Student Name #3(Surname, Given Name Middle Initial) Student Number Signature
Student Name #4(Surname, Given Name Middle Initial) Student Number Signature
Student Name #5(Surname, Given Name Middle Initial) Student Number Signature
Submitted to:
Engr. Jerica Lyn P. Cruz