You are on page 1of 2

ELITE MARINE CONSTRUCTION CORPORATION

KYNSNA Bldg. Block 9, Lot 4-6 Fernando St. corner Francisco St. Tondo, Manila

PROJECT : PETRON PARKING (BLOCK 15) DRAINAGE - LABOR ONLY


LOCATION : MANILA HARBOUR CENTER
OWNER : SL HARBOR AND BULK TERMINAL CORPORATION
SUBJECT : BILL OF QUANTITIES

DATE : March 4, 2024

MATERIALS EQUIPMENT LABOR


ITEM NO. DESCRIPTION SPECIFICATIONS QTY. UNIT TOTAL AMOUNT WT.%
UNIT COST AMOUNT UNIT COST AMOUNT UNIT COST AMOUNT
A. EARTHWORKS
A.1 Structure Excavation 275.00 cu.m. - - - - #DIV/0!

- - - - #DIV/0!
B.CIVIL WORKS

B.1 DRAINAGE
B.1.1 Structural Steel, furnished, and fabricated (Angle Bars) 5,201.28 kg. - - - - #DIV/0!
B.1.2 Reinforcing Steel Bars Gr. 40 332.67 kg. - - - - #DIV/0!
B.1.3 Reinforcing Steel Bars Gr. 60 25,456.00 kg. - - - - #DIV/0!
B.1.4 Ready Mix Concrete 3000 Psi G-3/4 at 14 Days 149.00 cu.m. - - - - #DIV/0!
B.1.5 Formworks and Falseworks 1,677.00 sq.m. - - - - #DIV/0!
B.1.6 Cement Plaster Finish (with Water Proofing Cement Base) 774.00 sq.m. - - - - #DIV/0!
B.1.7 Steel Gratings (Drainage) for fabrication 430.00 l.m. - - - - #DIV/0!

B.2 CATCH BASIN


B.2.1 Structural Steel, furnished, and fabricated (Angle Bars) 387.07 kg. - - - - #DIV/0!
B.2.2 Reinforcing Steel Bars Gr. 40 6.19 kg. - - - - #DIV/0!
B.2.3 Reinforcing Steel Bars Gr. 60 473.60 kg. - - - - #DIV/0!
B.2.4 Ready Mix Concrete 3000 Psi G-3/4 at 14 Days 2.77 cu.m. - - - - #DIV/0!
B.2.5 Formworks and Falseworks 31.20 sq.m. - - - - #DIV/0!
B.2.6 Cement Plaster Finish (with Water Proofing Cement Base) 14.40 sq.m. - - - - #DIV/0!
B.2.7 Steel Gratings (Catch Basin) for fabrication 8.00 lot - - - - #DIV/0!

- - - - #DIV/0!

TOTAL MATERIAL COST: - #DIV/0!


TOTAL EQUIPMENT COST: - #DIV/0!
TOTAL LABOR COST: - #DIV/0!

TOTAL DIRECT COST: - #DIV/0!

NOTE
- Unit cost per linear meter = PHP 0.00 per linear meter

Prepared by: Checked by: Noted by:

CHRISTIAN DAYRIT ANGELO TADLIP/ANGELO AMARGO FLOREL CRUZ


QS Estimator Project Engineer/Structural Designer Project Consultant

You might also like