Doc.

No: BBJK-ARC-METH-0001

Date : 20 October 2015 Revision : 2


PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

WORK METHOD STATEMENT


BLOCK WALL INSTALLATION, PLASTERING &
SMOOTH FINISH

Revision
Rev. No. Date Status Revision Details
R0 20-Apr-15 Submit for Approval
R1 26-May-15 Revised, Re-Submit for Approval
R2 20-Oct-15 Revised, Re-Submit for Approval

Approval
Prepared by, Review by, Checked by, Approved by, Acknowledge by,

M. RIVAI RIDWAN HERI TRIWINARTO IWAN CHANDRA LAWRENCE MBANU M. FIRDAUS


Project Engineer Engineering Manager Construction Manager Project Manager QA/QC Manager

Page 1 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
1.0 PURPOSE TUJUAN

Make sure results of the work block wall pairs Memastikan hasil pekerjaan pasangan
according to plan, the quality and precision dinding bata ringan sesuai dengan rencana,
shape, not leaking, not convex, and concave, mutu dan bentuk yang presisi, tidak bocor,
to obtain structural condition according with tidak cembung, dan tidak cekung, untuk
the specifications. memperoleh kondisi struktur yang sesuai
dengan spesifikasi.
Make sure there are no results that deviate Memastikan tidak ada hasil pekerjaan yang
work, if there are deviated so need to repair menyimpang, jika ada yang menyimpang
work. maka diperlukan pekerjaan perbaikan.

2.0 SCOPE LINGKUP

The scope of this work includes the provision Ruang lingkup pekerjaan ini meliputi
of labor, materials, equipment and other penyediaan tenaga kerja, bahan-bahan,
assistive devices, including implementation in peralatan dan alat-alat bantu lainnya termasuk
accordance with that stated in the shop pelaksanaannya sesuai dengan yang
drawings, to a description in the specification. dinyatakan dalam shop drawing, memenuhi
This work can be applied to all block wall uraian di spesifikasi. Pekerjaan ini dapat
pairs work in each floor. diaplikasikan pada semua pekerjaan pasangan
dinding bata ringan di setiap lantai.
The procedures contained within should be Prosedur ini harus diterapkan kepada semua
communicated to all personnel involved and pihak yang terlibat dan bertanggung jawab
responsible for these works. atas pekerjaan ini.

3.0 MATERIALS MATERIAL

1. Pre-cast Practical Column by Sub-cont. 1. Kolom Praktis Pre-cast by Sub-cont.


2. Pre-cast Lintel Beams by Sub-cont. 2. Balok Lintel Pre-cast by Sub-cont.
3. Round Bar d10 (dowels) 3. Besi tulangan d10 (dowel)
4. Hollow Steel 40x20x3000 mm 4. Besi Hollow 40x30x3000 mm
profil for the binder yarn profilan untuk pengikat benang
5. Epoxy Resin F.815 LV Ex. UPS Epoxy 5. Epoxy Resin F.815 LV Ex. UPS Epoxy
Multi-Purpose (DOC. NO: BBJK-ARC- Multi-Purpose (DOC. NO: BBJK-ARC-
MSB-0081) MSB-0081)
6. Instant Cement MU-380 (DOC. NO: 6. Semen Instan MU-380 (DOC. NO:
BBJK-STR-MSB-0053) BBJK-STR-MSB-0053)
for adhesive between block untuk perekat antar bata ringan

Page 2 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
7. Instant Cement MU-301 (DOC. NO: 7. Semen Instan MU-301 (DOC. NO:
BBJK-STR-MSB-0054) BBJK-STR-MSB-0054)
for block plaster untuk plesteran bata ringan
8. Instant Cement MU-200 (DOC. NO: 8. Semen Instan MU-200 (DOC. NO:
BBJK-STR-MSB-0057) BBJK-STR-MSB-0057)
for plaster finish coat untuk acian plester
9. Block 100x200x600 mm 9. Bata Ringan 100x200x600 mm
10. Block 150x200x600 mm 10. Bata Ringan 150x200x600 mm
11. Block 200x200x600 mm 11. Bata Ringan 200x200x600 mm
12. Blockwork Reinforcement BM 60 12. Blockwork Reinforcement BM 60
(60x1220 mm) Ex. Expanda Metal Megah (60x1220 mm) Ex. Expanda Metal
(DOC. NO: BBJK-STR-MSB-0077) Megah (DOC. NO: BBJK-STR-MSB-
0077)
13. Blockwork Reinforcement BM 80 13. Blockwork Reinforcement BM 80
(80x1220 mm) Ex. Expanda Metal Megah (80x1220 mm) Ex. Expanda Metal
(DOC. NO: BBJK-STR-MSB-0077) Megah (DOC. NO: BBJK-STR-MSB-
0077)
14. Blockwork Reinforcement BM 100 14. Blockwork Reinforcement BM 100
(100x1220 mm) Ex. Expanda Metal (100x1220 mm) Ex. Expanda Metal
Megah (DOC. NO: BBJK-STR-MSB- Megah (DOC. NO: BBJK-STR-MSB-
0077) 0077)
15. Rockwool Density 60 kg/m2 Ex. Tombo 15. Rockwool Density 60 kg/m2 Ex. Tombo
(DOC. NO: BBJK-ARC-MSB-0067) (DOC. NO: BBJK-ARC-MSB-0067)
16. Sikaflex-11 FC Non Fire-rated Sealent Ex. 16. Sikaflex-11 FC Non Fire-rated Sealent
SIKA (DOC. NO: BBJK-ARC-MSB- Ex. SIKA (DOC. NO: BBJK-ARC-MSB-
0080) 0080)
17. Sikasil FS-665 SL Fire-rated Sealant (2cm 17. Sikasil FS-665 SL Fire-rated Sealant
gap, 1cm deep) Ex. SIKA (DOC. NO: (lebar 2cm, dalam 1 cm) Ex. SIKA
BBJK-ARC-MSB-0034) (DOC. NO: BBJK-ARC-MSB-0034)
18. Backing Rod 20 mm Ex. SIKA (DOC. 18. Backing Rod 20 mm Ex. SIKA (DOC.
NO: BBJK-ARC-MSB-0069) NO: BBJK-ARC-MSB-0069)
19. Angle Steel 100x100x6x150 mm (DOC. 19. Baja Siku 100x100x6x150 mm (DOC.
NO: BBJK-STR-MSB-0095) NO: BBJK-STR-MSB-0095)
20. Corner Bead Type MMJ B001 20. Corner Bead Type MMJ B001
(24x24x0.5mm) Ex. Batara Surya (DOC. (24x24x0.5mm) Ex. Batara Surya (DOC.
NO: BBJK-ARC-MSB-0033) NO: BBJK-ARC-MSB-0033)
21. Instant Mix Concrete K-225 Ex. 21. Beton Mix Instan K-225 Ex. INDOKON
INDOKON (DOC. NO: BBJK-STR-MSB- (DOC. NO: BBJK-STR-MSB-0093)
0093)
22. Clean Water 22. Air Bersih

Page 3 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
4.0 EQUIPMENT PERALATAN

1. Drilling Machine 1. Mesin Bor


2. Hand Mixer 2. Mixer Tangan
3. Bucket/ Container Mortar 3. Ember/ Wadah Adukan
4. Timber 4. Papan
5. Plywood 5. Plywood
6. Yarn 6. Benang
7. Nail 7. Paku
8. Thumbtack 8. Paku Payung
9. Block Saw 9. Gergaji Bata Ringan
10. Smooth Trowel 10. Trowel Halus
11. Scalloped Roskam 11. Roskam Bergigi
12. Wire Brush 12. Sikat Kawat
13. Paint Brush 13. Kuas Cat
14. Roller Brush 14. Kuas Roller
15. Steel/ Aluminium Trowel 15. Jidar Baja/ Aluminium
16. Cement Trowel 16. Sendok Semen
17. Hammer 17. Palu
18. Rubber Hammer 18. Palu Karet
19. Waterpas (1000mm, 600mm) 19. Waterpas (1000mm, 600mm)
20. Gauge Tool (qualified good tool) 20. Alat Pengukur (meteran berkualitas baik)
21. Angle Ruler 21. Penggaris Siku
22. Flexible Hose 22. Selang
23. Broom 23. Sapu

5.0 PROCEDURE PROSEDUR

1. Before starting work of block wall 1. Sebelum memulai pekerjaan pemasangan


installation, the inspection of the structure dinding bata ringan, inspeksi pekerjaan
work must be agreed upon between the struktur harus sudah disetujui bersama
QA/QC and Owner to proceed to the next QA/QC dan Owner untuk melanjutkan ke
process. proses selanjutnya.

Page 4 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
2. Construction of block walls 2. Konstruksi dinding bata ringan
Prepare all the tools and materials. Pesiapkan semua alat dan material.

The floor/ slab areas to be installed Daerah lantai/ slab yang akan
will be clearly marked accordance with dipasang dinding bata ringan harus
the approve shop drawing and these ditandai dengan jelas sesuai shop
areas will be agreed with the Owner. drawing yang sudah disetujui dan area
tersebut harus disepakati bersama
dengan Owner.
The floor slab where block walls to be Lantai/slab yang akan didirikan
built will be cleaned first at the bottom dinding bata ringan dibersihkan
surface from debris, dirt and oils that terlebih dahulu dasar permukaannya
can reduce adhesion mortar. dari serpihan, kotoran dan minyak
yang dapat mengurangi daya rekat
adukan.

Marking for block walls & openings Buat tanda marking untuk dinding
will be done on structural floor slab bata ringan & opening di lantai
according to the installation area and struktural slab sesuai dengan daerah
approved shop drawings. pemasangan dari shop drawing yang
disetujui.
Both the QA/QC and Owner approval Baik QA/QC dan Owner membuat
and signature required to proceed. berita acara persetujuan yang harus
ditandatangani bersama untuk
melanjutkan ke proses selanjutnya.

Page 5 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Areas to be installed block wall will be Daerah yang akan dipasang dinding
installed protection, so that the process bata ringan akan dipasang proteksi,
of implementation is not disturbed by agar proses pelaksanaan tidak
the traffic of workers and vehicles. terganggu oleh lalu-lintas pekerja dan
kendaraan.
Before starting the installation work of Sebelum memulai pekerjaan
block wall, check first for the area pemasangan dinding bata ringan,
finishing materials that will be used periksa terlebih dahulu untuk daerah
(paint, marble, etc.). tersebut material finishing apa yang
akan digunakan (cat, marmer, dll).
If in the area of block wall installation Jika di daerah pemasangan dinding
there is a screed or island, then the bata ringan terdapat screed atau
block wall will be installed first. island, maka dinding bata ringan akan
dipasang terlebih dahulu.

Install the profile perpendicular to Pasang profil besi hollow tegak lurus
hook the thread as a guide to both ends untuk kait benang sebagai pedoman
of a block wall. untuk kedua ujung pasangan dinding
bata ringan.

The floor/ slab should be given a Lantai/ slab harus dikasarkan


roughened surface before mortar. permukaannya sebelum diberi mortar.

Page 6 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Reinforcement anchors will be Angkur besi tulangan akan disediakan
provided for all practical columns. untuk semua kolom praktis.
Drill concrete as much as 4 points for a Bor beton sebanyak 4 titik untuk stek
starter bar practical column at kolom praktis pada pertemuan dengan
intersection with the floor/ slab at the lantai/ slab bagian atas dan bawah jika
top and bottom if not provided starter tidak disediakan besi stek
bars. penyambung.

Prepare adhesive mortar by using Menyiapkan mortar perekat


instant cement MU-301 with 10mm menggunakan semen instan MU-301
thick for leveling floors, pour the dengan tebal 10mm untuk meratakan
mortar adhesive on a container and lantai, tuangkan mortar perekat pada
then gradually add water and stir until suatu wadah kemudian tambahkan air
evenly distributed (see material secara bertahap dan aduk hingga
specifications for water requirements). merata (lihat spesifikasi material
untuk kebutuhan air).

Page 7 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
All block wall installation must be Semua instalasi dinding bata ringan
reinforced with practical column every harus diperkuat dengan kolom praktis
9m2 with a maximum distance of 3m setiap 9m2 dengan jarak tiap-tiap
between practical columns. kolom praktis maksimum 3m.
Install practical column on the Pasang kolom praktis dilokasi yang
predetermined area, then given local telah ditentukan, berikan epoxy lokal
epoxy on the starter bars hole of pada lubang joint besi stek kolom
practical column. praktis.
In each practical column already Pada setiap kolom praktis sudah
installed reinforced starter bars every dipasang angkur stek besi tulangan
distance of 600 mm, which serves as setiap jarak 600 mm yang berfungsi
an anchor between the practical sebagai angkur antara kolom praktis
columns with block wall. dengan dinding bata ringan.
For ease of identification, practical Untuk memudahkan identifikasi,
column position should be marked on posisi kolom praktis harus diberi
the floor and soffit. tanda pada lantai dan soffit.

Page 8 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
If the anchors have not been provided Jika angkur belum disediakan sesuai
as per the approved shop drawing/ dengan shop drawing yang disetujui/
required dimensions, local epoxy will dimensi yang dibutuhkan, epoxy lokal
be used for anchoring the missing akan digunakan untuk menambatkan
reinforcement from the structural besi tulangan yang tidak disediakan
beams, walls & columns dari kolom, dinding dan balok
struktural.

Stretch 2 rows of yarn (top and middle Rentangkan 2 baris benang (atas dan
block) as a reference/ guide from both tengah bata ringan) sebagai acuan/
of hollow steel profiles until strained. petunjuk dari kedua profil besi hollow
hingga tegang.

Page 9 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Blocks before being installed does not Blok bata ringan sebelum dipasang
need to be dampened, watered or tidak perlu dibasahi, disiram atau
soaked completely, but enough part of direndam seluruhnya, tetapi cukup
the block that will be given mortar or bagian blok yang akan diberi adukan
plaster moistened with a water first. atau plesteran dibasahi dengan air
This wetting is necessary to prevent terlebih dahulu. Pembasahan ini perlu
water from mortar or plaster was not untuk mencegah air adukan atau
sucked in by the blocks. plesteran tidak tersedot oleh blok bata
ringan.

Install the block wall with adhesive Pasang dinding bata ringan dengan
mortar by using instant cement MU- mortar perekat menggunakan Semen
380 with space 3mm thick one by Instant MU-380 ketebalan siar 3mm
one, following the horizontal reference satu per satu, mengikuti acuan benang
thread tied on both of hollow steel mendatar yang diikatkan dari kedua
profiles. profilan besi hollow.

Page 10 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

Excessive spacing thickness should not Ketebalan siar yang berlebihan jangan
happen. Flat space always cultivated a sampai terjadi. Siar-siar datar selalu
horizontal straight line. Spaced upright diusahakan merupakan garis lurus
always endeavored not to constitute horizontal. Siar-siar tegak selalu
one line, must be crossed. diusahakan agar tidak merupakan satu
garis, harus bersilang.

Page 11 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
In every block walls will be coated Pada setiap dinding bata ringan akan
with the material of block reinforcing dilapisi dengan material penguat bata
Expanda every 600mm high or every 3 ringan Expanda setiap tinggi 600mm
layers block. Expanda must be fixed to atau setiap 3 lapis bata ringan.
a block wall horizontal direction with Expanda harus disematkan ke dinding
nails, thumbtack, screws, etc. bata arah horizontal dengan paku,
paku payung, sekrup, dll.

Page 12 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
The maximum height of a block wall Tinggi maksimum pasangan dinding
in a single pairs of on the wide and free bata ringan dalam sekali pasang pada
fields is 7 layer (1.4m height), if the bidang yang lebar dan bebas adalah 7
field of pair is not wide and free or layer (tinggi 1.4m), bila bidang
meet interlocking corner, the pair can pasang tidak lebar atau bertemu sudut
be implemented at once (fixed). interlocking, pasangan dapat
dilaksanakan sekaligus (mentok).

The first stage of block wall Pemasangan dinding bata ringan tahap
installation was set with a high 1.4m pertama didirikan dengan tinggi
and the same applies to the installation 1.4m dan berlaku sama untuk
of block wall next stage. Installation of pemasangan dinding bata ringan tahap
the next stage is then performed after berikutnya. Pemasangan tahap
the pairs of block dry/ strong ( 12 selanjutnya dilakukan setelah
hours). pasangan bata ringan tersebut kering/
kuat (12 jam).

Page 13 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
After a pair of block wall almost Setelah pasangan dinding bata ringan
reaching to the desired height do hampir mencapai ketinggian yang
casting on site by using Instant Mix diinginkan, lakukan pengecoran di
Concrete K-225 Ex. Indokon at the top lokasi menggunakan beton mix instan
of the practically column at a meeting K-225 Ex. Indokon pada bagian atas
with the upper floor/ slab, which has kolom praktis pada pertemuan dengan
been drilled as many as 4 points and lantai/ slab bagian atas yang sudah di
provided starter bars. Pouring concrete bor beton sebanyak 4 titik dan
will be done after the pair of block wall disediakan besi stek penyambung.
dry so as not to shake or tilted the wall Pengecoran dilakukan setelah
when formwork installed. pasangan dinding bata ringan kering
agar dinding tidak goyang atau miring
saat dipasang bekisting.

Continue the installation of block wall Lanjutkan pemasangan dinding bata


in accordance with the specified ringan sesuai elevasi yang ditentukan
elevation after practical column casted. setelah kolom praktis di cor.

Page 14 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

All block walls will have sheet layer of Semua dinding bata ringan akan diberi
Rockwool between block walls and lapisan lembar Rockwool di antara
soffit to fill the gap at internal face. dinding bata ringan dan soffit untuk
mengisi celah bagian dalam.
The gap at external face behind Celah dinding bata ringan bagian luar
Rockwool will be filled with Sikasil di balik Rockwool akan diisi dengan
FS-665 SL Fire-rated Sealant 2cm gap, Sikasil FS-665 SL Fire-rated Sealant
1cm deep Ex. SIKA (if a fireproof gap 2cm, dalam 1cm Ex. SIKA (jika
wall) or will be filled with Sikaflex-11 merupakan dinding tahan api) atau
FC Non Fire-rated Sealent Ex. SIKA akan diisi dengan Sikaflex-11 FC Non
(if a non-fireproof/ normal wall). Fire-rated Sealent Ex. SIKA (jika
Literature of 2 sealent materials will be merupakan dinding tidak tahan api/
provided. normal). Literatur 2 bahan sealant
akan disediakan.
All block walls must have Backing Semua dinding bata ringan harus
Rod behind sealant. diberi Backing Rod di balik sealant.
Then on the top of the block wall Kemudian pada bagian atas dinding
behind Backing Rod given a retaining bata ringan tersebut di balik Backing
Steel Angle 100x100x6x150 mm on Rod diberi penahan Besi Siku
both sides of the block wall, installed 100x100x6x150 mm pada kedua sisi
every distance of 1200 mm. dinding bata ringan, dipasang setiap
jarak 1200 mm.

Page 15 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

To fill the gap on the top of the block Untuk mengisi celah koneksi dinding
wall connection with smartdeck will be bata ringan bagian atas dengan
filled with pieces of block which will smartdeck akan diisi dengan potongan
be cut to adjust to the shape of bata ringan yang dipotong
smartdeck profile. menyesuaikan dengan bentuk profil
smartdeck.

Page 16 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Pre-cast lintel beams will be placed in Balok lintel pre-cast akan ditempatkan
each opening based on the approved di tiap-tiap opening, berdasarkan shop
shop drawing at the required level. drawing yang disetujui di elevasi yang
telah ditentukan.
If the starter bars reinforcement ( 25 Jika stek besi tulangan (panjang 25
mm lengths) has not been provided in mm) untuk balok lintel belum
the practical column, local epoxy will disediakan di kolom praktis, epoxy
be used to anchor starter bars lokal akan digunakan untuk
reinforcement which is not provided in menambatkan besi tulangan yang
the practical column. tidak disediakan di kolom praktis
tersebut.

Pouring concrete is done on site at Pada pertemuan sudut antara kolom


intersection of the corner between the praktis dan balok lintel dilakukan
practical columns and lintel beams by pengecoran di lokasi menggunakan
using Instant Mix Concrete K-225 Ex. beton mix instan K-225 Ex. Indokon.
Indokon. Pouring concrete will be done Pengecoran dilakukan setelah
after the pair of block wall dry so as pasangan dinding bata ringan kering
not to shake or tilted the wall when agar dinding tidak goyang atau miring
formwork installed. saat dipasang bekisting.

Page 17 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

Before doing plastering, first installed Sebelum dilakukan plesteran, terlebih


Expanda to coating each practical dahulu dipasang Expanda untuk
columns on the outer part. Expanda melapisi masing-masing kolom
must be fixed to the vertical direction praktis di bagian luar. Expanda harus
between the practical columns and disematkan dengan arah vertical di
block walls by using nails, thumbtack, antara kolom praktis dan bata ringan
screws, etc. menggunakan paku, paku payung,
sekrup, dll.
Groove will be placed to coat Expanda Tali air akan ditempatkan untuk
in each practical column, then coated melapisi Expanda di masing-masing
with Sikasil FS-665 SL Fire-rated kolom praktis, kemudian dilapisi
Sealant 2cm gap, 1cm deep Ex. SIKA dengan Sikasil FS-665 SL Fire-rated
(if a fireproof wall) or will be coated Sealant gap 2cm, dalam 1cm Ex.
with Sikaflex-11 FC Non Fire-rated SIKA (jika merupakan dinding tahan
Sealent Ex. SIKA (if a non-fireproof/ api) atau akan diisi dengan Sikaflex-
normal wall). Literature of 2 sealent 11 FC Non Fire-rated Sealent Ex.
materials will be provided. SIKA (jika merupakan dinding tidak
tahan api/ normal). Literatur 2 bahan
sealant akan disediakan.

Page 18 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

After installation of block walls Setelah pemasangan dinding bata


completed, both QA/QC and Owner ringan selesai, baik QA/QC dan
make an agreement official report to be Owner membuat berita acara
signed together to proceed to the next persetujuan yang harus ditandatangani
process. bersama untuk melanjutkan ke proses
selanjutnya.
Before proceeding to the plastering Sebelum melanjutkan ke proses
process, check again whether there is a plesteran, periksa kembali apakah ada
part of the MEP work who has not bagian dari pekerjaan MEP yang
been prepared/ installed. belum disiapkan/ dipasang.
The work of block wall plaster had to Pekerjaan plester dinding bata ringan
wait MEP installation work completed. harus menunggu pekerjaan instalasi
MEP selesai.

Page 19 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
3. Plastering the block walls 3. Plesteran dinding bata ringan
Prepare all the tools and materials. Persiapkan semua alat dan material.

Before plastering work begins, the pair Sebelum pekerjaan plesteran dimulai,
of mortar should be allowed to dry up pasangan adukan harus dibiarkan
well in advance (24 hours). dahulu untuk mengering dengan baik
(24 jam).
All the plastering walls of the block Seluruh plesteran dinding dari
blocks pair will be use the Instant pasangan bata ringan akan
Cement MU-301 with 12 mm menggunakan Semen Instan MU-301
thickness. dengan tebal 12 mm.
To maintain the cleanliness of the Untuk menjaga kebersihan lokasi,
location, use intact plywood and placed gunakan triplek yang utuh dan
in the walls area that will be plaster. diletakkan di area dinding yang akan
di plester.
Prepare plastering mortar using Instant Menyiapkan adukan plesteran
Cement MU-301, pour instant cement menggunakan Semen Instan MU-301,
in a bucket/ container and then tuangkan sement instan pada suatu
gradually add water and stir until ember/ wadah kemudian tambahkan
evenly distributed using a Hand Mixer air secara bertahap dan aduk hingga
for the best results (see material merata menggunakan Hand Mixer
specifications for water requirements). untuk hasil terbaik (lihat spesifikasi
material untuk kebutuhan air).

Page 20 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Lightly dampen using sprayer and Basahkan menggunakan alat penyemprot dan
clean wall surfaces that will be applied bersihkan bidang permukaan dinding yang
plaster. akan diaplikasikan plesteran.

Check the flatness of surfaces that will Periksa kerataan bidang permukaan
be in plaster using a waterpas/ steel yang akan di plester menggunakan
hollow. waterpas/ besi hollow.

Installing guidance lane as instructions Pasang kepalaan sebagai petunjuk


in accordance with a predetermined sesuai dengan ketebalan yang telah
thickness and wait until dry 24 hours ditentukan dan tunggu hingga
before plastering stage begins. mongering 24 jam sebelum tahapan
plesteran dimulai.

Page 21 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

Apply plastering mortar layer by layer Aplikasikan mortar plesteran lapis


by means put it using a large cement demi lapis dengan cara di kamprot
trowel. menggunakan sendok semen yang
besar.
In the area of connection with guidance Pada daerah sambungan dengan
lane should be stressed at the time of kepalaan harus diberi tekanan pada
put plastering (to obtain perfect contact saat kamprot (untuk mendapatkan
with the connection guidance lane). kontak yang sempurna dengan
sambungan kepalaan).

Page 22 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Then flatten the results of plastering Kemudian ratakan hasil plesteran
using jidar with guidance lane as a menggunakan jidar dengan kepalaan
reference/ guide. sebagai acuan/ petunjuk.

The last flatten and puree the plastering Terakhir ratakan dan haluskan
using iron Roskam. plesteran menggunakan Roskam besi.

If there is one field plastering Jika dalam satu bidang plesteran


connection, then it should be given terdapat sambungan, maka harus
champers. diberi champer.
After the plastering work completed, Setelah pekerjaan plesteran selesai,
for the smooth finish work have to wait untuk pekerjaan acian harus
the plaster to dry/ strong ( 24 hours). menunggu pasangan plesteran tersebut
With notes room temperature and kering/ kuat (24 jam). Dengan
normal weather conditions. catatan suhu ruangan dan kondisi
cuaca normal.
After plastering of block walls Setelah plesteran dinding bata ringan
completed, both QA/QC and Owner selesai, baik QA/QC dan Owner
make an agreement official report to be membuat berita acara persetujuan
signed together to proceed to the next yang harus ditandatangani bersama
process. untuk melanjutkan ke proses
selanjutnya.

Page 23 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
Before proceeding to the smooth finish Sebelum melanjutkan ke proses acian,
process, check again whether there is a periksa kembali apakah ada bagian
part of the MEP work that has not been dari pekerjaan MEP yang belum
prepared/ installed. disiapkan/ dipasang.

4. Smooth finish block walls 4. Acian dinding bata ringan


Prepare all the tools and materials. Persiapkan semua alat dan material.
Before smooth finish work begins, Sebelum pekerjaan acian dimulai,
plastering pair should be allowed to pasangan plesteran harus dibiarkan
dry out well in advance (24 hours). dahulu untuk mengering dengan baik
(24 jam).
The whole of smooth finish on block Seluruh acian dinding dari pasangan
wall pair will use Instant Cement MU- bata ringan akan menggunakan Semen
200. Instan MU-200.

Before the application of smooth finish Sebelum aplikasi acian dimulai,


started, first wetted the wall to become terlebih dahulu dinding dibasahi agar
saturated/ moist. menjadi jenuh/ lembab.

Page 24 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
For the smooth finish work cannot use Untuk pekerjaan acian tidak boleh
materials that can absorb water, such menggunakan bahan yang dapat
as paper. menyerap air, seperti kertas.
Mortar is applied layer by layer, the Adukan diaplikasikan lapis demi
first layer to cover the pores of plaster. lapis, lapisan pertama untuk menutupi
pori-pori plester.

Smooth finish applications in the field Aplikasi acian dalam satu bidang
of surface should not be interrupted/ permukaan tidak boleh terputus/
stopped to avoid cracking. berhenti untuk menghindari retak.
Then do the finishing in a way Kemudian lakukan finishing dengan
scrubbed using Trowel with vertical/ cara digosok menggunakan Trowel
horizontal direction with a thickness of dengan arah vertikal/ horizontal
1.5 - 3 mm. dengan ketebalan 1.5 - 3 mm.
The tolerances for straightness smooth Toleransi untuk kelurusan acian
finish maximum 2 mm/ m. maksimum 2 mm/ m.

Page 25 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
The next process is the painting. Proses berikutnya adalah pengecatan.
Painting can be performed 7 x 24 hours Pengecatan dapat dilakukan setelah
after smooth finish process completed. 7x24 jam setelah proses acian selesai.
With notes room temperature and Dengan catatan suhu ruangan dan
normal weather conditions. kondisi cuaca normal.

5. Details of specific cases on block wall 5. Detail kasus khusus pada konstruksi
construction dinding bata ringan
If there is a meeting between the Jika terjadi pertemuan antara struktur
columns/ walls concrete structure with beton kolom/ dinding dengan bata
block wall, then it will be do like the ringan, maka akan dilakukan seperti
image detail below: gambar detail di bawah ini:
a. The meeting in the middle of the a. Pertemuan di daerah tengah
concrete structure. struktur beton.

Page 26 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
b. The meeting on the outskirts of the b. Pertemuan di daerah pinggir
concrete structure. struktur beton.

c. The meeting on the outskirts of the c. Pertemuan di daerah pinggir


concrete structure that is not struktur beton yang tidak sejajar
aligned with the concrete structure dengan struktur beton (detail ini
(this detail only to be used on hanya dapat digunakan atas arahan
Client/ Owner direction). Klien/ Owner).

Page 27 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
For the area covering ceiling, then the Untuk daerah yang terdapat plafond,
limit of plastering and finish coat will maka batas plesteran dan acian akan
be made like the image detail below. dilakukan seperti gambar detail
dibawah ini.

Page 28 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
If in the area of block walls there is a Jika di daerah dinding bata ringan
MEP penetration work such as opening terdapat penetrasi pekerjaan MEP
and coring, it will be made like the seperti opening dan coring, maka akan
image detail below: dilakukan seperti gambar detail
dibawah ini:
a. MEP opening a. Opening MEP

Page 29 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.

b. MEP coring b. Coring MEP

If in the area of block walls there are a Jika di daerah dinding bata ringan
repair work as a result of MEP terdapat pekerjaan perbaikan akibat
penetration work, it will be made like dari penetrasi pekerjaan MEP, maka
the image detail below. akan dilakukan seperti gambar detail
dibawah ini.

Page 30 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
6.0 SAFETY KESELAMATAN

See Risk Assessment (attached) Lihat Risk Assesment (terlampir)

7.0 RESPONSIBILITY TANGGUNG JAWAB

SM Hotel (Erik. H) SM Hotel (Eric. H)


SM Residence (Iwan. C) SM Residence (Iwan. C)
Responsible for ensuring that all work Bertanggung jawab dalam menjamin semua
methods can be implemented at site. metode pekerjaan dapat dilaksanakan di
lapangan.
SE Hotel (Iwan. W) SE Hotel (Iwan. W)
SE Residence (Frans. T) SE Residence (Frans. T)
Responsible for preparing the required sketch Bertanggung jawab untuk menyiapkan sketch
drawings as well as record and report to the drawing yang dibutuhkan serta menyimpan
owner about all problems and conflicts that dan melaporkan kepada owner mengenai
happen on site. semua permasalahan dan konflik yang terjadi
di lapangan.
CHIEF SPV Hotel (Erik. H) CHIEF SPV Hotel (Erik. H)
CHIEF SPV Residence (Adi. I) CHIEF SPV Residence (Adi. I)
Responsible for the implementation of the Bertanggung jawab terhadap pelaksanaan
related work on site, so the jobs can run well pekerjaan yang terkait di lapangan, sehingga
and keep safety during the work. pekerjaan dapat berjalan dengan baik dan
menjaga keselamatan selama pekerjaan.
CHIEF SURVEYOR (Cahyadi) CHIEF SURVEYOR (Cahyadi)
Responsible for checking and recording the Bertanggung jawab terhadap pengecekan dan
related works on site accordance with the shop pencatatan pekerjaan yang terkait di lapangan
drawing. sesuai dengan shop drawing.
QA/QC Manager (M. Firdaus) QA/QC Manager (M. Firdaus)
Responsible for checking and make sure that Bertanggung jawab terhadap pengecekan dan
pouring concrete work is according to the shop memastikan bahwa pekerjaan sesuai dengan
drawing approved by BBSI-KMP JV and shop drawing yang disetujui oleh BBSI-
Owner. JKMP JV dan Owner.

Page 31 of 32
Doc. No: BBJK-ARC-METH-0001

Date : 20 October 2014 Revision : 2

PONDOK INDAH HOTEL & RESIDENCE JAKARTA PROJECT

BLOCK WALL INSTALLATION, PLASTERING & SMOOTH FINISH

ITEM ENGLISH BAHASA INDONESIA


No.
8.0 APPROVAL PERSETUJUAN

1. Shop Drawing approved 1. Shop Drawing disetujui


2. Permit to work (PTW) approved 2. Permit To Work (PTW) disetujui
3. WMS and all materials approved 3. WMS dan semua material disetujui
4. All materials prepared and site preparation 4. Semua material dipersiapkan dan
completed persiapan lokasi telah diselesaikan

9.0 DOCUMENTATION DOKUMENTASI

Installation record Catatan pemasangan

10.0 APPENDIX LAMPIRAN

1. Safety Risk Assessment 1. Safety Risk Assessment


2. Form Inspection Test Procedure 2. Form Prosedur Uji Inspeksi
3. Form Request for Inspection 3. Form Permintaan untuk Inspeksi

Page 32 of 32
E
ll
Ec
o
o
o
do
E
o g,
rts c{ ht
: N (I ll
E
(EE-Yb\ orc \" .p
ESAFA C([
oo \i -
E :H_u E #E o 'i= 14
i
8.E \:.N
88.cc
o
oI
[- ; E,; E
FE t E E'6 :N a\.
; JD
(D
I\ - oO
F 6Gt
.iE
fiE E EB:g
(=)
o UJ oo
EE E sus"
a
E, = =
o- ct) oa
$=*E E E gE
.*., t o
G
o -ok
*
6 \<
o -') = E HET f
ggggeggEEgerg$s
I
dt o o o FP
il 6
;E E5e
ll
C
o EE*
te d (,
E z.
o G
(D
c
o
E
GEV(tr
(a O CD(E O
E
gt
E
ut
o,
G
O.CEEO
EEgEEgg;EE[sistss E [$ g E
crt
o o
.D U,
oo,
o
o
gt E
o
-c ==
-g
o -9 o,
E I I
66
ec
-Q) sP
= uta
v G,
.9 o
G, o
o ; (o sf
tr
(Y) $
.E H o
EP t rE ,E
6
!,
c
o EHE EEE s EEes
o Y o= 9
(L -s=ts
!to
f
o
I .9 -0 E frHeH
g EE-E,g
o
o
(E
ttt

E,
!t
6 lll
PE gs
=
I*
!, .s
-
a!
aggeg$,sssFss E$EE$E
U'
E
o.
(D
U'
E 6 L...1
cCD
v c
=
o
(lE
_sr =
t
t,co
o 6 IU !t
F
6 .: (lol
o
o E
tt
tr
(D
E
ID
E o
(o
z(o z6E
o-
xb.p Eg.L z.
co >r >
EE -cr
!,
o
.cI
!,
o
cr
-9
=
o I
trb
6E
E
=:
3 TE
c=
o
o.
o,
ct
o-
v=,
@

d,
o
EH Ea, o.6
Eh B6 *F
L-P TL
CL E.
(J
si iiE
g c c
fl8*fES
.v,
(s o o o
"g t
aD
dt OD
E
tt E
ot
E
ut
t,
iH E
o (,
G
6 .E (\t
oo,
d,

o,
rl,
o,
g,
ID
o
o,
a,
6
o C' E
o o
F
o v1r, vo
ffi
..9
o
CL
J
o o o &. E,
a,
E
E
tltC
o
so
o
E
o
:
iE at,
J ll
E E Es
* P;S
E.
E

-i(E
o- --
b9
\D
t
_g)
I
E p E; E
E,;
Eg N\
o
o E E st
E P gS B .c =:i
6g
-rE -!_
s \e
s9=
I (u
g
CD-t- t'
o F
ut o +E 9qd
: j-d
(f6
o
!td
I
C)
E
(L =I
cr)
5
0 -+*t
I
G 6
HE# fr
tgEaE:E*$
\<
-.:,
@ * o
\< - E Eo
o E
6
E m
t
- o
E
* *i#+' g$ g-e*E
q'
o hq -c
U T* B
= a-c o
o
(, odEg
o 6 a=
-o
f
E
o
zo c.
c o
o E
F 9EH E S HEEE$ Ero c 9d
E E 3E s
E E o)
o t,
E BEET
$; FEr $c pE E$ sFs
@ 6
o @
tn U'
EEEE6
o
o
o :El
o dD
J3
o,
va, oo
o E =o llrat tltt
EC
(r, t>
uta
J u
p o
E, o o
o
E
.E
(U
6E
o
{J

!lo
!E
C
to
E E $esSt EE
cED
E
o
E

6
o
6
6o
-yo
o-Y
O-y
s.E
EO
o g
o 5
(U
o Ec
oo c
I 6
E o FL
Ecl o
-g .c . qO
L
E
o
6
t,
E
G
c]{
gEsEuEgsE$*$$ J
(U
'i= -=.Y
.!a
==0, ol E =
.!e
c{,
.E
E o PP5 EE lI ag
E G F o<o- o-
J c
=
1". ''
P6
sr12
o o
l: gft
!, oo
c t\
o 6-o
o
E IoH
CF
o- ts6
72.
=.
6
dt
,.8 F.a
0
E EE
,Tfi -=
o
(, rL.\
* AE
(l' C'
,'tg .Y =o otr cc
(t)o
iH k
o,
qt
c
-9

6
ot
-c
E5 EE EE
g,
.,)g}
oo
o,
aD
aD
6 -9 U' A'
L (5 E
o. (, o .-
(D .Y
ffi li o s = -at,
E.G -o,
e E3 g
.qE
aqe EE
o.-
oo )*
il*s :
fcc
CDCL ao \t^
IE v
b \" -Nt
\s\
E EE
IL eGo
o
o
lo ,E
.E \\ rf,
tI
O
lo
lo-
o
B \il
\).
ll
E
F o lo ID o, -=
UJ l(U l(E E
; $gH; E,Ei*tuF I
5 I(E
l'i= *i E o,
=I 0 t.- l0,
l-v
co
ct,
E
E, o lE
L lo =
o o ILl0r
so
iA EI; a s
i f r$
\2 -
") o IG
00 o E s lo
o !,(E
m a -g EFE$ a-t
uri
c
o to E oE L
(E a_t
{J (J
(U o lt pl
C o E ED
o
E
E
6 s"EE$ ro g
$ t- o
o
{
sl
GI
a o Io
o E
!U
U,
;cggE;$t$t stol
I
J
o Ito E EE E g BE a6 =
o
o
o
laltt
J
.9
G,
o
o\
co, a* =E SE h
o
EE E
c4
E
=
E
E
a
() $Ei .BE
x(,o s
{J
o
I E o
()
EEE.:g Bs sE
tt,
s -o
o to
t,
g
v
to SE
hq- t-*''$st*ss- U,E
P5
o,
o s,
gfi -sr
!, :-
E 6'o
o J
o- EE
B-e
==
-EEgE= -sg*
EE
au xut
E AE c!
EE
oo)
EggEEEE sEEf EE
ao,
It at
oo
o6
U'6
--
tt -- -g
o
o
E =o
o,
EE
lt
tO
o
o
0
uo
E
o g,
-
\,
L
\ \1 \
o
{-,
$
\,)
r\)
\
c>
o)
! \]
t\ F- o
o - a,

o lU =
I
G C')I a
(f
L = o
L
(D
\2 E o
.?
tte
o
@ \z
- .+-
a
- o
m
E Ct] It
E
o
aa o (,
c
o
z.
c
E
{, o
E
E E o
o
o
t,
att
@
(lt
a
o at
U' E
o id id
o
o .!
a
-c
(D
3=
66
EC
E cD o)
= aa
J E
p o
E, o 3r,
oo
to
E
P Eo
g
o E
o .-0
I e
-g
.G 6 !t
o o E hl
!, .g
-
G ot
E
(D
E .E
)....
at,
CD
E o=
J c
=
o
tU C) =
t,
o o
6
(U
F ut E'
!tg o
(D
o
^-
o -:i.
@ ;
o os E E
(E
rD
E
o- z
a5
z. GI
6
o S *"0 >r
-ct o> =
E' l!
6
o E ET E
o
as
o
c,
o
E'
,-oo
Ifl
't9N
:E'
t
(D
(L
c
cr-
CL
E

o
.G
E
o
(,
-v
tn o o
Eil
:-
k
e
o
6
G

(E
c)
sssss E
tt
ot
o,
vt

E
aD
1r,
(D
at

E
.D
o
e)
aD
o U' (D o,
E 6 E .-
ffi @
CL
o
o
o J
o --
o
E t-9,
.Y
_o,
E.
Bahasa
ITP untuk Pemasangan Dinding
Celcon wall dan acian
Client : PT. Pondok Indah Hotel Project : Pondok Indah Hotel and Residence, Jakarta, Indonesia Prepared by: : QA / QC Manager
ITP Doc No. : BBJK-QAC-PRC-0026 Date : 27-May-15
Quality Control Category - Key Acceptance Criteria : Approved by :
E : (Execute the work) I : (Inspection) R : (Review) H : (Hold) W : (Witness) V: Verify Code 1 : Accepted
Code 2 : Accepted with coment
Extent of Inspection : Date :

V : (Visual, random field measurement) T : (Laboratory Test/Test Point/Sampling Point) C : (Report/ Document review/Certification Point)

Inspection Actifity Verification


Quality Control Category
Extent Of
No. : Quality Control Activity Responsible Person Frequency Check Document/Record/Check
Inspection Sub Cont BBSI - JKMP PIH
Code and Standard, Specification Acceptance Criteria List
1 Documentation
Izin Bekerja (diperlukan izin untuk memulai pekerjaan markingan, Sebelum pelaksanaan Dokumen izin bekerja
1.1 QC, SE,SO Approved documentation Kode 1 Atau Kode 2 C E R,H R,V
pekerjaan instalasi celcon, pekerjaan plesteran dan pekerjaan acian) pekerjaan diterima

Sebelum pelaksanaan dokumen risk assesment


1.2 Risk Assesment SE, QC, MN, SO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C E R,H R,V
pekerjaan diterima

Detail gambar (telah menerima dan mengecek gambar untuk Sebelum pelaksanaan
1.3 QC, SE, MN Spesifikasi Proyek Kode 1 Atau Kode 2 C E R,H R,V Dokumen gambar diterima
finishing dengan code 1 atau code 2) pekerjaan

Sebelum pelaksanaan
1.4 WMS Pemasangan Celcon QC, SE, MN Spesifikasi Proyek Kode 1 Atau Kode 2 C E R,H R,V dokumen WMS diterima
pekerjaan

2 Materials disetujui

semen instan ( perekat antar celcon, perekat celcon dengan lantai, Sebelum, selama pelaksanaan
2.1 SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
perekat celcon dengan dinding atau kolom struktur. Plesteran dan acian) pekerjaan

Sebelum, selama pelaksanaan


2.2 Beton Instan SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.3 Bata Ringan SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.4 Kolom dan balok lintel SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.5 SE, MN,QC, PO
Perekat Besi dowel (balok dan kolom lintel & lantai, kolom dan dinding struktur) Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.6 Besi hollow (Profilan) SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.7 Benang SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.8 Expanda SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.9 Corner Bead SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.10 Rock Wall SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.11 tulangan dowel SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.12 Baja Siku SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan
Sebelum, selama pelaksanaan
2.13 Backing Rod SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

Sebelum, selama pelaksanaan


2.14 sealant SE, MN,QC, PO Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H R, V Dokumen material diterima
pekerjaan

3 Inspeksi

Inspeksi Markingan (letak dan dimensi dinding, Kolom Prakis, letak dan Selama dan setelah Request for Inspection
3.1 SE, MN, QC Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H I, R, H
dimensi opening) pelaksanaan pekerjaan diterima

Inspeksi Instalasi Celcon (vertikaliti, kebersihan, tertutupnya siar, Selama dan setelah Request for Inspection
3.2 SE, MN, QC Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H I, R, H
ada tidaknya cast in item, dimensi dan letak opening) pelaksanaan pekerjaan diterima

Selama dan setelah Request for Inspection


3.3 Inspeksi Instalasi Plesteran (Kerataan) SE, MN, QC Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H I, R, H
pelaksanaan pekerjaan diterima
Selama dan setelah Request for Inspection
3.4 Inspeksi Instalasi Acian (Sudutan dan kerataan) SE, MN, QC Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H I, R, H
pelaksanaan pekerjaan diterima
Selama dan setelah Request for Inspection
3.5 Serah terima hasil keseluruhan pekerjaan SE, MN, QC Spesifikasi Proyek, WMS Kode 1 Atau Kode 2 C, V E I, R, H I, R,V
pelaksanaan pekerjaan diterima

Quality Control Responsibilty :

QC : Quality Control Engineer, SIE : Superintendent Engineer, SE : Site Engineer, MN: Relevant Manager, LT : Laboratory Technician, SO : Safety Officer, PO : Purchase Officer
Inspection:
Block Wall
Project: Pondok Indah Hotel & Residence Consultant: PT. Metropolitan Kentjana, Tbk

Client: PT. Pondok Indah Hotel Contractor: BBSI-JKMP JV

Ruang : Ref Gambar :


Bagian dari : Tanggal :
Deskripsi : No. INSR :

Persyaratan
Khusus

Spec. clause:
Inspeksi pekerjaan Block Wall Guideline:

No. Jenis Inspeksi Contractor Sub-Contractor PIH Remarks

1 Material, Methode Kerja, shopdrawing

approved
2 Kondisi Material

3 Mengecek Lokasi dan Markingan


(Surveyor)
4 Expanda terinstal
5 Dowel Terinstal
6 Opening (pintu, jendela, dll)
7 Balok dan kolom lintel

8 Pemasangan Pipa
(Mechanical)
9 Other:

Note :

Contractor: Sub-Contractor: Consultant:

Signature: Signature: Signature:

Name: Name: Name:

Date: Date: Date:


BBJK-QAC-FORM-0006
Inspection:
Plester & Aci
Project: Pondok Indah Hotel & Residence Consultant: PT. Metropolitan Kentjana, Tbk

Client: PT. Pondok Indah Hotel Contractor: BBSI-JKMP JV

Ruang : Ref Gambar :


Bagian dari : Tanggal :
Deskripsi : No. INSR :

Persyaratan
Khusus

Spec. clause:
Inspeksi pekerjaan Plester & Aci Guideline:

No. Jenis Inspeksi Contractor Sub-Contractor PIH Remarks

1 Material, Methode Kerja, shopdrawing

approved
2 Kondisi Material
3 Mengecek Kepalaan
4 Cek sudutan (90 derajat)
5 Cek permukaan acian
6 Other:

Note :

Contractor: Sub-Contractor: Consultant:

Signature: Signature: Signature:

Name: Name: Name:

Date: Date: Date:


BBJK-QAC-FORM-0006