Main Contractor : Project :

Consulting Engineer :
Contract No :

APPROVAL CHIT Chit No :

(LABORATORY)

PART A : (To be filled by contractor)

From PROJECT MANAGER

To RESIDENT ENGINEER

We request for inspection and and permission to proceed for following work ;

Submitted By :- Signature : Checked By :- Signature :


Name : Name :
Position : Position :

PART B : (To be filled by consulting Engineer/Engineer's Staff)

Recieved By :- Signature : Time : Date :


Name :

Comments :-

Survey & Setting Out : Inspection of Prior Work : Testing of Prior Work :

Signature: Signature: Signature:


(Survey Tecnician) (Inspector of Work) (Laboratory Technician)

PART C : (To be filled by Engineer/Quality Assurance Engineer)

From :- RESIDENT ENGINEER

To :-

IS APPROVED
Your request to proceed with the above mentioned work ( tick item applicable) : IS NOT APPROVED

Remarks :

Received to Contractor ; Signature:


(Resident Engineer)

Signature: Time :
Date :
Time : Date :