Professional Documents
Culture Documents
by date
Equipment, materials and x x x 3 3 9 No tools, equipment or materials place near working platform 3 1 3
tools falling from height, if not secured, ensure that they are all positioned in a safe a
Working at secure manner. Use of appropriate lifting mechanisms for
height materials.
Working near overhead x x 3 2 6 3 1 3
services
Falls, trips and slips form x x 5 5 25 Fall prevention fencing, PPE, and supervision. 3 1 3
height
x x x 5 5 25 3 2 6
x x 5 3 15 3 1 3
x 5 2 10 2 1 2
S – Severity multiplied by L – Likelihood = R – Risk Rating - (high, medium or low – see guidance note SE-GN-61 for details)
4 4 8 12 16 20
5 5 10 15 20 25