Professional Documents
Culture Documents
Variant 10
Wellington Brisbane Jakarta Male Colombo Port Bangui Copenhagen
UTC+1 UTC+1 UTC+2 UTC+6 UTC+6 Louis UTC+1 UTC+1
UTC+4
Departure 02.25 13.52 19.47LT 12.21LT 15.09 23.09LT 17.53
time (date) UTC(1.11) UTC(6.11) (12.11) (21.11) UTC(26.11) (7.12) UTC(11.12)
03.25 14.52 17.47 06.21 21.09 19.09 18.53
LT(1.11) (6.11) LT UTC UTC LT(26.11) UTC LT(8.12)
(12.11) (21.11) (7.12)
The kind of Rail Air Air Air Sea Air Air
transport В- В- А-320 В-757 А-310
737 757
Speed of 70 710 820 740 40 810 825
transport,
km/h
Time of 5h. 1h. 7h. 2h. 97h. 6h. 6h.
transportation 42m 50m 49m 58m 30m 14m 55m
Distance 525 1299 6396 2190,4 3900 5046,3 5700,75
between
points, km
Arrival time 9.07 LT 15.42 01.36 9.19 UTC 16.39 01.23 11.58LT
(date) (1.11) UTC UTC (21.11) UTC UTC(8.12) (11.12)
8.07 UTC (6.11) (13.11) 15.19 LT (30.11) 2.23 10.58 UTC
1.11 17.42 07.36 (21.11) 20.39 LT(8.12) (11.12)
LT LT LT
(6.11) (13.11) (30.11)
Stopover time 5 days 5h. 6 days 8 days 5 days 5 h. 8 days 3 days 16
45 m 2h.05m 4h. 45 50 min 2h.30m h.30m
m
Task: calculate all details of passenger’s trip (departure and arrival time, stopovers, the distances between points, the total time of trip)