SPP&ID Training - 20 P&ID Lab PDF
SPP&ID Training - 20 P&ID Lab PDF
com
TABLE ON CONTENTS
Creating a Drawing
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Open Drawing Manager and Right Mouse Click on Unit 010 and select ‘New Drawing’
Placing Equipments
Right Mouse Click on Drawing PR-PID-0016 and select ‘Open Drawing.
Symbols----Equipments----vessels---Tanks---Tank-Open Top 03
2 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
3
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols---equipments----vessels----Tanks---Flotation Cell-Rougher(2)
4 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols---Equipment---Mechanical----Agitator-----Agitator-Flotation Cell
5
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
6 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
7
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
8 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols----Equipment-----Mechanical----Material handling-----Cranes----Crane-Bridge
9
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
10The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
11
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
12The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols-----Equipment-----Nozzles------Nozzle-internal
13
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Pipelines Routing
Symbols------Equipment------Piping------Routing-------Primary piping
14The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
15
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
16The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
17
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols------Equipment------Piping------Routing-------Secondary piping
18The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
20The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols------Equipment------Piping------Routing-------Secondary piping
21
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
22The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
23
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
24The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
25
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
26The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols------Equipment------Piping-----Piping OPC’s------Off-Drawing
27
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
28The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Select and enter the following properties for the Open Tank.
Tag Sequence Number: Will be generated once we enter the Tag Prefix
Select the Flotation Cell as shown and key-in the following properties:
30The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Name the rest of the cells as BULK ROUGHER FLOTATION CELL 2, 3 AND 4
31
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Name the other three as BULK ROUGHER FLOTATION CELL MECHANISM 2, 3 AND 4.
Tag Sequence Number: CN-001 ( By keying in the desired Tag Sequence number before the Tag
Prefix we can prevent the system from generating the sequence number)
32The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Pick the label from the Catalog explorer and move the mouse on the target equipment, label gets
snapped on to the equipment as shown below.
33
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Left mouse click now, places the label as shown below. But still we will be in the placement
mode.
Moving the cursor to the desired location and left click will place it as shown below.
Place the Equipment Number label for the Flotation Cells and the launder as shown below.
34The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Place the Name-Number label on Bulk Rougher feed Box, Flotation Cells, Flotation
Mechanisms, Launder and Crane as shown below.
35
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
36The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Resize the Dart Control Valve as shown below by holding the yellow handle and pulling it down.
37
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
38The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Measured Variable: H
Place 4 DCS Main Panels and key in the Measured Variable and Instrument Type Modifier
attributes as shown below.
39
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Key in the Measured Variable and Instrument Type Modifier attributes as shown below by
selecting the instruments one after the other.
40The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Now select the remaining two as shown below by holding the Ctrl key down or by fence method.
Notice that the Properties window will be showing the Select Set indicating that you have
selected more than one item. And the properties common to selected items are made available.
You can see the items that are part of the selected items through the pull down list as shown
below.
41
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Key in the Measured Variable and Instrument Type Modifier attributes as shown below and
notice that the same gets updated in the design window.
42The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
43
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Also key in the properties as shown below using the Select set Feature.
44The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
45
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
46The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols\Equipment\Nozzles\Instrument Connector
Place the Instrument Connector on the Gear Boxes and the Motors as shown below.
47
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
48The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols\Instrumentation\Signal Lines\Electric
49
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
50The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols\Instrumentation\Signal Lines\Pneumatic
51
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
52The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Symbols\Instrumentation\Off-Line\Radar Level
53
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
54The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
55
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Now select the label and key in the properties as shown below.
56The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
57
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Select the Pipe Run as shown below and notice the Flow direction property. It will be inlet.
59
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Reverse it to Inlet and continue placing the Flow Direction symbol as shown.
Now select the Fluid Code property and notice that, all the connected lines are selected and will
receive the value.
61
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Now select the pipe run again and select the Fluid Code property, notice that only the pipe run
below the End of Group symbol is ready to receive the value.
62The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
As this is a driving label, we can key in the property by selecting the label or by selecting the
Pipe Run.
Continue to place the Line Number Ins label and key in the values as shown below.
63
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
64The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Select the label as shown below and click on the ellipsis in the Description field.
Type ‘TO GRADE’ as Description and observe the same in the Design window.
65
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Gapping:
Zoom in to the drawing area as shown and select Tools---Gap Now.
66The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Notice that there has been a gap in the vertical Runs wherever they graphically intersect the
horizontal Runs.
Gapping style and the priority with respect to the horizontal and vertical Runs can be set as per
requirement.
Alternatively we can keep the Auto Gap option selected. This setting will place a Gap whenever
the lines intersect graphically.
67
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Notice the same getting updated on the OPN in the design window.
68The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
69
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
70The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Click on Create button and enter the Drawing number for the next drawing as shown.
Click OK to create.
Now the Drawings under Unit 010 will be listed like this.
71
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Zoom in as shown below and note down the OPC numbers which are In –Coming and on the left
side of the drawing.
72The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
73
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
74The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
You will see all the OPC’s which have been placed on PR-PID-0016 drawing.
Notice that the Partner OPC drawing column is empty indicating that the Partner OPC’s are not
placed in any of the drawings and are in the Stockpile.
Now Toggle-off the other drawings and Toggle on the Stockpile with the item type set to OPC as
before.
You will get the list of OPCs which are residing in the stockpile.
75
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Notice that, the Drawing Number column is empty indicating again that they are yet to be placed
in the drawing. But you can see the partner OPC drawing number.
Now pick the first OPC and place it in the drawing as shown.
76The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
OPC Tag will be same as its partner OPC. Also you will see the partner OPC’s drawing number
displayed on the OPC.
This will open the drawing where in you will find the partner of this OPC.
77
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
78The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
Note: You will not be prompted to choose the direction while placing the OPCs from stockpile.
It gets aligned to its partner who is already in the other drawing.
Open the drawing PR-PID-0017 and place the remaining OPCs from the Stockpile.
79
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
80The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
\Piping\Piping OPC's\Off-Drawing.sym
\Design\Graphics\Block
81
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab
82The inf