CREATING A DRAWING ............................................................................................. 1


PLACING EQUIPMENTS .................................................................................................. 2
Placing Equipment Nozzles ................................................................................................... 11
Rotate the internal Nozzle ...................................................................................................... 14
PIPELINES ROUTING .................................................................................................... 14
Placing Piping Components ................................................................................................... 19
Placing the OPCs ................................................................................................................... 26
ENTERING THE EQUIPMENT PROPERTIES AND GENERATING THE ITEM TAG ............................... 29
Placing the Equipment Labels: .............................................................................................. 33
Placing the Instruments .......................................................................................................... 36
COPYING THE GROUP OF INSTRUMENTS: .......................................................................... 45
ROUTING SIGNAL LINES ............................................................................................... 48
LABELING THE INSTRUMENTS: ....................................................................................... 55
Placing Piping labels: ............................................................................................................. 58
GAPPING: ................................................................................................................. 66
ADDING DESCRIPTIONS TO OPCS: .................................................................................. 67
Placing the partner OPC’s from the Plant Stockpile: ............................................................. 70

Creating a Drawing
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Open Drawing Manager and Right Mouse Click on Unit 010 and select ‘New Drawing’

Fill in the details as shown and select OK to create the drawing.

Placing Equipments
Right Mouse Click on Drawing PR-PID-0016 and select ‘Open Drawing.

Symbols----Equipments----vessels---Tanks---Tank-Open Top 03

2 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

3
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols---equipments----vessels----Tanks---Flotation Cell-Rougher(2)

4 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols---Equipment---Mechanical----Agitator-----Agitator-Flotation Cell

5
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols---Equipment----Mechanical-----Other Mechanical Equipments----Air Intake Louvre

6 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols----Equipment----Mechanical---Other Mechanical equipments---Drivers----Electric


Motor 02

7
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols----Equipment----Mechanical----Other Mechanical Equipments---Chutes----Launder-


Distributor

8 The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols----Equipment-----Mechanical----Material handling-----Cranes----Crane-Bridge
9
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols----Equipment-----Mechanical----Material handling-----Cranes----Crane – Trolley

Symbols----Equipment----Mechanical---Other Mechanical equipments---Drivers----Electric


Motor

10The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Placing Equipment Nozzles


Symbols-----Equipment-----Nozzles------Flanged Nozzle

11
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

12The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols-----Equipment-----Nozzles------Nozzle-internal

13
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Rotate the internal Nozzle

Pipelines Routing
Symbols------Equipment------Piping------Routing-------Primary piping

14The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

15
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

16The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

17
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols------Equipment------Piping------Routing-------Secondary piping

18The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Placing Piping Components


19
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols------Equipment------Piping-----Valves-----Two Way More-----Knife gate Valve

Symbols------Equipment------Piping-----Valves-----Two Way Common------Gate Valve

20The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols------Equipment------Piping-----Fittings-----End Components----Hose Connection

Symbols------Equipment------Piping------Routing-------Secondary piping

21
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols------Equipment------Piping-----Valves-----Two Way More-----Knife gate Valve

Symbols------Equipment------Piping-----Fittings-----End Components----End of Line Terminator

22The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

23
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols------Equipment------Piping-----Valves-----Two Way Common------Ball Valve

24The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

25
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Placing the OPCs

26The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols------Equipment------Piping-----Piping OPC’s------Off-Drawing

27
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

28The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Entering the Equipment Properties and Generating the Item Tag


29
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select and enter the following properties for the Open Tank.

Tag Prefix: 510-TK

Name: BULK ROUGHER FEED BOX

Supply By: By Contractor

Tag Sequence Number: Will be generated once we enter the Tag Prefix

Item Tag: (Tag Prefix)-(Tag sequence Number)-(Tag Suffix)

Select the Flotation Cell as shown and key-in the following properties:

30The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Tag Prefix: 510-FC

Name: BULK ROUGHER FLOTATION CELLS 1

Supply By: By Contractor

Name the rest of the cells as BULK ROUGHER FLOTATION CELL 2, 3 AND 4

Select the Agitator and key-in the following properties:

Tag Prefix: 510-AG

Name: BULK ROUGHER FLOTATION CELL MECHANISM 1

31
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Supply By: By Contractor

Name the other three as BULK ROUGHER FLOTATION CELL MECHANISM 2, 3 AND 4.

Select the Launder and key-in the following properties:

Tag Prefix: 510-LA

Name: BULK ROUGHER FROTH COLLECTION LAUNDER

Supply By: By Contractor

Select the Launder and key-in the following properties:

Tag Sequence Number: CN-001 ( By keying in the desired Tag Sequence number before the Tag
Prefix we can prevent the system from generating the sequence number)

Tag Prefix: 734

Name: BULK FLOTATION/REGRIND SERVICE CRANE

Supply By: By Contractor

32The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Placing the Equipment Labels:


Symbols\Equipment\ Labels - Equipment\Equipment Number.sym

Pick the label from the Catalog explorer and move the mouse on the target equipment, label gets
snapped on to the equipment as shown below.

33
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Left mouse click now, places the label as shown below. But still we will be in the placement
mode.

Moving the cursor to the desired location and left click will place it as shown below.

Place the Equipment Number label for the Flotation Cells and the launder as shown below.

34The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

\Equipment\ Labels - Equipment\Descriptions\ Name-Number.sym

Place the Name-Number label on Bulk Rougher feed Box, Flotation Cells, Flotation
Mechanisms, Launder and Crane as shown below.

35
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Your drawing would look like this now.

Placing the Instruments:

36The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Zoom in to Bulk Rougher Flotation Cell 1 as shown below.

Symbols\Instrumentation\Off-Line\Dart Control Valve w Actuator

Place the Dart Control Valves as shown below.

Resize the Dart Control Valve as shown below by holding the yellow handle and pulling it down.

37
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Place Dart Control Valve on the remaining Flotation cells as well.

Symbols\Instrumentation\Off-Line\With Out implied Components\Single Function\ Discrete


single-funct Field Mounted

38The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Key in the following attributes.

Measured Variable: H

Instrument Type Modifier: S

Tag Sequence Number: 001

Notice that the Item Tag will become HS-001

Signal Point 1 Description: LOR

Signal Point 1 Description: START

Signal Point 1 Description: STOP

Symbols\Instrumentation\System functions\DCS Main panel

Place 4 DCS Main Panels and key in the Measured Variable and Instrument Type Modifier
attributes as shown below.

39
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols\Instrumentation\Off-Line\With Out implied Components\Single Function\ Discrete


single-funct Field Mounted

Key in the Measured Variable and Instrument Type Modifier attributes as shown below by
selecting the instruments one after the other.

40The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Now select the remaining two as shown below by holding the Ctrl key down or by fence method.

Notice that the Properties window will be showing the Select Set indicating that you have
selected more than one item. And the properties common to selected items are made available.

You can see the items that are part of the selected items through the pull down list as shown
below.

41
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Key in the Measured Variable and Instrument Type Modifier attributes as shown below and
notice that the same gets updated in the design window.

Symbols\Instrumentation\Off-Line\With Out implied Components\Single Function\ Discrete


single-funct Access in Prime Location

42The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Key in the properties as shown below.

Symbols\Instrumentation\Off-Line\With Out implied Components\Single Function\ Discrete


single-funct Access in Aux Loc

43
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols\Instrumentation\Off-Line\With Out implied Components\Single Function\SIS-Field


Display

Also key in the properties as shown below using the Select set Feature.

Your Drawing would look like this now.

44The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Copying the group of instruments:


Select the instruments by making a fence as shown below.

Select Edit-Copy and then Edit-Paste.

Now select Move/Copy

45
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select the From and To points following the prompts.

Drawing would look like this now.

46The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols\Equipment\Nozzles\Instrument Connector

Place the Instrument Connector on the Gear Boxes and the Motors as shown below.

47
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Routing Signal Lines


Symbols\Instrumentation\Signal Lines\Connect to Process

48The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols\Instrumentation\Signal Lines\Electric

49
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

50The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols\Instrumentation\Signal Lines\Pneumatic

51
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select the Pneumatic Run and move as shown below.

52The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Symbols\Instrumentation\Signal Lines\Unguided Electromagnetic

Symbols\Instrumentation\Off-Line\Radar Level

53
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Resize the Radar Level as shown below.

Your Drawing would look like this now.

54The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Labeling the Instruments:


Symbols\Instrumentation\ Labels\ Tag Number with Balloon.sym

55
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Now select the label and key in the properties as shown below.

\Instrumentation\ Labels\Instrument - Signal Descriptions.sym

56The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select the Label and key in the Description as shown below.

Place the label, Instrument - Signal Descriptions.sym on the following as well.

57
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Placing Piping labels:


\Piping\ Labels - Piping Segments\Flow Direction.sym

Place the Flow Direction symbol as shown below.


58The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select the Pipe Run as shown below and notice the Flow direction property. It will be inlet.

Change it to Outlet as shown.

59
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Notice that the direction of the Arrow is changed.

Reverse it to Inlet and continue placing the Flow Direction symbol as shown.

\Piping\Segment Breaks\End of Group.sym


60The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select the Pipe Run as shown below.

Now select the Fluid Code property and notice that, all the connected lines are selected and will
receive the value.

Place the End of Group symbol as shown below.

61
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Now select the pipe run again and select the Fluid Code property, notice that only the pipe run
below the End of Group symbol is ready to receive the value.

Place the End of Group symbol in the locations shown below.

\Piping\ Labels - Piping Segments\Line Number Ins.sym

Place the Line Number Symbol as shown below.

62The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

As this is a driving label, we can key in the property by selecting the label or by selecting the
Pipe Run.

Continue to place the Line Number Ins label and key in the values as shown below.

63
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

\Design\Gaps & Terminators\End Arrow Pipe.sym

Delete the End of Line Terminator symbols as shown below.

Place the End Arrow Pipe symbol as shown below.

64The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select the label as shown below and click on the ellipsis in the Description field.

Type ‘TO GRADE’ as Description and observe the same in the Design window.

65
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Your Drawing would look like this now.

Gapping:
Zoom in to the drawing area as shown and select Tools---Gap Now.

66The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Notice that there has been a gap in the vertical Runs wherever they graphically intersect the
horizontal Runs.

Gapping style and the priority with respect to the horizontal and vertical Runs can be set as per
requirement.

Alternatively we can keep the Auto Gap option selected. This setting will place a Gap whenever
the lines intersect graphically.

Adding Descriptions to OPCs:


Select the OPC shown below.

67
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Key in the Description and the To/From information as shown below.

Description: BULK ROUGHER SUMP PUMP

To/From: SUMP-2 510-PU-102

Notice the same getting updated on the OPN in the design window.

Continue to update the OPcs as shown.

68The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

69
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Placing the partner OPC’s from the Plant Stockpile:


Open the Drawing Manager and create two new Drawings as shown.

70The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Click on Create button and enter the Drawing number for the next drawing as shown.

Click OK to create.

Now the Drawings under Unit 010 will be listed like this.

71
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Right Click on PR-PID-0016 and open the drawing.

Zoom in as shown below and note down the OPC numbers which are In –Coming and on the left
side of the drawing.

Close the Drawing.

72The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Open the Drawing PR-PID-0015.

Select PR-PID-0015 and click OK to open.

P&ID looks as shown below.

73
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Look in to the Engineering Data Editor.

Set the Item type as OPC.

Toggle-on the Other Drawing.

74The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

You will see all the OPC’s which have been placed on PR-PID-0016 drawing.

Notice that the Partner OPC drawing column is empty indicating that the Partner OPC’s are not
placed in any of the drawings and are in the Stockpile.

Now Toggle-off the other drawings and Toggle on the Stockpile with the item type set to OPC as
before.

You will get the list of OPCs which are residing in the stockpile.

75
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Notice that, the Drawing Number column is empty indicating again that they are yet to be placed
in the drawing. But you can see the partner OPC drawing number.

Now pick the first OPC and place it in the drawing as shown.

Zoon in to the OPC.

76The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

OPC Tag will be same as its partner OPC. Also you will see the partner OPC’s drawing number
displayed on the OPC.

Open Continuation Drawing:

Right Click on OPC and select ‘Open Continuation Drawing’

This will open the drawing where in you will find the partner of this OPC.

77
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Select Window-Tile Vertically.

You can see both the drawings now.

78The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Close PR-PID-0016 drawing and place the remaining OPCs as shown.

Note: You will not be prompted to choose the direction while placing the OPCs from stockpile.
It gets aligned to its partner who is already in the other drawing.

Open the drawing PR-PID-0017 and place the remaining OPCs from the Stockpile.

\Piping\Labels - Piping Segments\Flow Direction.sym

79
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

\Piping\Fittings\End Components\Open End

Symbols\Design\Graphics\Material Flow – Straight

80The inf
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

Rotate the symbol.

\Piping\Piping OPC's\Off-Drawing.sym

\Design\Graphics\Block

81
amrajasekar4321@g SMART PLANT TRAINING MANUAL
mail.com
20. P&ID Lab

82The inf