You are on page 1of 13

UTHM UNIVERSITITUN HUSSEIN ONN MALAYSIA

Centre forDiploma Studies

DEPARTMENT OF CIVILENGINEERING

HIGHWAY AND TRAFFICENGINEERING LABORATORY

LAPORAN MAKMAL/LABORATORY REPORT

Nama Kursus/
HIGHWAY AND TRAFFIC ENGINEERING
Course Name
Kod Kursus/
DAC 21903
Course Code
TajukUjikaji/
SPOT SPEED STu0Y
Title
of Experiment
Lecturer/
Instructor
CIK NOPNAJIHAH 6iNTIMOHAMmAD YAziD
Name
Seksyen /Section
Kumpulan/Group
Nama Ketua WAN MuHAMMAO FATHI No.Matrik
Kumpulan/Group IRSYAD eIN WAN PuTERA
LeaderName |SHAH AA2544
Nama AhliKumpulan/
No.Matrik /Assessment
Penilaian
Group Members
1 PuTERI ALYA ADRIANA
AAD12630 Data (Data) 25 %
8INTIYusuAN
2 SuJA 2UHANISAH Analisis/Keputusan
25 %
A A21 773
|8INT JAKAPIAA |(Analysis/Result)
Perbincangan

|
30

/
TarikhUjikaji
Date ofExperiment
TarikhHantar/
C NOVEMBER 201
(Discussion)
Kesimpulan
((Conclusion)
Conclusion)
20%

100
NOvEMBER 2022 JUMLAH/TOTAL
Date ofSubmissionl6 %

ULASAN PEMERIKSA/COMMENTS cOP DITERIMA/APPROVED STAMP


gUTHM TUN HUSSEIN ONN MALAYSIA
UNIVERSsITI
Centre ofDiploma Studies

STUDENT CODE OF ETHIC


(SCE)

DEPARTMENT OF CIVILENGINEERING

CENTRE OF DIPLOMA STUDIES

I alsoadmit
I,
hereby confess thatI haveprepared thisreporton my own effort.
not
to receiveorgiveany help duringthe preparationof thisreportand pledge
thateverythingmentioned inthe reportistrue.

StudentSignature

Name $UJA.Z4HANISAH BT JAKARIA

Matric No.:
AA212133..

Date 4.NOVEMBEP..202.
LABORATORY 4
SPOT SPEED STUDY

1.0 INTRODUCTION

Speed isthe rateof a vehicle


movement. generallyexpressed inkikometerper hou
isa studyoftraffic
(km/h).A spot speed studly atone pointorspot
treefliowvelocity
on a traffic
way usuailyat a midpoint.
Itconsistsof a seriesof individkual
speed
observations.
These observationsare used to estimatethe speed distnibution
of the
entretraic
stream at thatlocation,
under the conditions at the time of
prevailing
the study. Spot speed study can be used to investigatespeeds at problematic
locationsto justifycomplaints
relatedto speedingorroad safetyssues.Other than
that,spot speedstudy alsocan be used tovalidate
suitableposted speedimiton
a new roadbased on its85h percentile
speed.

2.0 OBJECTIVE

a To determine the speed parameters of traffic


(mean, mode, median. 85
percentile.
pace & standard deviation)

the speedingissueat the location


Tojustity of study

3.0 APPARATUS

3.1Laser
Speed Gun
3:2 Forms SSIand Ss2
3.3 Graph Papers
34 SafetyVest

LAB4-1
Figure2:LaserSpeed Gun

4.0 PROCEDURE

4.1 Identify location


any suitable at whichthe speed data will
be collected.
4.2 Use the laserspeed gun to measure the
speed of vehicles
accordingto their
respectivevehicle
class:
a) Class1-
Motorcycles
b) Class2-Cars

c) Class3-Vans & Medium Trucks


d) Class4 - LargeTrucks& Buses
Make surethatthe operatorof the lasergun is not seen by the motorists.
4.3 Record allspeed measurements inForm SS1.
4.4 Transfer
the datainForm SS1 to Form S$2.

LAB4-2
5.0 DATA AND ANALYSIS

Form SS1

SpotSpeed (km/h)
Time VehicleClassification
2 3 4

(Motorcycles) (Cars) (Vans&Medium Trucks) (LargeTrucks & Buses)

4 63 19 65 4+
44 7G 72 CS 5
44 75 43 58 +0
33 51 31
Yam.
73 7 55 C2
la.m.
43 46 C3
56 33 GS
33 74 63 45
70 14 41
58
G4 G4
54 34+

44
47

64

61

LAB4-3
Form S$2
ClassMid Class Cumulative
Speed Class Percentage
()

|
Value,x Frequency,f fx Percentage
(km/h) inClass
(km/h) (veh) (%)
31- 39 35 3 IO5 6
40-43 44 434 28
49-57 53 6 38 40
58 CC 62 IS 30 30 70
C7 75 7
C34 8

76 84 490 (2 O0

Z 345 50 Z 295
Plotthe following
diagram on the graph giveninAppendix:
a) Frequency Histogram (Percentage
of vehicles
vs.Speed)
b) Frequency Distribution
Curve (Percentageof vehicles
vs. Speed)
c) CumulativeFrequency Distribution
Curve (Cumulative
percentagevs.Speed)

Speed Parameters and Result


Calculation
Mean
54.12
Mode
C2 km /h
Pace

Median
57 C6
(50th percentile)
56.3Emlh
85th percentile
C4.5 km/h
Standard deviation
13.17

LAB4-4
( Fequency Histogram (Percotage of vehiclesvs. Spe«d)

Percentae 1
()
class

2MM SQUARE 20CM x 24CM


Marterpin
(Fequency Disicr
Curve krantage od wwte Seeed

elrfdedpreedae

cias ()

C2

2M SQUARE 20CA X 24CM


(C) on
Cumulative Frequency Oisthibuti Curve (Cumulafi
ve percantage
Sped)

Cumulchv ()
perdtntage

7
.
prroh
mh

2MM SQUARE 20CM X 24CM Meterpin


No. Dato

Mean

Mean speed -Zfa


n

frrquency ofobsuvations m theparticular


class
= mid-pointof euch class
fotalnumber of observ
ations 2f
Mean 105 +48 t313t130t634 t40
2956
50
59.12

Standard deviahion -
=|zfa2
Standarddoviatíon (zfn)
n- nn-0
f trequencyot observaionsiothe parhculardass
mid-point
ofeach class
n s
of corrvation
fotal_numbar zf
Standard deviation(33254)
(2956)2
50-1 50(50-1D
13.17
DiSLUSSioN

Tnntkers lehen
oe e aiors a a He dai tleciin
evait vttle spetd.
Tu te shd
r benn cndeled tleieis e bnutt sd
roule o
asi
e
ihe
wwwwety
ethdy
nd
ovea
seeft
ave drv
ice
hettg

HenrstyTmevefert atcording e
h
rea
hag been cevied out
vekek
ths shdy area de w*exçeed
set m
Beades,the ehv ha havettn tontetved is he
smt
Luve in retvievina
detn.So o otertnciesfei
fossinaa e hdy oa tve elaptd f
our deleeken betast thetr pmal) eith inu
veb spetd.

Teeton of 35H petemtHle sed.

i T he net
Tue 8 peuttilespeed yeed thal dees
xceed 3s rent yettnt to
tuulafive
dofa the shndy wmeve drivin
ow pekitlo
ad waityo dvives
gafe.S, the

i
on e is con sidered
rovd tonsiderHhatHtsspeed utolle
Tis isa
sale under hese cenditiens. good
and
to stov hen deerwiuin
o out he right sper
lit Fov he rood.
To teiayesto tonrolspeedina infhe aea

Tn isssion,
fivttthin to outro speedina aveb
stmake sure to de the reseovc in an oyen
plae that eam be seen bthe
driver the sotho
Some o hem cAn reducehe Spetd on he vood
By s wu, tue deta collecked ill be move cowsisent.
One move teenniqe tocontrolsperèing fhe ati
Sinstll Hhe Spees limit eawme va Iu
the road users willslow dewn teir vehiele hen
the
he notie the speed zwt Camera he orep.

CONCLUSION

The this stdy is to determime he


the
Speed chovaeteriskie oftraffit
streom t the aven ond
t jy Hhe seeding issue he in area Inths
sud,e
: hits shdy that
,. Mott
e5oo
o
conelude
rond sers
that

of drivers speeding
Prom
in the are
eir
arespeedna as
at S6
vekicle n/
ond obove. The drivers he area mtlpecding
km/h with S7 to 66 k/h in Spees
speed ragc
ro the mest of then and the overoage Spee in
e are fron 0r iSt
ivwestigation kn/h.T
pecd in e
ruelinn oe a et exeed 61.5 /h.

,.
:

You might also like