MUNICIPAL COUNCIL RAJURA

AUG. TO RAJURA WATER SUPPLY SCHEME


Tal.:- Rajura Dist.:- Chandrapur
RAJURA
Requirment Of Water At Consumer End

Sr. Daily Requirement Initial Stage Immediate Stage Ultimate Stage


No. Year - 2025 Year - 2040 Year - 2055
1 Population (Souls) 41657 52546 63709

2 Rate of water Supply for 135 135 135


Domestic purpose through lpcd lpcd lpcd
house connection

3 Daily domestic demand in Litres 5623730 7093688 8600703


In Mld 5.62 7.09 8.60

4 Semicommercial Demand in Mld 0.42 0.49 0.57


(Semicommercial Demand 7.5% of
Present stage demand is considered
as per Amrut 2.0 Guideline and
further increase @1% per year to
arrive at future demand)

5 Net Total requirment at consumers 6.05 7.58 9.17


End in Mld

6 Total Requirment at consumer end 6.05 7.58 9.17

7 Total demand with 15% Losses 7.11 MLD 8.92 MLD 10.79 MLD

8 Yearly Demand 2.60 Mm^3 3.26 Mm^3 3.94 Mm^3

Prepared by : VB Enviro Consultant.

Junior Engineer Chief Officer


Municipal Council Municipal Council
Rajura Rajura