Professional Documents
Culture Documents
AURAIYA
SALIENT FEATURES
As per
A. census 2011 32252
Middle
C. 2032 49085
Year
Design
D. 2047 62070
Year
9 Rate of Water Supply : 155.25 (135 lpcd +15%) Litres per head per day
10 Nature of Source : Ground Water
11 Source of Development : Tube Well
12 Daily Water Demand A. Initial Stage 2017 6010 KLD
B. Middle Stage 2032 7620 KLD
C. Ultimate Stage 2047 9640 KLD
13 Number of Tube Well : Ten Numbers
14 (a) Nature of Treatment : Chlorination through Electromagnetic liquid dozer of
of Water capacity 24 gallons.
(b) Dosing capacity : A. Average 0.50 Mg./l.
: B. Minimum 0.20 Mg/l.
: C. Sluice/Scour Valve 91 Nos.
: D. Air Valve 15mm dia 23 Nos.
: E. Fire Hydrant 80mm dia 06 Nos.
15 Estimated Capital Cost (Rs.
In Lac) : #REF!
ASSISTANT ENGINEER
Salient Feature
Dalmau is one of the oldest town of U.P., Dalmau is situated on the bank of Ganga River. Dalmau town
is geographically located at 27 o04′ to 26o06′ N Latitude and 81o03′ to 81o06′ East Longitude.
2- Project Objective
Providing Interception/Diversion of drains Sewage Pumping Stations and Sewage Treatment Plant for
collection, conveyance and treatment of municipal sewage of the town.
3- Population Served- Projected Population for Dalmau Nagar Panchayat is given below:
7- Design Criteria :
7.1 Guidelines - As per Central Public Health & Environmental Engineering Organization
(CPHEEO) manual
7.2 Design Period - Base Year- 2024
- Design Year - 2054 (30 Years design period)
7.3 Peak Factor - As Per CPHEEO manual
- 3.00 for population < 20,000
- 2.50 for population 20,000 - 50,000
- 2.25 for population 50,000 - 7,50,00
- 2.00 for population > 7,50,000
7.4 Rate of Water Supply - 135+15% losses lpcd
8- Wastewater Generation
Waste water Generation for Dalmau Nagar Panchayat for various design years considering pupulation
within muncipality and floating population is given below:
For Year 2024 - 1.22 MLD
For Year 2039 - 1.40 MLD
For Year 2054 - 1.58 MLD
9- Proposals:
For the Interception/Diversion work of drains and Sewage treatment works, proposed under this
Detailed Project Report.
9.1 Existing drains discharge into natural drain and ultimately into Ganga River. It is therefore necessary
that the drains are Intercepted and discharge diverted, for treatment of sewage/Sludge and effluent
with permissible limits discharged into Natural Drainage in accordance with directives and guidelines
under National Mission Clean Ganga Programme.
9.2 Discharge of drains was measured during the period 20.01.2020 to 15.02.2020. Discharge of drains has
been projected and anticipated drain discharge at different stages of the project that is at Initial stage
year 2024, Middle stage year 2039 and Ultimate stage year 2054 has been computed. Calculations for
discharge of drains based on population at different stages of project have been done these figures are
given in the attached table. Out of the values of drain discharge arrived at by the above two methods,
higher values of discharge have been adopted for proposals under this Detailed Project Report.
9.3 Taking into consideration location/discharge/slope of existing drains/topography of area gradient and
position of outfall of drain into Ganga River. Major drain Padwa Nala is proposed to be
intercepted/diverted, discharge of drain will be conveyed to sump of proposed Sewage pumping
station of 6.0 M dia, from sewage pumping station discharge of drain is proposed to be pumped into
inlet chamber of Sewage Treatment Plant of 3 MLD capacity based on SBR Technology being located at
comparatively higher elevation above the HFL. Subsequent to treatment effluent within permissible
limits will be discharged into Natural drainage.
9.4 For the remaining 8 numbers drains, namely Sadak Ghat drain/Pathwari drain/Din shah gaura drain/
Mahaveer drain/ Shukul ghat drain/ Barudaghat drain/ Bada math drain and Shamshan Ghat drains,
Interception & diversion works are proposed. Discharge from the drains will be transferred to gravity
sewer of 250mm/300mm dia from Sadak ghat drain upto Bada math drain having outfall into sump of
sewage pumping station 6.0M dia. Discharge from Shamshan Ghat drain will be Intercepted and
diverted to sump of sewage pumping station 6.0 M dia through gravity sewer of 250mm dia. From
Sewage pumping station waste/Sludge will be pumped through rising main upto inlet of sewage
treatment plant of 1.0 MLD capacity based on Wetland Technology, subsequent to treatment, effluent
having permissible parameters will be discharged into Natural drainage. Provision has also been made
for channel length 500m with outlets for Irrigation of Agricultural fields as and when required.
Schedule
10 of Rates:
The rates of Construction Materials and labour are based on the rates sanctioned by the
Superintending Engineer, III Circle, UP Jal Nigam, Lucknow vide letter No. 1822/WG-34/05 date
13.09.2019. Rate of materials under centralized purchase are as per Materials Manager, U.P. Jal
Nigam, Lucknow letter No. 2636/PC/General (2121-052)2019/97 Dated: 24/09/2019 and
2341/PC/General (2121-052)2017/243 Dated: 03/10/2017. Rates of RCC pipes are in accordance with
latest market rates.
The rates used for E&M work are based on the current market/budgetory offer received from the firms
is attached in Volume-III.
11 COST OF PROJECT
11.1 Cost of Project - Rs. 3445.30 Lacs
11.2 O & M Cost for First 15 Years - Rs. 3778.42 Lacs
11.3 TOTAL COST OF PROJECT Rs. 7223.72 Lacs (Including O&M for 15 years)
ASSISTANT ENGINEER
DALMAU NAGAR PANCHAYAT AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE
TREATMENT SCHEME, DISTRICT – RAIBARELI
A Basic cost
1 Basic Cost of work -Civil works 2181.66 2181.66
2 Basic Cost of work -E&M works 501.58 501.58
Sub Total 2683.24 2683.24 ###
B Centage Charges
1 Centage Charges @ 8% born by GOI 214.66 214.66
2 Centage Charges @ 4.50% born by State Govt. 120.75 120.75
Sub Total 335.41 214.66 120.75
C Cost of work which no Centage is admissible
1 Hiring of Godown 3.60 3.60 ###
2 Cost of Power Connection 43.73 43.73 ###
3 Cost of Land for STP & IPS 0.00 0.00
4 Communication and Public Out reach. 5.00 5.00
5 Environment and Management Plan. 20.00 20.00
6 Governance and Accountability Action Plan. 5.50 5.50
Sub Total 77.83 77.83 ###
D Other Charges ###
Labour cess @ 1% of basic cost 26.83 26.83 ###
Sub Total 26.83 26.83 ###
E GST @ 12% of basic cost of work 321.99 321.99
F Total (A+B+C+D+E) 3445.30 3324.55 120.75
Operation & Maintenance for first 15 years of
G commissioning of project .
3778.42 3778.42
Total (O&M 15Years) 3778.42 3778.42
Recommended Approved
A Basic cost
1 Basic Cost of work -Civil works 2181.66 2181.66
Sub Total 2181.66 2181.66 ###
B Centage Charges
1 Centage Charges @ 8% born by GOI 174.53 174.53
2 Centage Charges @ 4.50% born by State Govt 98.17 98.17
Sub Total 272.70 174.53 98.17
C Cost of work which no Centage is admissible
1 Hiring of Godown 3.60 3.60 ###
2 Cost of Land for STP & IPS 0.00 0.00
3 Communication and Public Out reach. 5.00 5.00
4 Environment and Management Plan. 20.00 20.00
5 Governance and Accountability Action Plan. 5.50 5.50
Sub Total 34.10 34.10 ###
D Other Charges ###
Labour cess @ 1% of basic cost 21.82 21.82 ###
Sub Total 21.82 21.82 ###
E GST @ 12% of basic cost of work 261.80 261.80
Total Cost(A+B+C+D+E) 2772.08 2673.91 98.17
Operation & Maintenance for first 15 years of
G commissioning of project .
912.24 912.24
Total (O&M 15Years) 912.24 912.24
Recommended Approved
A Basic cost
1 Basic Cost of work -E/M works 501.58 501.58
Sub Total 501.58 501.58
B Centage Charges
1 Centage Charges @ 8% born by GOI 40.13 40.13
2 Centage Charges @ 4.50% born by State Govt 22.57 22.57
Sub Total 62.70 40.13 22.57
C Cost of work which no Centage is admissible
1 Cost of Power Connection 43.73 43.73
Sub Total 43.73 43.73 0.00
D Other Charges
Labour cess @ 1% of basic cost 5.02 5.02 0.00
Sub Total 5.02 5.02 0.00
E GST @ 12% of basic cost of work 60.19 60.19
Total Cost(A+B+C+D+E) 673.22 650.65 22.57
Checked Approved
SITAPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE TREATMENT SCHEME, DISTRICT – SITAPUR
PROFORMA FOR CALCULATION OF 15 YEARS OPERATION & MAINTENANCE COST OF (E&M WORK)
S. Particulars Basic cost Maintenanc Total Cost
No. e charges @ Annual O & M Cost Rs. Lacs of O&M of
per year each item
1st year 2nd year 3rd year 4th year 5th year 6th year 7th year 8th year 9th year 10th year 11th year 12th year 13th year 14th year 15th year ∑(5 to 19)
Inflation @8%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Repair and
1 Maintenance 1661.25 1% 0.00 17.94 19.38 20.93 22.60 24.41 26.36 28.47 30.75 33.21 35.87 38.73 41.83 45.18 48.79 434.45
(Pumping Plant + Sub-
Station+DG Set+ STP)
2 Power 74.55 - 74.55 80.51 86.96 93.91 101.42 109.54 118.30 127.77 137.99 149.03 160.95 173.82 187.73 202.75 218.97 2024.19
3 SCADA System 160.00 1% 0.00 1.73 1.87 2.02 2.18 2.35 2.54 2.74 2.96 3.20 3.45 3.73 4.03 4.35 4.70 41.84
Solar Panel /
4 1006.49 1% 0.00 10.87 11.74 12.68 13.69 14.79 15.97 17.25 18.63 20.12 21.73 23.47 25.35 27.37 29.56 263.22
Power Grid
Total 74.55 111.05 119.94 129.53 139.90 151.09 163.17 176.23 190.33 205.55 222.00 239.76 258.94 279.65 302.02 2763.70
ASSISTANT ENGINEER
DALMAU NAGAR PANCHAYAT AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE
TREATMENT SCHEME, DISTRICT – RAIBARELI
Assistant Engineer
DALMAU NAGAR PANCHAYAT AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE
TREATMENT SCHEME, DISTRICT – RAIBARELI
1
I & D Works/Tapping of drain /Const. of Grit 423.99 423.99
chamber & collecting chamber (09 nos. Drains)
2
Sewer system and appurtenant works (1.315 348.69 348.69 - -
Kms.)
3
Sewage Treatment Plant 1025.00 1025.00 - -
(STP-1, 3 MLD and STP-2, 1MLD)
4 Rising Main (150 M) 15.24 15.24 - - -
5 Sump cum pump house (6 M/6 M) 154.20 154.20 - - -
6 Effluent disposal drain (500 M) 35.30 - 35.30 - -
7 Staff Quarter 44.90 44.90 - - - -
8 Boundary wall, Approach road and gate 71.10 71.10 - - - -
9 Rain Water Harvesting 24.96 24.96
10 Construction of Drain 5.04 5.04
11 Electric Power Sub Station / Control Panel 98.48 98.48 - - -
12 Pumping Plants 330.08 - - - - 330.08
13 D.G Set 39.88 - - - 39.88
14 SCADA System 66.38 66.38
15 Hiring of Godown (36 mpnth) 3.60 3.60
16 ESAMP 20.00 - - - - 20.00
17 Communication and Public Outreach 5.00 - - - - 5.00
18 GAAP 5.50 5.50
19 Transmission line & Power Connection 43.73 43.73
TOTAL 2761.07 169.44 663.43 35.30 1373.69 66.38 452.83
Operation and maintenance for 15 year 3778.42 - - - 3778.42
Assistant Engineer
DALMAU NAGAR PANCHAYAT AREA INTERCEPTION/DIVERSION OF
DRAINS AND SEWAGE TREATMENT SCHEME, DISTRICT – RAIBARELI
From data/details in above table, it is evident that the scheme will function in Profit from the Initial stage
at the commencement of scheme in the Year 2024 and upto the end of Design stage year 2054.
Assistant Engineer
#REF!
Form 'J'
(COMPREHENSIVE)
PREPARED RECOMMENDED
CHECKED APPROVED
( HARISH CHANDRA )
Computer Chief Engineer
Construction Unit (Lucknow Zone)
U.P. Jal Nigam, Lucknow U.P. Jal Nigam Lucknow
JAUNPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS AND
SEWAGE TREATMENT SCHEME, DISTRICT – JAUNPUR
Checked Approved
(V.P.Mishra )
Junior Engineer(T) Chief Engineer
Construction Division ( Varanasi Zone )
U.P. Jal Nigam, JAUNPUR U.P. Jal Nigam, Varanasi
JAUNPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS
AND SEWAGE TREATMENT SCHEME, DISTRICT – JAUNPUR
Assistant Engineer
JAUNPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF
DRAINS AND SEWAGE TREATMENT SCHEME, DISTRICT – JAUNPUR
Assistant Engineer
JAUNPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF
DRAINS AND SEWAGE TREATMENT SCHEME, DISTRICT – JAUNPUR
MAINTENANCE COST
Sl.
Description CIVIL E&M Total
No.
1 Maintenance Staff at STP 88.44 88.44
YEAR
Sl. DESCRIPTION Initial Middle Ultimate
No. Stage 2024 Stage 2039 Stage 2054
Assistant Engineer
DALMAU NAGAR PANCHAYAT AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE TREATMENT SCHEME,
DISTRICT – RAIBARELI
1 Sewage Pumping Station 15420000.00 1.00 154200.00 1.50 231300.00 2.00 308400.00
Channel /Pipeline/Sewer
3 140899000.00 1.00 1408990.00 1.50 2113485.00 2.00 2817980.00
System & Appurtenant works
Assistant Engineer
ESTIMATE FOR COMMUNICATION AND PUBLIC OUT REACH
S. Amount
Description Qty. Unit Rate
No. (In Lacs)
1 2 3 4 5 6
1 Provision for the governance and
accountability action plan (GAAP) is
minimize accountability risk to the
NGRBA programme specific
arrangement have been proposed to
Mitigate their risks and to ensure that
the funds are used effectively and
efficiently.
1.1 Communication/Consultation and
Job L.S. 3.41
Information Disclosure
1.2 Use of Social Audits Job L.S. 2.09
TOTAL 5.50
JAUNPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE TREATMENT
SCHEME, DISTRICT – JAUNPUR
YEARLY EXPENDITURE ON MAINTENANCE
A Maintenance Staff
S. No. Description of Staff No. Per Month Amount (Lac)
1 Work Supervisor 2 18000 4.32
2 Pump Operator Grade -1 5 20000 12
3 Pump Operator Grade -2 5 15000 9
Beldar/ Chowkidar/ 5
4 Mali 7000 4.2
5 Sweeper 2 7000 1.68
Total 31.2
Assistant Engineer
DALMAU NAGAR PANCHAYAT AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE TREATMENT SCHEME,
DISTRICT – RAIBARELI
1 CIVIL WORKS
A Maintenance Staff
S. No. Description of Staff No. Per Month Amount (Lac)
1 Work Supervisor 2 18000.00 4.32
2 Pump Operator Grade -1 3 20000.00 7.20
3 Pump Operator Grade -2 3 15000.00 5.40
Beldar/ Chowkidar/ 3
4 Mali 7000.00 2.52
5 Sweeper 2 7000.00 1.68
Total 21.12
O & M for 15 Years Civil Works (Inflation as per latest guidelines of NMCG )
S. no. Maintenance Maintenance Electricity Cost Chemical Diesel Cost Total Cost of O
Staff Cost Cost & M Cost
1 1st Year 21.12 23.08 0.00 4.45 0.00 48.65
2 2nd Year 21.87 23.91 0.00 4.61 0.00 50.39
3 3rd Year 22.63 24.73 0.00 4.77 0.00 52.13
4 4th Year 23.38 25.56 0.00 4.93 0.00 53.86
5 5th Year 24.14 26.38 0.00 5.09 0.00 55.60
6 6th Year 24.89 27.21 0.00 5.25 0.00 57.34
7 7th Year 25.64 28.03 0.00 5.40 0.00 59.08
8 8th Year 26.40 28.86 0.00 5.56 0.00 60.82
9 9th Year 27.15 29.68 0.00 5.72 0.00 62.55
10 10th Year 27.91 30.51 0.00 5.88 0.00 64.29
11 11th Year 28.66 31.33 0.00 6.04 0.00 66.03
12 12th Year 29.41 32.16 0.00 6.20 0.00 67.77
13 13th Year 30.17 32.98 0.00 6.36 0.00 69.51
14 14th Year 30.92 33.81 0.00 6.52 0.00 71.24
15 15th Year 31.68 34.63 0.00 6.68 0.00 72.98
Total O & M Cost for 15 Years (Civil Works) 395.97 432.83 0.00 83.45 0.00 912.24
2 E&M Works
O&M Cost of 15 years for SPS-1 & STP 2392.64
Total O & M Cost for 15 Years (Civil Works + E&M Works) 3778.42
ASSISTANT ENGINEER
SITAPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS
AND SEWAGE TREATMENT SCHEME, DISTRICT – SITAPUR
At Initial Stage Year 2024 At Middle Stage Year 2039 At Ultimate Stage Year 2054
Sl. Description Pay & Pay & Pay &
No. No. Period Amount No. Period Amount No. Period Amount
Allowance Allowance Allowance
(Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
Project Engineer
OFFICE OF THE EXECUTIVE ENGINEER, II CONSTRUCTION DIVISION (E/M),
U.P. JAL NIGAM, VARANASI
SITAPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS AND SEWAGE TREATMENT SCHEME, DISTRICT – SITAPUR
(Rs in Lacs)
S. Zone & MPS/IPS Cost of Sewage pumps Cost of Scada Solar Panel Power Grid Maintenance Maintenance Total For Cost of Cost of
No complete including Diesel System & cost for cost for DG S.No 3-7 Control Power
Spares, Generator MCS Pumps for 12 Set for 12 Panel connection
Tools/Spanners, Misc. set Months Months & Sub
items works, Internal & station
External Electrification
1 2 3 4 5 6 7 8 9 10 11 12
1 Zone-1 IPS-1 140.12 45.40 245.73 218.43 38.99 11.83 649.68 38.00 22.49
2 Zone-2 IPS-2 157.57 45.40 94.00 83.55 53.03 11.83 380.52 41.10 24.33
3 Zone-3 IPS-3 139.72 45.40 100.71 89.52 43.36 11.83 375.35 41.10 19.88
4 MPS 346.85 205.10 160.00 91.00 83.55 102.64 108.41 886.50 68.60 97.56
ASSISTANT ENGINEER
SITAPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS
AND SEWAGE TREATMENT SCHEME, DISTRICT – SITAPUR
A Basic cost
Assistant Engineer
SITAPUR NAGAR PALIKA PARISHAD AREA INTERCEPTION/DIVERSION OF DRAINS AND
SEWAGE TREATMENT SCHEME, DISTRICT – SITAPUR
(UNDER NATIONAL MISSION FOR CLEAN GANGA )
FINANCIAL STATEMENTS
Form 'J' (Comprehensive)
Rs. In Lacs
Break up
S. No. Description Total GOI share State Share
A Basic cost
1 Basic Cost of work -Civil works 2181.66 2181.66
2 Basic Cost of work -E&M works 501.58 501.58
Sub Total 2683.24 2683.24 ###
B Centage Charges
1 Centage Charges @ 8% born by GOI 214.66 214.66
2 Centage Charges @ 4.50% born by State Govt 120.75 120.75
Sub Total 335.41 214.66 120.75
C Cost of work which no Centage is admissible
1 Sewer cleaning/ equipment and Flushing van Err:509 Err:509 ###
2 Hiring of Godown 3.60 3.60 ###
3 Cost of Power Connection 43.73 43.73 ###
4 Cost of Land for STP & IPS 0.00
5 Communication and Public Out reach. 5.00 5.00
6 Environment and Management Plan. 20.00 20.00
7 Governance and Accountability Action Plan. 5.50 5.50
Sub Total Err:509 Err:509 30.50
D Other Charges ###
Labour cess @ 1% of basic cost 26.83 26.83 0.00
Sub Total 26.83 26.83 0.00
E GST @ 12% of basic cost of work 321.99 321.99
F Total (A+B+C+D+E) Err:509 Err:509 151.25
Operation & Maintenance for first 15 years of
G commissioning of project . 912.24 912.24
Electricity Cost 0.00 0.00
Total (O&M 15Years) 912.24 912.24
Total (F+G) Err:509 Err:509 151.25
Checked Approved
(V.P.Mishra )
Computer Chief Engineer
Construction Division ( Varanasi Zone )
U.P. Jal Nigam, SITAPUR U.P. Jal Nigam, Varanasi
23.08 34.62 1 1.50 23.08 230824 2.30824 1
11.54 2 3.00 23.91 23.08 2
0.769333 2.308 3 4.50 24.73 23.08 3
4 6.00 25.56 23.08 4
5 7.50 26.38 23.08 5
6 9.00 27.21 23.08 6
7 10.50 28.03 23.08 7
8 12.00 28.86 23.08 8
9 13.50 29.68 23.08 9
10 15.00 30.51 23.08 10
11 16.50 31.33 23.08 11
12 18.00 32.16 23.08 12
13 19.50 32.98 23.08 13
14 21.00 33.81 23.08 14
15 22.50 34.63 23.08 15
0.00 21.12 31.68 1 0.00 4.45 6.675
3.00 21.87 23.08 2 3.00 4.61 23.08
4.50 22.63 23.08 3 4.50 4.77 23.08
6.00 23.38 23.08 4 6.00 4.93 23.08
7.50 24.14 23.08 5 7.50 5.09 23.08
9.00 24.89 23.08 6 9.00 5.25 23.08
10.50 25.64 23.08 7 10.50 5.40 23.08
12.00 26.40 23.08 8 12.00 5.56 23.08
13.50 27.15 23.08 9 13.50 5.72 23.08
15.00 27.91 23.08 10 15.00 5.88 23.08
16.50 28.66 23.08 11 16.50 6.04 23.08
18.00 29.41 23.08 12 18.00 6.20 23.08
19.50 30.17 23.08 13 19.50 6.36 23.08
21.00 30.92 23.08 14 21.00 6.52 23.08
22.50 31.68 23.08 15 22.50 6.68 23.08