ESTIMATE FOR PHULPUR NAGAR PANCHAYAT WATER SUPPLY

REORGANISATION SCHEME, DISTRICT-AZAMGARH


UNDER
AMRUT 2.0
ABSTRACT OF COST FOR PUMP HOUSE CUM CHLORONOME

Sl. Rate Amount


Particular Qty. Unit
No. (Rs. In Lacs) (Rs. in Lacs)

1 2 3 4 5 6
1 Construction of Pumphouse cum
Chloronome size (3.60 x 3.0 x 3.60 and 1.8
x 2.50 x 3.0M) including supply of all
material, labour, T&P etc complete asper
departmental type design. (As per Unit
estimate attached).

Zone-2 (FOR T.W. no. 3) 1


Zone-3 (FOR T.W. no. 4 & 5) 2
TOTAL 3 No. 6.26 18.78
Supply of all materials Tool and plants and
2 construct Byepass chamber 3 No. 0.24 0.72
Total 19.50

ASSISTANT ENGINEER
PHULPUR NAGAR NAGAR PANCHAYAT WATER SUPPLY
REORGANISATION SCHEME, DISTRICT- AZAMGARH
UNDER
AMRUT 2.0
ABSTRACT COST OF RISING MAIN AND APPURTENANT WORKS

S.
Item of Work Qty. Unit Rate Amount
No.
1- Supply of following Sizes of D.I. pipes
class K-7 with all jointing materials as
per I.S. 8329/2000 or its latest
amendments including F.O.R.
destination and all taxes and
insurance etc. complete.
150 mm dia class K-7 40.00 M 1639.00 65560.00
200 mm dia class K-7 1020.00 M 2127.00 2169540.00
Total 2235100.00
2- Supply of specials for above item no.
1 10% on item no.1 223510.00
3- Supply of following sizes C.I. Sluice
Valves/Scour Valves with Cap/Air
Valve capable of with standing
working pressure of 10 Kg/cm 2
including F.O.R. destination and all
taxes and insurance etc. complete.
(i) 150 mm dia 2 Nos. 51420.00 102840.00
(ii) 200 mm dia 4 Nos. 92420.00 369680.00
4- Excavation of earth for pipeline work
with lift upto 1.5 and lead upto 50M
filling back the earth into trenches
including watering and ramming and
disposal of surplus material with in
50M lead etc. complete.
(a) Excavation in Ordinary Soil 714.70 Cum 295.95 211515.46
(b) Excavation in soil mixed with
moorum, bajri & Pebble etc. 306.30 Cum 344.33 105468.28
5- Supply of all materials and construct
following type valve chambers
complete as per type design.

(a) Masonary Type Chamber 6 Nos. 22800.00 136800.00


S.
Item of Work Qty. Unit Rate Amount
No.
6- Cartage from store to site of work
following D.I. Pipe with specials,
lowering the same into trenches and
laying true to alignment and gradient,
including jointing properly, testing of
pipe line (but excluding the cost of
trenching and cutting of pipes for
making the length) etc. complete.

150 mm dia 40.00 M 62.01 2480.40


200 mm dia 1020.00 M 75.39 76897.80
7 Carting of following sizes CI/DF Sluice
Valve/C.I. Air Valve and specials from
departmental store to site of work
and lowering them into the trenches,
fixing in position and jointing them
with pipeline and testing etc.
complete.

i) Sluice valve
150 mm dia 2.00 No. 2074.24 4148.48
200 mm dia 4.00 No. 2257.82 9031.28
8- Dismantling of following type road
and stacking of useful material.
a) Bitumen Road 200.00 Sqm. 226.00 45200.00
b) Interlocking Road 616.00 Sqm. 193.40 119134.40
9- Reinstatement of following road
charges to be paid to PWD/Loacal
Body.

a) Bitumen Road 200.00 Sqm. 1434.36 286872.00


b) Interlocking Road 616.00 956.10 588957.60
10 THRUST BLOCK
(a) RCC with cement, coarse sand and
20mm gauge stone ballast in
proportion of 1:1.5:3 for thrust block
of pipeline excluding supply of
reinforcement and its bending but
including its fixing and binding wire in
proportion, necessary centering and
shuttering including curing and supply
of all materials, labours T&P etc.
required for proportion completion of
work.

150mm dia 0.686 Cum 16842.55 11553.99


200mm dia 4.912 Cum 16842.55 82730.61
S.
Item of Work Qty. Unit Rate Amount
No.
(b) Mild steel or iron work in RCC work
brought to required shape as
necessary including bending for
proper completion of work.

150mm dia 0.81 Qtl. 11089.98 8958.49


200mm dia 5.78 Qtl. 11089.98 64144.44
11 Site Clearance. Job - L.S. 363.64
Total 4685386.87
OR (Lacs) 46.85

Assistant Engineer
PHULPUR NAGAR NAGAR PANCHAYAT WATER SUPPLY
REORGANISATION SCHEME, DISTRICT- AZAMGARH

DETAILED MEASUREMENT OF RISING MAIN AND APPURTENANT WORKS


S.
Item of Work No. L B H Qty.
No.
1- Supply of D.I. pipes of following
size/wall thickness with I.S.
8329/2000 or its latest amendments
with jointing materials including for
destination and all taxes and
insurance etc. complete.

150 mm Dia D.I. Pipe Class K-7


a) For Zone-2
From proposed T.W. no. 3 to
1 30 30.00 M
proposed OHT 150 KL / 16 M
By pass arrangement 1 10 10.00 M
Total 40.00 M
b) For Zone-3
200 mm Dia D.I. Pipe Class K-7
From proposed T.W. no. 4 to
1 400 400.00 M
proposed OHT 550 KL / 18M
From proposed T.W. no. 5 to
1 600 600.00 M
proposed OHT 550 KL / 18M
By pass arrangement 2 10 20.00 M
Total 1020.00 M
2- Supply of C.I. specials for above item
no. 1 @10% of item no.1
3- Supply of following sizes C.I. D/F
Sluice Valves/Scour Valves with cap
and capable of withstanding working
pressure of 10 Kg/cm2 including F.O.R.
destination and all taxes and
insurance etc. complete.

Sluice Valve
(i) 150 mm dia 1x2 - - 2 Nos.
(ii) 200 mm dia 1x4 - - 4 Nos.
4- Excavation of earth for pipe line work
with lift upto 1.5 and lead upto 50M
filling back the earth into trenches
including watering and ramming and
disposal of surplus earth upto 50M
away from site of work etc complete.
150 mm dia 1 40.00 0.75 1.15 34.50 Cum
200 mm dia 1 1020.00 0.80 1.20 979.20 Cum
Sub Total 1013.70 Cum
Add extra excavation for specials and fittings. 7.30
S.
Item of Work No. L B H Qty.
No.
Total 1021.00 Cum
(a) Excavation in ordinary soil @ 70% of 1021.00 714.70 Cum
S.
Item of Work No. L B H Qty.
No.
(b) Excavation in soil mixed with moorum, Bajri &
pebble etc. @ 30% of 1021.00
306.30 Cum
5- Supply of all materials and construct
following type valve chamber
complete as per type design.

(a) Masonary Type Chamber 6 6 Nos.


6- Carting from store to site of work
following D.I. Pipe with specials,
lowering the same into trenches and
laying true to alignment and gradient
including jointing properly testing of
pipe line (but excluding the cost of
trenching and cutting of pipe for
making the length) etc. complete
150 mm dia 1 40.00 - - 40.00 Nos.
200 mm dia 1 1020.00 - - 1020.00 Nos.
7- Carting of following sizes CI/DF Sluice
Valve/C.I. Air Valve and specials from
departmental store to site of work
and lowering them into the trenches,
fixing in position and jointing them
with pipeline and testing etc.
complete.

i) Sluice valve
150 mm dia 2 No. 2 No.
200 mm dia 4 No. 4 No.
8- Dismentalling of following type road
and stacking of useful material and
temporary Reinstatement of road
with old materials etc. complete.

Total
a) Bitumen Road 250.00 0.80 200.00 Sqm.
b) Inter locking Road 770.00 0.80 616.00
9- Reinstatement of following road
charges to be paid to PWD/Local
Body.
Total
a) Bitumen Road 200.00 Sqm.
10 THRUST BLOCK
S.
Item of Work No. L B H Qty.
No.
(a) RCC with cement, coarse sand and
20mm gauge stone ballast in
proportion of 1:1.5:3 for thrust block
of pipeline excluding supply of
reinforcement and its bending but
including its fixing and binding wire in
proportion, necessary centering and
shuttering including curing and supply
of all materials, labours T&P etc.
required for proportion completion of
work.
S.
Item of Work No. L B H Qty.
No.
150mm dia 2 0.343 0.686 Cum
200mm dia 8 0.614 4.912 Cum
(b) Mild steel or iron work in RCC work
brought to required shape as
necessary including bending for
proper completion of work.

150mm dia 2 40.39 0.81 Qtl.


200mm dia 8 72.30 5.78 Qtl.
11 Site clearance. Job - - - Job

Assistant Engineer
UNIT ESTIMATE OF PUMP HOUSE CUM CHLORONOME ROOM
3.60 mX3.00 mX3.00 m and 1.80 x 2.50 x 3.00 m
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
1 1001 Excavation in foundation in ordinary
soil (loam,clay or sand ) including
lift up to 1.50 m & lead up to 50 m,
refilling, watering and ramming of
evcavated earth into the trenches
or space betwwen the building
and sides of foundation trenches
or into the plinth and disposal of
surplus earth up to the distance of
50 mfrom the center of the
foundation trenches.

2 5.33 0.90 0.90 8.63


3 3.23 0.90 0.90 7.85
2 2.03 0.90 0.90 3.29
1 2.73 0.90 0.90 2.21
For Apron 1 20.10 0.65 0.10 1.31
For bore well chamber 1 1.26 1.26 1.20 1.91
Deduction 4 0.45 0.90 0.90 -1.46
23.74 Cum 247.07 5865.44
2 1017 Concrete with 40 mm gauge stone
ballast, coarse sand and cement in
proportion of (8:4:1) in foundations
and floors including supply of all
materials, labour, T&P etc. required
for proper completion of the work.

2 5.33 0.90 0.15 1.44 Cum


3 3.23 0.90 0.15 1.31 Cum
2 2.03 0.90 0.15 0.55 Cum
1 2.73 0.90 0.15 0.37 Cum
Apron 1 20.10 0.65 0.08 0.98 Cum
Stair front 2 3.60 0.23 0.15 0.25 Cum
for bore well chamber 1 0.92 0.92 0.15 0.13 Cum
Deduction 4 0.45 0.90 0.15 -0.24 Cum
4.79 Cum 8564.50 41023.96
3 1031 Ist. Class brick work in 1:4
cement and Coarse sand in
foundation and plinth including
supply of all material, labour T & P
etc. required for proper completion
of work.

Ist Footing 2 5.33 0.69 0.30 2.21 cum


3 3.23 0.69 0.30 2.01 cum
1 2.73 0.69 0.30 0.57 cum
2 2.03 0.69 0.30 0.84 cum
IInd Footing 2 5.33 0.58 0.30 1.85 cum
3 3.23 0.58 0.30 1.69 cum
2 2.03 0.58 0.30 0.71 cum
1 2.73 0.58 0.30 0.48 cum
IIIrd Footing 2 5.33 0.46 0.30 1.47 cum
3 3.23 0.46 0.30 1.34 cum
1 2.73 0.46 0.30 0.38 cum
2 2.03 0.46 0.30 0.56 cum
IVth Footing 2 5.33 0.35 0.35 1.31 cum
3 3.23 0.35 0.35 1.19 cum
1 8.00 0.35 0.35 0.98 cum
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
2 2.03 0.35 0.35 0.50 cum
Sub-Total 18.09 cum
Deductions 4 0.69 0.35 0.30 0.29 cum
4 0.58 0.29 0.30 0.20 cum
4 0.46 0.23 0.30 0.13 cum
4 0.35 0.18 0.35 0.09 cum
0.71 cum
Total 17.38 cum 7975.97 138622.36
4 1054 20 mm thick D.P.C. with
cement and approved coarse
sand 1:2 including 5% water
proofing material or in proportion
as specied by the manufactures
including supply of all material,
labour T & P etc. required for
proper completion of work.

2 5.33 0.23 2.45


3 3.23 0.23 2.23
1 8.00 0.23 1.84
2 2.03 0.23 0.93
Deduction 4 0.23 0.12 -0.11
7.35 Sqm 464.22 3411.32
5(a) 1031 + Ist. Class brick work in 1:4 cement
1035 + and coarse sand in super structure
1036 + including supply of all material,
labour T & P etc. required for proper
completion of work.

1 3.83 0.23 3.00 2.64 cum


1 5.83 0.23 3.00 4.02 cum
1 2.73 0.23 3.00 1.88 cum
2 2.03 0.23 3.00 2.80 cum
2 3.23 0.23 3.00 4.46 cum
Varanda Piller 1 0.23 0.23 2.10 0.11 cum
Parapet Wall 1 20.05 0.23 0.08 0.35 cum
In Column 2 0.35 0.23 1.30 0.21 cum
front stair 2 3.60 0.23 0.15 0.25 cum
16.72 cum
Deduction (-)
D1 1 1.10 0.23 2.10 -0.53 cum
D 1 1.00 0.23 2.10 -0.48 cum
Lintel -D 2 1.40 0.23 0.15 -0.10 cum
Lintel -W 4 0.90 0.23 0.15 -0.12 cum
RCC Jali 2 0.60 0.30 0.23 -0.93 cum
W 4 0.90 0.23 1.50 -1.24 cum
Net Qty. 13.32 cum 8853.21 117891.12
6 Bore-well Chamber -
1031 Brick work (1:4) 4 1.03 0.23 1.2 1.14 cum 7975.97 9092.61
7 1149 Supply and fixing of M.S. angle
iron chaukhats of 40 mm x 40 mm
x 5 mm with M.S. sheet door
shutter including simple moulding
straightg work as in chaukhats
and also supply of all
material, labour T & P etc.
required for proper completion of
work.
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
Angle Iron
For D1 1 6.40 6.40 m
For D 1 6.20 6.20 m
For W 4 4.80 19.20 m
31.80 m
Weight @ 3 Kg/m 0.95 Qtl
M.S. Sheet
For D1 1 1.10 2.10 2.31 Sqm
For D 1 1.00 2.10 2.10 Sqm
For W 4 0.90 1.50 5.40 Sqm
9.81 Sqm
Weight @ 9.80 Kg/Sqm 0.96 Qtl.
Total Weight 1.92 Qtl. 12185.26 23339.40
8 MR Supply and fixing of hold fast
of doors and windows
chaukhats already moulded on
chaukhats in P.C.C. 1:2:4
etc.required in all respect to
complete the work.
28 28 Nos. 150.00 4200.00
9 1019 R.C.C. work with cement,coarse
sand and 20 mm gauge approved
stone ballast in proportion of
1:1.5:3 in sun shed and lintel on
doors and windows excluding
supply of reinforcement and its
bending but including its fixing
and binding the same with 0.50
mm thick binding wire and the cost
of binding wire and including
necessary centering and
shuttering supply of all
material, labour T & P etc.
required for proper completion of
work.

Lintel - D1 1 1.40 0.23 0.15 0.05 cum


For D 1 1.30 0.23 0.15 0.04 cum
For W 4 1.20 0.23 0.15 0.17 cum
1 1.50 0.23 0.15 0.05 cum
Sunshade lintel 4 1.20 0.45 0.07 0.15 cum
Varandah 1 5.66 0.45 0.075 0.19 cum
0.65 cum 14123.75 9180.44
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
10 1024 Same as item no.8 but in slab of
pump house
In Slab 1 4.26 3.66 0.125 1.95 cum
varandah beam 1 3.46 0.23 0.15 0.12 cum
1 2.13 3.16 0.125 0.84 cum
Verandah 1 3.23 1.73 0.125 0.70 cum
Total 3.61 cum 16842.55 60801.61
11 1151 M. S. or iron work in plain work such
as R.C.C. or R.B. work (when not
included in over all rates) brought to
required shape as necessary
including bending for proper
completion of the work including
supply of steel and its wastage.

1 4.25 Qtl. 11089.98 47132.42


12 Supply and fixing of door and
window shutter
D 1.00 1.10 2.10 2.31 sqm 1776.00 4102.56
D1 1.00 1.00 2.10 2.10 sqm 1776.00 3729.60
Window 4.00 0.90 1.50 5.40 sqm 1776.00 9590.40
13 1188 12 mm thick plaster with cement
and coarse sand mortar I:4 over
brick work minimum thickness not
to be less than 10 mm including
supply of all material, labour T & P
etc. required for proper
completion of work.

In Wall 2 3.60 3.00 21.60 Sqm


2 3.00 3.00 18.00 Sqm
chlorinator 2 2.50 3.00 15.00 Sqm
2 1.80 3.00 10.80 Sqm
1 3.23 3.00 9.69 Sqm
1 1.50 3.00 4.50 Sqm
1 4.06 3.35 13.60 Sqm
1 3.46 3.35 11.59 Sqm
1 2.26 3.35 7.57 Sqm
1 2.96 3.35 9.92 Sqm
1 2.03 3.35 6.80 Sqm
plaster at chaukhat 1 10.00 Sqm
Varanda Piller 4 0.23 2.40 2.21 Sqm
Parapet 1 20.50 0.23 4.72 Sqm
2 20.50 0.07 2.87 Sqm
In Column 2x2 0.35 1.50 2.10 Sqm
2x2 0.23 1.50 1.38 Sqm
Deduction (-)
for D1 2 1.00 2.10 -4.20 Sqm
for D 2 1.10 2.10 -4.62 Sqm
For W 8 0.90 1.50 -10.80 Sqm
Net Qty. 132.73 Sqm 274.50 36434.39
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
14 Same as item no. 13 but in
1:4 cement sand mortar but
1188+1 over ceiling Plaster including
191 supply of all material, labour T & P
etc. required for proper completion
of work.
1 3.60 3.00 10.80
1 2.50 1.80 4.50
1 1.27 3.00 3.81
19.11 Sqm 304.45 5818.04
15 Supply and fixing of 22 mm wide and
3 mm thick glass strips in panels
including supply of all material,
labour T & P etc. required for proper
completion of work.

2 3.60 7.20
3 3.00 9.00
2x2 2.25 9.00
1 2.25 2.25
2 1.12 2.24
Apron 1 20.10 20.10
49.79 Rm 36.37 1810.86
16 1202 25 mm thick 1:2:4 plain
cement concrete floor with cement
coarse sand and 20 mm gauge
stone ballast laid in pannels
finished with 3 mm floating coat
of neat cement or cement and
marble dust in ratio 1:5 as
specified and removing any
overlaping or mortar at the joints of
panels if any and giving them
uniform finish including.

1 3.00 3.60 10.80


1 2.50 1.80 4.50
1 1.50 3.35 5.03
for Apron 1 20.10 0.6 12.06
32.39 Sqm 896.27 29025.70
17 1232 + Painting or varnishing new work or
1233 new wood work in small areas with
one priming coat and two coat of
approved quality paint or varnish
including supply of all material,
labour T & P etc. required for
proper completion of work.

For D 1x2 1.10 2.10 4.62 Sqm


For D1 1x2 1.00 2.10 4.20 Sqm
For W 2x4 0.90 1.50 10.80 Sqm
for girder 1 3.46 0.58 16.05 Sqm
35.67 Sqm 238.31 8501.57
18 1253 White washing three coat
including supply of all material,
labour T & P etc. required for
proper completion of work.
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
In Wall 2 3.60 3.00 21.60 Sqm
2 3.00 3.00 18.00 Sqm
2 2.50 3.00 15.00 Sqm
2 1.80 3.00 10.80 Sqm
1 3.60 3.00 10.80 Sqm
1 2.50 1.80 4.50 Sqm
1 3.23 1.50 4.85 Sqm
4 1.20 0.45 2.16 Sqm
1 5.5 0.45 2.475 Sqm
90.18 Sqm 33.47 3018.32
19 MR Finishing walls with water proof
cement paint of approved make
(Apex painting) and quality on new
work with two coats to give an
even shade including supply of all
material, labour T & P etc. required
for proper completion of work.

1 3.46 3.35 11.59 Sqm


1 4.06 3.35 13.60 Sqm
1 3.26 3.13 10.20 Sqm
1 1.50 3.13 4.70 Sqm
1 2.26 3.35 7.57 Sqm
1 2.96 3.35 9.92 Sqm
1 2.03 3.35 6.80 Sqm
Verandah Piller 4 0.23 2.40 2.21 Sqm
Parapet 2 20.50 0.07 2.87 Sqm
1 20.50 0.23 4.72 Sqm
In Column 2 0.23 1.50 1.38 Sqm
2 0.35 1.50 2.10 Sqm
Deduction (-)
for D1 1 1.00 2.10 -2.10 Sqm
for D 1 1.10 2.10 -2.31 Sqm
For W 4 0.90 1.50 -5.40 Sqm
Net Qty. 67.84 Sqm 400.00 27136.52
20 1149 Supply and fixing of Girder of 250
mm x 125mm size over the
pump house including its painting
with approved quality paint and
also one priming coat.

Girder 1 3.46 3.46 m


ISMB 250x 125 @37.30Kg/m 1.29 Qtl. 12185.26 15726.05
21 1004 Sand filling in plinth in pump
house and chloronating room
including supply of all material,
labour T&P etc. required for proper
completion of work.

1 2.88 3.49 0.30 3.01


1 2.39 1.69 0.30 1.21
1 2.88 1.15 0.30 0.99
5.21 cum 1617.56 8427.49
S.N. SOR SCHEDULE ITEM NO. No. L. B. H. QTY. Unit Rate Amount
Ref.
23 MR Supply & Fix 90 mm dia P.V.C. down
pipes complete with rose &
bend and gratings with M.S.
clamps 25 X 3 mm fixed on walls & 1 7.00 7.00 Rm 150.00 1050.00
supply of 150 mm long, 6 mm dia
nails complete.

24 1024 Construction of R.C.C. 1:1.50:3


manhole cover 70x70 cm for
opening in roof slab and fixing it at
opening including supply of all
material, labour T&P etc. complete.
1 0.70 0.70 0.12 0.06 cum 16842.55 1010.55
25 MR Making opening in walls of size
60x30 cm supply and fixing of R.C.C.
jalies and plastering the same
including supply of all material, 2 2 each 600.00 1200.00
labour T&P etc. complete.

Supply and laying 40mm thick


26 1167 insulation layer of sand and clay over
roof

1 3.6 3 10.80 Sqm


1 2.5 1.8 4.50 Sqm
1 3 1.27 3.81 Sqm
total 19.11 Sqm 125.11 2390.85

Supply and fixing of oxidised iron


27 1143 fitting of approved make for doors 1 7.20 Sqm 800.00 5760.00
and window

Site clearance and other unforeseen


28 items Job each L.S. 706.42

TOTAL 626000.00
Or in lacs 6.26

ASSISTANT ENGINEER
UNIT ESTIMATE OF BYEPASS CHAMBER
Sl.
Ref. Description Qty. Unit Rate Amount
No.
1 2 3 4 5 6
1- 1001 Excavation in foundation in ordinary soil (loam,
clay or sand) including lift upto 1.50m and lead
upto 50m and refilling, watering, ramming of
excavated earth into the space betwwen the
building and sides of foundation trenches or
into the plinth and disposal of surplus earth
upto the distance of 50m from the center of
the foundation trenches. 0.66 Cum 247.07 163.07
2- 1031 Ist. Class brick work in 1:4 cement and
Coarse sand in foundation and plinth
including supply of all material, labour T &
P etc. required for proper completion of
work.
1.36 Cum 7975.97 10847.32
3 1017 Concrete with 40mm gauge Stone ballast,
coarse sand and cement in proportion of 8:4:1
in foundation and floors including supply of all
materials, labour, T&P etc. required for proper
completion of the work. 0.17 Cum 8564.50 1455.97
4- MR Supply cutting and dressing with size
and fixing V-Notch of size 90 x90 cm in
the by pass chamber including
prepration of by pass chamber as per
direction of E/I including supply of all
material, labour T & P etc. required for 1 each 7000.00 4537.20
proper completion of work.

5- 1206 40 mm thick 1:2:4 plain cement concrete floor


with cement, coarse sand and 20 mm gauge
stone ballast, land in panels, finished with 3mm
floating coat of neat cement , including supply
of all materials, labour T&P etc. required for
proper completion of the work. 1 Sqm 625.18 625.18
1188 12 mm thick plaster with cement and local sand
mortor in 1:4 over brick work minimum
6 thickness not to be less than 10mm including
supply of all materials, labour, T&P etc.
required for proper completion of the work. 12.50 Sqm 274.50 3431.25
Supply
7- rate + Supply & fixing 160mm dia 6kg/F PVC pipe 3.00 M 769.72 2309.16
2045

8- Supply of PVC special. L.S. 10% of item no.6 230.92


9- Site Clearance and other unforeseen items Job L.S. 399.94
Total Rs. 24000.00
Say Rs. 24000.00