Where,
Pn = Design population (after n years)
Pp = Present population (at the start of design period)
r = Annual population growth rate
n = Design period in years.
Source: - The 1994 population and housing census of Ethiopia, Result
of country level volume 2Analytical report, June 1999
Year 2019 2020 2021- 2026-2030 2031-2035
2025
Water sources
The water supply source for Garssa village will be from one deep wel
having a discharge of around 8.6l/s .( with low investment cost because
Ground water supply projects need no treatment process)
Population distribution by mode of service
Taking into account Willingness to pay and Institutional capacity of the
village the proposed projected modes of services is given. At the end of
the design period it is planned that all households will receive water from
the Water Supply Service.
3.3.4.2 Per capita Water Demand
The amount of water used per person per day for daily life and activity is
known as per capita water demand which uses as a base for estimating the
domestic water demand of communities.
0.089954099 0.113138146 M
89.95409941 113.1381456 mm
3
Where, Q=0.0035m /s , L=120m/for GS pipe/ , C=120 , D=0.1m , Hd=120 Hf=2, Hm=0.2
HTnet=120+2+0.2=122.2M
2.Determination of economical diameter
From ground surface to service reservoir
Q = 8.6l/s
Let us take 113 mm (from above table) ,OD
140mmPN 16with internal diameter 113.2mm and
delivery head 144.7
Check for velocity:
V = Q/A, A=4*10 -3M2
V = 1.38m/sec<2m/s………….ok.
Head Calculation
The required head is calculated as follows:
Hnet =Hd+Hf+Hm+Ht
From surface of bore hole to service reservoir
Hf1=10.67(Q/C)1.852*(L/(D4.87))
3
Where, Q=0.0035m /s , L=1660=1700m/for HDEP/ C=150 ,
HTnet=144.7+10.5+1.05+3=159.37
Let us take 159.37 as a total head
So that the Total head from the pump position to the service
reservoir is=159.37+122.2=281.59
Determination of capacity of booster station and service
reservoir
Capacity of booster service reservoir for the village is determined
using simplified empirical method commonly practical in many
water supply projects.
Therefore, Capacity of booster station = 30*MDD*60 (30 minute
detination time)
=30*8.6*60=15000 L = 20m3recommendable
Capacity of reservoir = 1/3*MDD
=1/3*310.25 =103m3 =
100m3recommendable
Power calculation of submersible pump
QH
Power =
efficiency
P = Power input to the pump in KW
Power = 9.81* 0.0086*123
0.65