2.1 Verification for the Qualification of MPI Personnel and MPI Procedure.
Practice No. SNT-TC-1A, ACCP or any other recognized national certification program
that shall be acceptable to the company for the test method used. Only Level II or III
In this project ,NDT personnel should acquire ASNT certificates .Besides, if EMPLOYER
agree, other NDT certificates can be used ,such as‖ General Administration of Quality
All MPI Personnel shall also pass visual acuity Test to Jaeger J2.
All the equipments and instruments involved in this MPI activity must be calibrated,
The following equipments, tools and material shall be used for the project.
Prior to use, the magnetizing power of electromagnetic yokes shall have been checked
The magnetizing power of all yokes shall be checked whenever the yoke has been
damaged or repaired.
Yokes and permanent magnetics (when allowed) shall be dead weight tested every 6
month. Alternating current yokes shall have a lifting force of at least 10 lb (45 N), with a
2 to 4-in. (50 to 100-mm) spacing between legs. Direct current yokes shall have a lifting
force of at least 30 lb (135 N), with a 2 to 4-in. (50 to 100-mm) spacing between legs, or
The shims are available in two thicknesses, 0.002 in. (0.05 mm) and 0.004 in. (0.10
mm). Thinner shims are used when the thicker shims cannot conform to the part surface
Shims shall be used as specified in AS 5371. Shims are placed in the area(s) of interest
with notches toward the surface of the part being examined. Use enough shims or place
the shims in multiple areas to ensure proper field directions and strengths are obtained.
The magnetic particles must have high permeability to allow ease of magnetizing and
attraction to the discontinuity and low retentively so they will not be attracted (magnetic
agglomeration) to each other. Control of particle size and shape is required to obtain
consistent results. The particles should be nontoxic, free from rust, grease, paint, dirt,
and other deleterious materials that might interfere with their use. Both dry and wet
particles are considered safe when used in accordance with the manufacturer’s
instructions. They generally afford a very low hazard potential with regard to flammability
and toxicity.
In this project, we plan to use MPI ink canned and white contrast enhancement agent
In this project, we plan to use MPI ink canned and white contrast enhancement agent
Adopting wet particles to conduct weld inspection, the temperature shall be no higher
than 55℃.
EXAMINATION.
Magnetic suspension liquid: when conducting wet magnetic inspection, petroleum ether
Direct or rectified magnetizing current shall be used. The current shall be 100(minimum)
amp/in. (4 amp/mm) to 125 (maximum) amp/in. (5 amp/mm) of prod spacing for sections
3/4 in. (19mm) thick or greater. For sections less than 3/4 in.(19 mm) thick, the current
shall be 90 amp/in. (3.6 amp/mm) to 110 amp/in. (4.4 amp.mm ) of prod spacing.
each area. During the second examination, the lines of magnetic flux shall be
Magnetic Field Strength: Fixed load experiment to the magnetic yoke shall be
conducted every 6 months. When the pole spacing is between 2 and 6 inches (50 ~150
(4.5kg). When the pole spacing is between 2 and 4 inches (50 ~100 mm), direct current
electromagnetic yoke shall have a lifting power of at least 30lb (13.5kg). As to the pole
spacing in the range of 4 inches to 6 inches (100 ~ 150 mm), the direct current
The dangling modes shall be used in order to form a magnetic force which shall be
strong enough to remove the redundant magnetic particles. What should note here is
that the magnetic force can’t be too strong, because extra strong magnetic force will
interfere with the adhesion of magnetic particle in the imperfect area of magnetic flux
leakage.
In general, the surface of the part is in the as-welded, as-rolled, as-cast, or as-forged
The surface to be examined and all adjacent areas within at least 25 mm. shall be dry
and free of any extraneous matter that could interfere with the examination.
50mm both sides of the line of between articulated poles, but effective inspection range
is the zone which artificial defect in standard shim can display clearly. Magnetization
Area inspected of work piece shall be magnetization twice; Magnetic force line shall be
be applied either by spraying or flowing over the areas to be inspected during the
formation and retention. For the continuous technique multiple current shots should be
applied. The last shot should be applied after the particle flow has been diverted and
while the particle bath is still on the part. A single shot may be sufficient. Care should be
taken to prevent damage to a part due to overheating or other causes. Since fine or
China Petroleum Pipeline Bureau (Sudan)
中国石油天然气管道局(苏丹)
weakly held indications on highly finished or polished surfaces may be washed away or
obliterated, care must be taken to prevent high-velocity flow over critical surfaces and to
cut off the bath application before removing the magnetic field. Since a residual field has
a lower intensity than a continuous field, less pronounced indications tend to form.
1) The magnetic particles used for obtaining patterns of discontinuities shall be non-
toxic and shall provide adequate contrast with the surface being examined.
2) The magnetic particles used for obtaining patterns of discontinuities shall be capable
3) White background contrast shall be used with black magnetic ink particles and shall
not corrode or otherwise adversely affect the integrity of the steel components being
examined.
Visible Light Intensity—The intensity of the visible light at the surface of the part/work
piece undergoing examination should be a minimum of 100 foot candles (1000 lux). For
some field inspections using non fluore scent particles, visible light intensities as low as
50 foot candles (500 lux) may be used when agreed on by the contracting agency.
When identify fine magnetic particle indication, the magnifier of 5~10 times can be used.
(14) Demagnetization
When residual magnetism in the part could interfere with subsequent processing or
usage, the part shall be demagnetized any time after completion of the examination.
There are several kinds of demagnetization methods, demagnetizing with yokes for this
demagnetization by placing the poles on the surface, moving them around the area, and
indicated by the use of appropriate magnetic field indicators or field strength meters.
After demagnetization residual fields should not exceed 3 G (240 Am−1) anywhere in
the piece, absolute value, unless otherwise agreed upon or as specified on the
could interfere with subsequent processing or with service requirements. Extent of post-
China Petroleum Pipeline Bureau (Sudan)
中国石油天然气管道局(苏丹)
cleaning required shall be the surface to be examined and all adjacent areas within at
Means of particle removal for this project: removal of wet particles by flushing with solvent.
Other suitable post-examination cleaning techniques may be used if they will not interfere with
subsequent requirements.
Only Level II or III MPI personnel shall interpret the magnetic particle indication.
The report shall be submitted to the EMPLOYER after completion. The final judgment
2.9 Repair
The repaired area of weld shall be inspected by the original inspection method. The
MPI Report shall be signed & verified by level Ⅱor Ⅲ personnel and transfer to
EMPLOYER for approval. MPI reports shall prepare two copies, one for EMPLOYER
the other for Contractor. Report & relative information should be kept properly till hand-
over to EMPLOYER.
2.11 Evaluation
Only indications which have any dimension greater than 1, 6 mm shall be considered
relevant. A linear indication is one having a length greater than three times the width.
A rounded indication is one of circular or elliptical shape with a length equal to or less
China Petroleum Pipeline Bureau (Sudan)
中国石油天然气管道局(苏丹)
than three times the width.
An indication of an imperfection may be larger than the imperfection that causes it;
however, the size of the indication is the basis for acceptance evaluation.
Acceptance standards
Four or more relevant rounded indications in a line, separated by 1, 6mm or less, edge
to edge.