20230220-9192 Letter-SAAB To GM (Design) - Submission of Feasibility Study Report
20230220-9192 Letter-SAAB To GM (Design) - Submission of Feasibility Study Report
Sub: Feasibility Studies and Detailed Design for Construction of Road from More
Khunda to Habo by Bala District Nankana Sahib (56 km)
SUBMISSION OF FEASIBILITY STUDY REPORT
Dear Sir,
It is to inform your good self that with this submission, all the deliverables for Stage-1
(Feasibility Stage) have been completed. You are therefore requested to convey your
approval of the submittals, so that we can proceed further to Stage-2 (Detailed
Design Stage).
Thanking you and assuring you of our best services at all times.
For and on behalf of M/s Asif Ali & Associates (Pvt) Ltd in JV with M/s A.A
Associates & M/s Pakistan Engineering Tech.(Sub-Consultant)
__________________
Usman Riaz
Director
Encl: As above