DGPC/HRDC/CoECBM/CBMA-22(C)/2023/ 09th May, 2023

The Head
Mechanical Maintenance Unit
Chukha Hydropower Plant
Chukha

Sub: Magnetic Particle Test and Pump Vibration Measurement Reports and Bill

Sir,

Please find enclosed herewith the report along with the bill for carrying out the Magnetic Particle test
on the runner buckets of Generating Unit -3 and Pump vibration measurement on CWP 1, 2 & 3 at
CHP. The test was conducted on 04.05.2023 by CBMA Unit.

This is for your kind perusal and necessary action at your end please.

Thanking you,

Yours faithfully,

(Sherub Tharchen)
Head, CBMA Unit

Copy to:

1. Director, O&MD, Druk Green (soft copy)


2. Head of the Plant, CHP, Druk Green (soft copy)
3. Head, HRDC, Druk Green (soft copy)
4. Head, E&PD, O&MD, Druk Green (soft copy)
5. Head, CoECBM, HRDC, Druk Green (soft copy)
6. Head, Maintenance Division, CHP, Druk Green (soft copy)
7. Case File

Condition Based Mechanical Assessment (CBMA) Unit


Centre of Excellence for Condition Based Monitoring (CoECBM) Division
Hydropower Research & Development Centre
DRUK GREEN POWER CORPORATION LIMITED
Rinchentshe, Chhukha Dzongkhag, Web: www.drukgreen.bt
BILL

DGPC/HRDC/CoECBM/CBMA-22(C)/2023/ 09th May, 2023

The Head
Mechanical Maintenance Unit
Chukha Hydropower Plant
Chukha

No. of
SN Details of Charges Rate Amount Remarks
Days
(a) Equipment Hire Charge (MPI) 1 2,262.00 2,262.00
(b) Equipment Hire Charge (Scout 100) 1 3,863.00 3,863.00
Analyst Service Charge for AEE (Yeshi
(c) 1 6,072.00 6,072.00
Choden)
(d) Analyst Charge SO (Yeshi Wangmo) 1 4,340.00 4,340.00
Total Nu. 16,537.00

(e) Vehicle Charges (Personal Car) = Nu. 16 x 128 Km


= Nu. 2,048.00

(f) DSA for 1 AEE for 1 day = Nu. 1,500.00

(g) DSA for 1 SO for 2 day = Nu. 1,250.00

Total Amount (Test charges + other charges) = Nu. 21,335.00

Deposit the amount in the THP account number provided below and the scanned copy of the deposited
slip may be kindly sent to us for an adjustment.

Name of the Bank: Bank of Bhutan


Branch : Gedu
Account No. : 102486164

(Yeshi Wangmo)
SO (M)
CBMA Unit, HRDC

Condition Based Mechanical Assessment (CBMA) Unit


Centre of Excellence for Condition Based Monitoring (CoECBM) Division
Hydropower Research & Development Centre
DRUK GREEN POWER CORPORATION LIMITED
Rinchentshe, Chhukha Dzongkhag, Web: www.drukgreen.bt