You are on page 1of 1

7 6 5 4 3 2 1

3PH, 3W, 60Hz, 480V SWGR 1-31A (1AP831EA), 3200A, 65KA

3PH, 3W, 6.9KV, 60Hz 1-31A 1-31A F1 F2 F3 1-31T


6.9kV SWGR 1-11A (1AP811EA)

3 FUSE, 2A EO EO EO
B

EO A EO
E E
SST 1-21A C 3-PT’S
(1AP821EA) 480/ 3/120/ 3V
B 100VA, 1.0 CL.
6900-480V
A
2.0/2.5 MVA 51G
C 3 FUSE, 2A
Dyn1 AA/FA 1XCT1 ALARM
TO 2 FUSE, 2A
Z=5.75% @ 2MVA 20/5A AM DCS
OCTC %%P 2x2.5% 40VA,5P20

1XCT2
SPARE
20/5A 1-VT
40VA,5P20 480/120V
100VA, 1.0 CL.

NGR VS

(1AP892EA)
27.7 OHM
10A/10SEC
V
0.277V

3200A (1AP808EA)

D REFERENCE SCHEMATIC - 1AP013 - 1AP016 1AP017 - 1AP015 D

BREAKER RATING - 3200F/3200AT - 800F/800AT 800F/800AT 800F/800AT 3200F/3200AT

COMMON STATION SERVICE


SERVICE MAIN BREAKER SWGR INCOMER-1 POTENTIAL TRANSFORMER U1 480V MCC 41A1 U1 480V MCC 41A2 SPARE TIE BREAKER 31A/31B
TRANSFORMER 1-21 A

EQUIPMENT NUMBER 1AP821EA 1AP831EA1 - 1AP841E 1AP842E - 1AP831EAB

3PH, 3W, 60Hz, 480V SWGR 1-31B (1AP831EB), 3200A, 65KA

F1 F2 F3 1-31B 1-31B 3PH, 3W, 6.9KV, 60Hz


C 6.9kV SWGR 1-11B (1AP811EB) C

EO EO EO 3 FUSE, 2A
B

A EO

3-PT’S C SST 1-21B


480/ 3/120/ 3V (1AP821EB)
100VA, 1.0 CL. B
6900-480V
A
51G 2.0/2.5 MVA
3 FUSE, 2A C 1XCT1
ALARM AA/FA Dyn1
2 FUSE, 2A 20/5A
TO AM Z=5.75% @ 2MVA
DCS 40VA,5P20
OCTC %%P 2x2.5%
1XCT2
SPARE
1-VT 20/5A

480/120V 40VA,5P20

100VA, 1.0 CL.


VS NGR
(1AP892EB)
27.7 OHM
10A/10SEC
V
0.277V

3200A (1AP808EB)

B B

REFERENCE SCHEMATIC 1AP018 1AP019 - 1AP014


- -
CONTRACTOR/INSTALLER SHALL TAKE ALL
APPROPRIATE PRECAUTIONS TO ENSURE THE SAFETY
BREAKER RATING 800F/800AT 800F/800AT 800F/800AT - 3200F/3200AT - OF ALL PEOPLE LOCATED ON THE WORK SITE,
INCLUDING CONTRACTOR’S/INSTALLER’S PERSONNEL
(OR THAT OF ITS SUB-CONTRACTOR(S))
COMMON STATION SERVICE PERFORMING THE WORK.
SERVICE U1 480V MCC 41B1 U1 480V MCC 41B2 SPARE POTENTIAL TRANSFORMER MAIN BREAKER SWGR INCOMER-2
TRANSFORMER 1-21B Contractors: Engineers:

EQUIPMENT NUMBER 1AP844E 1AP845E - - 1AP831EA1 1AP821EB

Client:

PROJECT NO.: 12889-001

Project Title:

PACO POWER PLANT

DRAWING TITLE

A A

KEY DIAGRAM

LOW VOLTAGE SWITCHGEAR


DRAWING RELEASE RECORD 1-31A & B
REV. DATE REL’D. PREPARED REVIEWED APPROVED PURPOSE (1AP831EA/B)
0 12SEP2014 K.PORECHA/V.PATEL R.DESAI/K.PATEL Y.MISHRA/K.NOMANBHOY ISSUED FOR CONSTRUCTION
DRAWING NUMBER REVISION

E1-3101
0
SHEET 002 OF 002

7 6 5 4 3 2 1

CAD FILE: E1-3101-002.DGN