METRADO EMISOR ALCANTARILLADO 200 MM
METRADO EMISOR ALCANTARILLADO 200 MM
PROYECTO: “Mejoramiento del sistema de agua potable e instalación del sistema de alcantarillado y tratamiento de aguas residuales en el Centro
Poblado de Carampa, Distrito Alcamenca, Provincia de Fajardo, Ayacucho
Numero
Item Descripción Und. Cantidad Largo Ancho Alto Parcial Metrado
Veces
03.00 INSTALACION DE RED DE ALCANTARILLADO
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL M2 1,310.78
TRAMO 01 BZ32 @ BZ148 200 1.00 1.00 26.00 2.20 57.20
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 2.20 108.77
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 2.20 77.22
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 2.20 53.94
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 2.20 48.84
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 2.20 73.13
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 2.20 42.72
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 2.20 156.31
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 2.20 129.84
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 2.20 29.52
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 2.20 125.16
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 2.20 176.00
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 2.20 127.93
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 2.20 104.19
TRAMO 01 BZ32 @ BZ148 200 0.85 1.00 26.00 0.80 1.20 21.22
TRAMO 02 BZ148 @ BZ149 200 0.85 1.00 49.44 0.80 2.11 70.94
TRAMO 03 BZ149 @ BZ150 200 0.85 1.00 35.10 0.80 3.62 86.40
TRAMO 04 BZ150 @ BZ151 200 0.85 1.00 24.52 0.80 2.71 45.19
TRAMO 05 BZ151 @ BZ152 200 0.85 1.00 22.20 0.80 1.20 18.12
TRAMO 06 BZ153 @ BZ154 200 0.85 1.00 33.24 0.80 3.34 75.49
TRAMO 07 BZ154 @ BZ155 200 0.85 1.00 19.42 0.80 3.66 48.33
TRAMO 08 BZ155 @ BZ156 200 0.85 1.00 71.05 0.80 1.52 73.44
TRAMO 09 BZ156 @ BZ157 200 0.85 1.00 59.02 0.80 1.20 48.16
TRAMO 10 BZ157 @ BZ158 200 0.85 1.00 13.42 0.80 1.20 10.95
TRAMO 11 BZ157 @ BZ158 200 0.85 1.00 56.89 0.80 2.24 86.65
TRAMO 12 BZ158 @ BZ159 200 0.85 1.00 80.00 0.80 2.24 121.86
TRAMO 13 BZ159 @ BZ160 200 0.85 1.00 58.15 0.80 1.20 47.45
TRAMO 14 BZ160 @ BZ161 200 0.85 1.00 47.36 0.80 1.20 38.65
PROYECTO: “Mejoramiento del sistema de agua potable e instalación del sistema de alcantarillado y tratamiento de aguas residuales en el Centro
Poblado de Carampa, Distrito Alcamenca, Provincia de Fajardo, Ayacucho
Numero
Item Descripción Und. Cantidad Largo Ancho Alto Parcial Metrado
Veces
TRAMO 11 BZ157 @ BZ158 200 0.15 1.00 56.89 0.80 2.24 15.29
TRAMO 12 BZ158 @ BZ159 200 0.15 1.00 80.00 0.80 2.24 21.50
03.02.03 TRAMO 13 BZ159 @ BZ160 200 0.15 1.00 58.15 0.80 1.20 8.37 6.82
TRAMO 14 BZ160 @ BZ161 200 0.15 1.00 47.36 0.80 1.20 6.82
03.02.04 ZARANDEADO DE MATERIAL PROCEDENTE DE EXCAVACION m3 373.10
TRAMO 01 BZ32 @ BZ148 200 0.40 1.00 26.00 0.80 1.20 9.98
TRAMO 02 BZ148 @ BZ149 200 0.40 1.00 49.44 0.80 2.11 33.38
TRAMO 03 BZ149 @ BZ150 200 0.40 1.00 35.10 0.80 3.62 40.66
TRAMO 04 BZ150 @ BZ151 200 0.40 1.00 24.52 0.80 2.71 21.26
TRAMO 05 BZ151 @ BZ152 200 0.40 1.00 22.20 0.80 1.20 8.52
TRAMO 06 BZ153 @ BZ154 200 0.40 1.00 33.24 0.80 3.34 35.53
TRAMO 07 BZ154 @ BZ155 200 0.40 1.00 19.42 0.80 3.66 22.74
TRAMO 08 BZ155 @ BZ156 200 0.40 1.00 71.05 0.80 1.52 34.56
TRAMO 09 BZ156 @ BZ157 200 0.40 1.00 59.02 0.80 1.20 22.66
TRAMO 10 BZ157 @ BZ158 200 0.40 1.00 13.42 0.80 1.20 5.15
TRAMO 11 BZ157 @ BZ158 200 0.40 1.00 56.89 0.80 2.24 40.78
TRAMO 12 BZ158 @ BZ159 200 0.40 1.00 80.00 0.80 2.24 57.34
TRAMO 13 BZ159 @ BZ160 200 0.40 1.00 58.15 0.80 1.20 22.33
TRAMO 14 BZ160 @ BZ161 200 0.40 1.00 47.36 0.80 1.20 18.19
PROYECTO: “Mejoramiento del sistema de agua potable e instalación del sistema de alcantarillado y tratamiento de aguas residuales en el Centro
Poblado de Carampa, Distrito Alcamenca, Provincia de Fajardo, Ayacucho
Numero
Item Descripción Und. Cantidad Largo Ancho Alto Parcial Metrado
Veces
TRAMO 02 BZ148 @ BZ149 200 1.00 1.00 49.44 49.44
TRAMO 03 BZ149 @ BZ150 200 1.00 1.00 35.10 35.10
TRAMO 04 BZ150 @ BZ151 200 1.00 1.00 24.52 24.52
TRAMO 05 BZ151 @ BZ152 200 1.00 1.00 22.20 22.20
TRAMO 06 BZ153 @ BZ154 200 1.00 1.00 33.24 33.24
TRAMO 07 BZ154 @ BZ155 200 1.00 1.00 19.42 19.42
TRAMO 08 BZ155 @ BZ156 200 1.00 1.00 71.05 71.05
TRAMO 09 BZ156 @ BZ157 200 1.00 1.00 59.02 59.02
TRAMO 10 BZ157 @ BZ158 200 1.00 1.00 13.42 13.42
TRAMO 11 BZ157 @ BZ158 200 1.00 1.00 56.89 56.89
TRAMO 12 BZ158 @ BZ159 200 1.00 1.00 80.00 80.00
TRAMO 13 BZ159 @ BZ160 200 1.00 1.00 58.15 58.15
TRAMO 14 BZ160 @ BZ161 200 1.00 1.00 47.36 47.36
03.04 BUZONES DIAM.=1.20M C/TAPA FºFº
03.04.01 EXCAVACION DE ESTRUCTURAS M3 53.17
0.20
0.20
Acero Horizontal
Escalinata
Para h = 2.0m
Acero para losa inferior N° Veces Ø 3/8" Ø 1/2" W(Kg/ml)
ml ml
1.40
2.00 1.70 1.02
1.26
6 4.00 1.56 1.02
0.87
2 4.00 1.17 1.02
Acero Vertical
0.20
Escalinata
0.20
0.20
Acero Horizontal
Escalinata
0.20
0.20
0.20
Acero Horizontal
Escalinata
W
Kg
3.47
6.36
4.77
23.72
25.50
4.59
68.41 Kg
TOTAL
H CANTIDAD ACERO POR BUZON KG
1.20 10.00 68.41
W 2.00 2.00 98.71
Kg 3.00 2.00 156.23
3.50 1.00 217.69
3.47 TOTAL 15.00 0.00
PROMEDIO POR BUZON
6.36
4.77
35.96
40.80
7.34
98.71 Kg
W
Kg
3.47
6.36
4.77
57.38
71.40
12.85
156.23 Kg
W
Kg
3.47
6.36
4.77
70.69
112.20
20.20
217.69 Kg
ACERO KG
684.11
197.41
312.47
217.69
1411.68
94.11