reports.
Finally, the quantity and quality of the ground water shall be checked
using these wells.
c. Electrical reconnaissance
Revision 5 Sub-Sec 4.5.3 - 21
Sumbawa-2 Gas Engine Power Plant (30 MW)
BOOK II
Part 4 Technical Requirements
Section 4.5 Civil and Structural Works
Sub-Section 4.5.3 Site Investigation
e. Electric Logging
f. Pumping tests
g. Analysis
a. Topography
b. Geology
c. Hydrology
d. Meteorology
e. Borehole records
f. Existing of well records, etc.
a. Size of well
b. Ground water level
c. Pumping quantity, etc.
Results to be obtained:
a. p-a Curve, Where p :Apparent resistivity
a :Distance between
Electrodes
b. Apparent resistivity depth probe
c. Distribution map of apparent resistivity
d. Expected geological cross section, etc.
Note :
Record to be obtained :
a. Resistivity
b. S.P log
6 Free CO2
7 Bicarbonate as CaCO3
8 Sulphate (SO4 mg/I)
9 Chloride (CI mg/I)
10 Oil Content
11 Calcium
12 Magnesium
13 Sodium
14 Iron
15 Zinkurn
16 Phospor
17 Mangaan
18 Fluor
19 Silicon
20 Copper
21 Plumburn
22 Mercury
23 Amonium NH4 mI/I
24 Nickel
25 Barium
Total suspended solid:
26
* Sulfur iron S mg/I
* Dissolved oxygen DO2 mg/I
* Chemical oxygen deman COD
KMnO4
at 100 ºC mg/I