You are on page 1of 1

On well, when performed performed drilling 8.

5” hole formation, at 3738 mMD carried out to start


pumping hidens. At depth 3750 mMD pressure was increased shown hidens passing through bit.
Directly, driller reduced the flowrate to maintain BHA condition so as not to be damaged by high
pressure from hidens passing through bit.

You might also like