map should clearly document and distribute it to the project team for review prior to the following meeting. Each
responsible party for the speci ed BIM Uses should also draft their work ow prior to the Design BIM Project
Execution Process meeting (Meeting 2).
Meeting 2: Design BIM Project Execution Process
CHAPTER 7 The Project Speci c BIM Use Process Maps shall contain a detailed process plan that clearly de nes the di erent
activities to be performed, who will perform them, and what information will be created and shared with future
processes. The agenda for this meeting will include:
Implementing the BIM Project Execution Planning 1. Review the initial BIM Goals and Uses
The categories and information should be compiled into the nal BIM Execution Plan format and distributed to
the project team in preparation for the nal plan review meeting.
Meeting 4: Review Final BIM Project Execution Plan
The agenda for this meeting will include:
This meeting should be attended by the owner, BIM managers, and all parties that are responsible for the
identi ed BIM Uses.
Tasks after Meeting 4
Once the meetings are complete, the BIM Project Execution Plan should be distributed to all parties and approved
as appropriate for the project and contracting structure. Team members should ensure that the plan monitoring
and updating procedure is implemented into the project controls system.
Planning Meeting Schedule
One of the rst tasks of the team is to determine the planning meeting schedule. This schedule should identify the
de ned meetings, along with the scheduled dates for the meeting. The team may decide that they wish to spread
the planning procedure across several weeks with one of the de ned meetings each week or every other week.
But they also may wish to de ne an accelerated planning schedule over several days with the team speci cally
focused on the development of the plan.
Monitoring Progress against the BIM Execution Plan
Once the initial BIM Execution Plan is created, it will need to be continuously communicated, monitored and
updated throughout the project. In particular, the Project Execution Plan should be embedded into appropriate
contracts, and then updated as needed when new team members join the project team. At a minimum, it is
valuable for the BIM managers from the various team members to meet on a monthly basis to discuss the
progress of the information modeling initiatives on the project and to address any implementation challenges that
team members may be encountering. These meetings may be incorporated with other team meetings, but it is
important to speci cally address issues that may arise in the implementation of the plan. It is important for the
team to continuously modify the planned process as needed due to the addition of team members, revisions to
available technology, changes to the overall project conditions, and to re ect the actual process that evolved. The
team should agree to a formal plan for accepting updates to the plan, and then accurately document any changes
to the original plan for communication to other team members, as well as for accurate future use and reference.